Enclosure 2 Technical Specifications.pdf

PDF 1 MB Posted

Attached to
RFP: 62-26 Emergency Bridge Deck & Joint Repairs at Various locations
Solicitation number
BD-26-1206-MBTA-MBTA-130055
Issued by
Massachusetts

About this file

This is a Technical Specifications document for the Massachusetts Bay Transportation Authority (MBTA) covering scheduled and emergency bridge deck and joint repairs at various locations on MBTA-owned roadway bridges. The contract encompasses work including installation, repair, or replacement of bridge joint systems; milling and paving of bridge decks and approaches; partial and full-depth excavation of deteriorated concrete decks; concrete preservation treatments using penetrant sealers, protective coatings, and epoxy healer-sealer treatments; and miscellaneous repairs to bridge appurtenances and related traffic management. The work incorporates the 2026 MassDOT Standard Specifications for Highways and Bridges (Divisions I, II, and III) and supplemental specifications dated March 31, 2026. Work locations may include bridges associated with the Red Line, Orange Line, Green Line, Blue Line, Mattapan High Speed Line, and Greenbush Line, with the MBTA reserving the right to modify, add, or remove locations through formal contract amendments. Work assignments are classified into three categories: Emergency Repairs (requiring commencement within four hours), Priority Repairs (within seven calendar days), and Scheduled Repairs (within thirty calendar days).

The contract establishes payment mechanisms through multiple line items including Item 100.1 Base Labor Rate (hourly compensation for artisans with specified compensation factors ranging from 1.00 to 1.23 for regular time), Item 748.1 Emergency Response (per mobilization), and various material and equipment items paid on time-and-materials bases for non-bid work plus ten percent markup. Non-response damages of $1,000 per day (or per hour for emergencies) are assessed for failure to meet milestone deadlines. The contractor must guarantee all materials and workmanship for one year after installation, provide a detailed project-specific Safety and Health Plan, submit materials for MBTA approval, and obtain 24/7 emergency notification capability. The contractor may not subcontract without prior MBTA approval. All work must comply with applicable federal, state, and local regulations, including OSHA, EPA, and Massachusetts Department of Labor requirements for hazardous materials handling, particularly lead paint removal on steel elements. Formwork must be removed within forty-five days of concrete placement, and concrete patches must cure for minimum periods before opening to traffic.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Bay Transportation Authority

Engineering and Maintenance Transit Facilities Maintenance

Enclosure 2: Technical contract specifications and Special Provisions

Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations

June 17, 2026

A. DEFINITION OF TERMS:

The following words, terms, references, or their pronouns used in the Commonwealth of Massachusetts Department of Transportation “Standard Specifications for Highways and Bridges” as supplemented and amended, shall be understood to mean as follows:

Department ...............................................................The Massachusetts Bay Transportation Authority (MBTA)

Engineer, Resident Engineer, Research & Materials Engineer, Bridge Engineer Authorized Employee or Representative of the MBTA

B. ADDITIONAL TERMS & INFORMATION.............................................................................. Page 4

C. CONSTRUCTION SPECIFICATIONS

i. This Contract Incorporates by Reference the following MassDOT Highway Division Standard Construction Specifications:

1. 2026 Standard Specifications for Highways and Bridges: Division I: General Requirements and Covenants

2. 2026 Standard Specifications for Highways and Bridges: Division II: Construction Details

3. 2026 Standard Specifications for Highways and Bridges: Division III: Materials Specifications

4. Supplemental Specifications (March 31, 2026)

ii. The following Documents Supplement and Modify the Standard Specifications in Section A above and are specific to this project. These two documents contain key information, vital to understanding this Contract.

1. SPECIAL PROVISIONS (INCLUDES SCOPE OF WORK 1 –

2. DRAWINGS AND SKETCHES 1 –

D. REQUESTED GOODS AND SERVICES PRICING .............................................................. FORM B.: 1 – 5

ADDITIONAL TERMS AND INFORMATION

1.1 Description

1.1 It is the intent of this contract to perform repairs to roadway bridge joints and roadway bridge decks, and associated work at various locations.

1.1 This contract incorporates the referenced MassDOT Highway Division 2026 Standard Specifications for Highways and Bridges, Divisions I, II, & III; as amended and supplemented. Prospective bidders are encouraged to read and understand these Standards.

1.1 The Special Provisions, and the Drawings and Sketches, provide key information, terms, and conditions essential to understanding the scope of this contract. The Scope of Work is contained with the Special Provisions, beginning on Page 1.

1.2 Terms

1.2 The contractor shall provide labor and management that will work in harmony with the MBTA personnel and contractors.

1.2 The contractor may not subcontract any or all work without prior approval of the MBTA.

1.2 The contractor must guarantee materials and workmanship are free of any defects for any maintenance or installed components for at least one year after installation.

1.2 Bidders shall refer to Appendix 1 for the detailed locations of the bridges to be repaired. The MBTA reserves the right, at its sole discretion, to modify, add, or remove locations throughout the term of the Contract. Any such changes shall be issued through a formal Contract Amendment, and the Contractor shall perform the Work in accordance with the revised locations as directed by the MBTA.

1.3 Submittals

1.3 Specified materials listed by Manufacturer and Model Number and materials listed on the MassDOT Qualified

Construction Materials List (QCML) are approved for use. At the time of each project, the Contractor shall notify the MBTA of which pre-approved materials are proposed for use. All other materials must be submitted for approval by the MBTA.

1.3 The Contractor shall submit for approval by the MBTA a detailed project-specific operational Safety and Health Plan. The Contractor may use a template of their own choosing, however, the plan must include the following elements at a minimum:

Identification of project-specific hazards and associated mitigation measures Roles and responsibilities of all personnel involved in safety oversight Procedures for incident reporting, emergency response, and communication Required training, certifications, and safety qualifications for all staff (in addition to those already required by the MBTA) Site-specific safety protocols, including PPE requirements Procedures for monitoring, auditing, and updating the plan throughout the project Safety Data Sheets (SDSs) for preservation treatments, painted steel, and any other materials or processes as directed by the MBTA

1.4 Scope of Work

1.4 Refer to Special Provisions Page 1 for the Scope of Work.

SPECIAL PROVISIONS

MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations

SCOPE OF WORK

All work under this Contract shall be done in conformance with the 2026 Standard Specifications for Highways and Bridges, the Supplemental Specifications (March 31, 2026), the 2026 Construction Standard Details , the 1990 Standard Drawings for Signs and Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Revisions 1, 2, and 3 and the November 2022 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions.

The work to be done under this Contract consists of scheduled and emergency bridge deck and joint repairs and associated work performed on roadway bridges, ramps and viaducts owned by the MBTA at various locations.

The Work will include but not be limited to:

1. Installation, repair, or replacement of bridge joint systems

2. Milling and Paving of Bridge of entire decks and approaches for full width bridge resurfacing.

For complete deck resurfacing, Item 415.4 Bridge Pavement Milling and the Superpave HMA Bridge Courses will be used. The pavement types and thickness will vary by location and will be determined by the Engineer.

3. The Contractor shall perform all pavement milling of existing Hot Mix Asphalt (HMA) surfaces in accordance with the Contract requirements. The Work shall include all necessary quality control (QC) activities associated with the milling operations, as well as the provision of all equipment, tools, labor, and incidental materials required to complete the Work. The Contractor shall also be responsible for the removal, handling, and proper disposal of all milled material in compliance with applicable regulations. For small patches, Item 129.6 Bridge Pavement Excavation and Item 451 HMA for Patching will be used.

4. Partial depth and/or full depth excavation of the existing reinforced cement concrete decks where deterioration has occurred as required by the Engineer.

5. Excavation of deteriorated concrete adjacent to joints.

6. Replacement of excavated deteriorated concrete associated with deck and joints repairs.

7. Miscellaneous repairs to various bridge appurtenances.

8. Preservation treatments to concrete decks and other concrete bridge elements, including the required surface preparation. This work includes:

Item 908.11 Concrete Penetrant Sealer

• This item is intended for use on entire bridge decks and many other concrete elements including but not limited to barriers, bridge seats, piers, columns, backwalls, abutments.

Item 964.21 Concrete Protective Coating – Elastomeric

• This item is intended for same areas as Item 908.11 with the exclusion of decks.

Item 964.6 Epoxy Healer-Sealer Treatment on Bridge Decks

The intent of this item is to treat and preserve entire bridge decks.

9. Related traffic management.

All materials and equipment shall be approved by the Engineer prior to work.

Where work is directed by the Engineer and is not in the list of bid items, the Contractor shall provide a quote to the MBTA Contractor Officer for review and written authorization prior to incurring any costs.

All work shall be performed within, and accessed by, existing roadway layouts. No rights to enter on, or occupy, private property have been acquired for this project.

When the included Drawings and Sketches do not adequately describe the work, the Standard Details of the MassDOT LRFD Bridge Manual - 2013 Edition shall be followed.

LOCATION OF WORK

Work under this contract may include any MBTA-owned roadway bridges over or associated with the Red Line, Orange Line, Green Line, Blue Line, Mattapan High Speed Line and Greenbush Line.

No work shall be performed under this contract until specifically authorized and directed by the Authority. Furthermore, this Contract does not assign to the Contractor complete maintenance of the roadway bridges owned by the Authority. The Authority reserves the right to perform such work as it deems best with its own forces, and/or to enter into special contracts for the maintenance of specific items.

Some of the bridges, due to their height (vertical clearance), will require special lifting equipment to place shielding and/or formwork for the assigned bridge repair work. Any equipment required to erect shielding and/or formwork shall be incidental to the relevant contract items.

SCHEDULE OF WORK

All proposed work hours shall conform to MassDOT Standard Specifications for Highways and Bridges Subsection 7.09 and be subject to the written approval of the Engineer prior to any work.

For specific locations, allowable work hours will be determined by the MBTA’s designated representative. On high volume and/or high-speed roadways, work may be restricted to non-peak hours or night work as directed by the Engineer to avoid peak traffic volumes and to maintain safety and productivity. Work that has the potential to disrupt railroad and transit operations may be restricted to night work or to scheduled track outage/diversion periods.

FORMWORK AND SITEWORK

The temporary formwork used for concrete placement, shall be removed, and disposed of by the contractor. Any formwork that is not removed within forty-five (45) days after the concrete placement and is reported by Bridge Inspection or other MBTA personnel will impose a damage of $500.00 for each form location (On one bridge there may be multiple locations). Payment for removal of concrete forms shall be included in the unit price under the applicable item.

The Contractor is required to broom and clean all work site areas after the removal of excavated debris, regardless of the pre-existing conditions. These include areas excavated under joints such as pier caps and revetment areas. This removal of debris is incidental to the contract with no additional compensation.

PREPARATION OF CONCRETE SURFACES FOR CONCRETE REPAIRS

All concrete surfaces to be patched shall be roughened, cleaned of all laitance, dirt, grease, oil, other contaminants, and all standing water. All reinforcing steel encountered in the excavation shall be thoroughly cleaned by abrasive blasting before being covered with new concrete.

In bonding new concrete to already set concrete, the surface of the concrete shall be thoroughly cleaned, roughened, and ponded with clean water to achieve Saturated Surface Dry (SSD) condition then it shall then be blown off with oil free compressed air.

CONCRETE FINISHING

Bridge decks patches that are to be left exposed without bituminous or cement concrete overlays or that are receiving a waterproofing mix without waterproofing membrane shall receive a textured steel raked finish. The deck shall be transversely tined with a metal rake while the concrete is still plastic perpendicular to the centerline of the bridge from. Rake tines shall be spaced less than two

(2) inches on center. No un-textured deck surface greater than 6 in. in width shall remain. A minimum clearance of 1 in. shall exist between the texturing and the end of deck or edge of metal bridge deck expansion joint. No overlapping or repeating of texturing in the same location shall be permitted.

No separate payment will be made for concrete finishing, but all costs in connection therewith shall be included in the applicable Concrete Items.

CONTRACTOR NOTIFICATION

Contractor notification and response will be classified into three categories as follows:

1. EMERGENCY REPAIR:

An Emergency Repair is defined as the work required to repair failed bridge elements, which is of an EMERGENCY NATURE and requires IMMEDIATE ATTENTION as determined by the Engineer. The Contractor will be required to commence an Emergency Repair within four (4) hours after notification by the Authority, unless otherwise directed. The nature of the Emergency work will require the Contractor to initiate work within 4 hours in an Emergency. In addition to required construction Items, payment for any Emergency Repair Work performed will be paid under Item

748.1 Emergency Response. Emergency Repairs may be initiated verbally due to the need for immediate action but will be followed up by a written work assignment.

2. PRIORITY REPAIR:

A Priority Repair is defined as work required to repair failed bridge elements, which is not of an Emergency nature; however, needs to be completed in a timely manner to prevent further deterioration or to meet the need of other constraints. The Contractor will be required to commence a Priority Repair within seven (7) calendar days after notification by the Authority, unless otherwise directed.

3. SCHEDULED REPAIR:

A Scheduled Repair is not considered to be of an Emergency nature and has no priority over other repairs. The Contractor will be required to commence scheduled work within thirty (30) calendar days after notification by the Authority, unless otherwise directed. The Contractor shall immediately notify the Engineer if unable to begin physical work within thirty (30) calendar days and provide an explanation for the delay.

CONTRACTOR NOTIFICATION (Continued)

The Contractor will be notified of all work assignments in writing, except for Emergency repairs which may first be assigned verbally with a follow up written assignment. The work assignment will identify the location of the work, the category of work (Emergency, Scheduled or Priority), and identify the major items required for the work. The date from which potential non-response damages will be assessed for each work order will be based on the date the work order is assigned in the work order management system to the date the Contractor begins Physical Work.

For repairs that are deemed a priority or urgent repair, the Contractor must submit a work schedule and estimate for the Engineer’s review and approval within seven (7) calendar days of issuance of the work assignment. The Contractor's schedule and estimate shall provide information relating to equipment, materials, anticipated work hours, labor availability, itemized estimated value of the repairs, a breakdown of major components of the work (i.e. staging installation, concrete work, etc.) and estimated start and completion dates.

“Physical Work” shall be defined as “physical implementation of the required repair at the bridge site”. In no case will Physical Work include any of the following: ordering materials, fabrication of materials, organizing labor forces, coordinating with subcontractors, installing means of access and/or traffic control to implement the required repairs, installing temporary works, or other operations needed to be performed in advance of the required repairs.

This Contract contains both Emergency response mobilization payment items for Emergency Repair work, and Non-Response damages to ensure prompt action by the Contractor.

The ability to assign Emergency Repair work, if required, shall take effect as soon as this Contract is executed.

The Contractor shall have the appropriate communication capabilities that will allow the Authority to notify the Contractor of an Emergency Repair on a twenty-four hour (24) per day basis.

The Contractor shall supply the Authority with a list of telephone numbers for personnel who can be contacted twenty-four (24) hours a day in case of an emergency.

NON-RESPONSE DAMAGES

It is the intent of this provision to ensure prompt response to work assignments based on priority.

These Non-Response Damages may be waived by MBTA when, in the opinion of the Engineer, it is in the best interest of the MBTA to do so.

If the Contractor has not met the complexity milestones as outlined in the work assignment and above, a notification will be sent to the Contractor regarding Non-Responses Damages that will be assessed. The Engineer shall assess damages in the amount of $1,000 per day (or portion thereof) for each day beyond the milestone due date that the milestone is not met.

Emergency Repairs:

If the Contractor has not started Physical Work on an assigned Emergency Repair within four (4) hours from the receipt of the notification, payment under Item 748.1 will only be made at the discretion of the Engineer. Furthermore, the Contractor will be assessed damages in the amount of $1,000 per hour for each hour Physical Work is delayed.

Priority Repairs (assuming 7 days) The Contractor shall commence priority work within 7 days after an assignment is issued by the Department, unless otherwise directed. If the Contractor has not started Physical Work on an assignment within 7 days, the Authority will notify the Contractor in writing of the intent to issue damages. Damages will begin five (5) days after written notification to the Contractor. The Engineer will assess damages in the amount of $1,000 per day for each day (or portion thereof) that the Work is delayed.

Scheduled Repairs (assuming 30 days) The Contractor shall commence scheduled work within 30 days after an assignment is issued by the Authority, unless otherwise directed. If the Contractor has not started Physical Work on an assignment within 30 days, the Authority will notify the Contractor in writing of the intent to issue damages. Damages will begin five (5) days after written notification to the Contractor. The Engineer will assess damages in the amount of $1,000 per day for each day (or portion thereof) that the Work is delayed.

“Physical Work” shall refer to physical implementation of the required repair at the bridge site.

For repairs with no additional complexities as identified in this chart time to start of Physical Work will be measured from the issuance of the work order. In no case will Physical Work include any of the following: ordering materials, fabrication of materials, organizing labor forces, coordinating with subcontractors, installing means of access and/or traffic control to implement the required repairs, installing temporary works, or other operations needed to be performed in advance of the required repairs.

If the Contractor has not submitted a work schedule or estimate for the Engineer’s review and approval on a Priority or Scheduled Repair within seven (7) calendar days after issuance of the Work Order, the Contractor will be subject to non-response damages of $500 per day. Damages will be deducted from the corresponding invoice for the month in which the delays took place.

In addition, the Engineer shall consider such delays in evaluating the Contractor’s performance.

GENERAL REQUIREMENTS FOR DEMOLITION AND

WORK INVOLVING PAINTED STEEL

Demolition and work involving painted steel shall conform to the requirements of Subsection 961 of the Standard Specifications.

Work Involving Painted Steel

Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.

The contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.

Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.

This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.

Environmental

All applicable portions of Subsections 961.65 “Worker Protection” and 961.66 “Environmental Protection and Monitoring” shall be followed when performing this work.

During chemical stripping a hand-washing facility may be used in lieu of a decontamination/changing facility.

Hazardous material shall be collected during the disassembly and disposed of as outlined in Subsection 961.68 “Handling of Hazardous Waste and Reporting Release Programs”.

The applicable submittals shall be according to Subsection 961.69 “Submittals”.

Cleaning/Removal

Cutting Or Burning Of Steel

All surfaces to be welded, heated, saw cut or burned shall be cleaned so as to remove all contaminants and/or hazardous materials, which could be discharged to the environment as a function of the subsequent operations.

Lead paint shall be removed in its entirety in an area prescribed by a 6 inch (15 cm) minimum offset from the required work. The paint removal operation may be dry abrasive blasting, wet abrasive blasting or chemical stripping.

Proper level of containment shall be used when performing this work in accordance with Subsection 961.67 “Containment”. Full containment is not required during chemical stripping operation however; the Contractor shall install proper shielding and/or tarpaulins under the chemical stripping operations in order to catch all debris generated during this procedure. A cleaned area must be inspected and approved before the demolition operations are started.

During cleaning operations the Contractor shall be required to furnish and erect temporary floodlights illuminating the steel surface at a minimum of 30-foot candles. This lighting shall be used in areas where there is insufficient lighting for proper cleaning operations and inspection.

The Contractor shall supply electrical power.

The Contractor shall provide support for interim and final inspection of the bridge during cleaning operations. This support shall include the necessary traffic controls and safe access to the work.

Mechanical Disassembly Of Steel

All surfaces to be mechanically disassembled by shear cutting or removing bolts or rivets shall not require deleading. When shear cutting or removing bolts or rivets, the Contractor shall not use any method that will cause dust and/or particles to be emitted and/or dispersed into the environment to an extent that would expose the workers above the Action Levels of 30μg/m3.

For purposes of limiting the lead (Pb) dust, the Contractor will be required to dampen the lead paint work areas.

The Contractor shall install appropriate shielding and/or tarpaulins beneath all lead-paint-coated surfaces subject to shear cutting or removal of bolts or rivets to capture and contain any loose lead paint chips, dust, or particles. All containment measures shall be maintained throughout the Work and disposed of in accordance with applicable regulations.

Where bird netting is present, the Contractor shall take all necessary precautions to avoid damage during the performance of the Work. Any bird netting removed or disturbed shall be properly reinstalled and restored to its original condition upon completion of the Work, to the satisfaction of the MBTA.

RECONSTRUCTING OR FURNISHING ANTI-BIRD SCREENING

During this contract duration, locations may be encountered that either (1) contain damaged screening that had been installed to prevent birds from nesting among the bridge elements, or

(2) there is a need to furnish and install screening as a solution to this type of problem. In these situations, which will be defined as part of the work only by the Engineer, the Contractor will be compensated for associated labor costs through Item 100.1 “Base Labor Rate” and will reimbursed for material costs and equipment rental costs as described in the NON-BID ITEMS Section. If bird netting has been installed and must be temporarily removed by the Contractor in order to conduct the scope of work for this contract, the Contractor shall reinstate the bird netting in the exact manner in which it was originally installed.

SUPPLEMENTAL REQUIREMENTS FOR NON-BID ITEMS

(Supplementing Subsection 3.04)

For work not covered by the various bid items in this Contract, it is the intent to pay for such related work on a time and materials basis, as directed by the Engineer. The payment for such work is outlined in the following sections: Payment for Materials, Payment for Rental Equipment, Payment for Engineering Services, Payment for Specialty Services/Additional Artisans.

The Contractor will be paid for additional artisans, equipment rental, materials, engineering services and specialty services required to perform the work plus (10%) percent, plus actual increased bond premium.

The Contractor shall be required to furnish certified paid receipts for additional artisans, equipment rental, materials, engineering services and specialty services that are required to perform the work prior to payment by the Department. Increased bond premium for additional artisans, equipment rental, materials, engineering services and specialty services will be paid after a certified paid receipt is submitted showing payment of the increased bond.

NON-BID ITEMS

For work not covered by the various bid items in this Contract, it is the intent to pay for such related work on a time and materials basis, as directed by the Engineer. The payment for such work is outlined in the following sections: Payment for Materials, Payment for Rental Equipment, Payment for Engineering Services, Payment for Specialty Services/Additional Artisans.

A. PAYMENT FOR MATERIALS

The Contractor will be paid the actual cost for materials that are required to maintain or repair a bridge but are not covered under the Contract bid Items plus a mark-up of ten (10) percent. Any arrangements for the purchase of materials will be considered incidental. Delivery charges will be incidental to the material charges. State and Federal taxes if billed will not be reimbursed by MBTA. No materials shall be ordered until approved by the Engineer and competitive prices may be required if the Engineer directs.

The MBTA may have surplus materials on hand that could be included into the work.

The transportation of materials and/or parts supplied by MBTA will be included for payment under Item 100.1.

Payments for the installation of materials and/or parts will be made under Item 100.1 All materials which are necessary to perform the work under the various contract bid items shall be incidental to those Items at no additional compensation.

B. PAYMENT FOR RENTAL EQUIPMENT

The Contractor will be paid the actual rental cost for the equipment, which may be required to perform certain repair work that has not been included in the contract bid items, plus ten (10) percent. No equipment shall be rented until approved by the Engineer. The rental equipment shall not be part of the tradesman basic toolbox as specified under Item 100.1 Base Labor Rate.

Contractor-owned equipment required under this contract, with the exception of equipment listed under the various artisans’ descriptions in Item 100.1 Base Labor Rate will be reimbursed in the format outlined under Subsection 9.03 “Payment for extra Work” Section C of the Standard Specifications. Rental Equipment will not carry any overtime premium rate after being in full operation for more than 8 hours in a day.

Unless the rented equipment cost includes the operator, the Contractor will receive compensation for the operator of the “Rental Equipment” used for “Related Work” as specified in Item 100.1 Base Labor Rate.

The Contractor must get the authorization of the Resident Engineer before any equipment is rented and competitive prices may be required if the Engineer directs.

All rental equipment and tools shall be in excellent working condition. The Contractor shall not be paid for the time that the equipment is broken down.

The actual cost for rental equipment including equipment that is required when working from water below (i.e., barge equipped with 60' or higher boom lift, boat, operator, and other safety equipment) shall be judged in accordance with the rate specified in the Rental Blue Book and it is the Contractor's responsibility to provide a copy of this Blue Book to the Authority. The rental compensation shall also include the cost of a boat captain/tender crew. The rental for equipment will be paid on an hourly basis and will not carry any overtime rate after eight hours of operation.

All rental equipment and tools which are necessary to prosecute the work under the various contract bid items shall be incidental to those Items at no additional compensation.

C. PAYMENT FOR ENGINEERING SERVICES

Each non-routine structural repair for which there is no Contract bid Item to cover the work, the Contractor shall submit a design by a Professional Engineer of the appropriate discipline registered in Massachusetts within one week of notification (seven (7) calendar days after receipt of formal Work Order).

This design shall address all structural defects itemized in the work assignment. It shall be submitted to the Engineer for review. The Contractor must get the proposed design approved by the Engineer prior to commencing any work.

The Contractor will be paid the actual cost for the Engineering Services for the structural design by a Professional Engineer of the appropriate discipline registered in Massachusetts, plus ten

(10) percent when any Engineering Services are required for work done on a time and materials basis for which there is no bid Item. The Engineer shall approve all engineering costs prior to any design work being undertaken.

NON-BID ITEMS (Continued)

All engineering services which are necessary to prosecute the work under the various Contract bid items shall be incidental to those Items at no additional compensation.

ENGINEERING SERVICES COST ESTIMATE

When engineering designs or other consulting services are deemed necessary by the Engineer, the design firm will submit a cost estimate of the proposed work. This estimate will include the classification, estimated hours needed, and actual hourly rate for each individual anticipated to be used in developing the finished product. The billable rates shall include overhead and profit.

Overhead shall be as approved by MBTA or in absence of approved audited rates a maximum 155% shall apply for overhead. The profit fee is 10%. The billable rate shall be calculated using 1.10*(Base Hourly Rate + Base Hourly*Overhead Rate %).

D. PAYMENT FOR SPECIALTY SERVICES/ ADDITIONAL ARTISANS

The Contractor will be paid for any artisans that are not categorized under Item 100.1 “Base Labor Rate” (Regardless of whether the additional artisans are hired by the Contractor as a specialty sub-contractor crew, or as an individual artisan) required to repair or maintain the bridges or any work that has not been included as incidental to any Contract Bid Item plus ten

(10) percent. However, no artisans shall be hired until approved by the Engineer and competitive prices may be required if the Engineer so directs. The Contractor will not bid this item. If the Engineer has knowledge of source of additional artisans, which are competitive with the Contractor's choice, then the Contractor may be required to investigate and use an alternative choice.

COST ESTIMATES

Where the scope of a repair task can be adequately determined and described, the Contractor, when directed by the Engineer, shall be required to submit a Cost Estimate for the repair task.

Each Cost Estimate, submitted in writing, shall include an itemized scope of work, a proposed work schedule (including the number of working days and daily hours by each category of labor), and a detailed not-to-exceed (NTE) cost breakdown. The cost breakdown shall, at a minimum, identify the number and classification of workers, equipment and machinery (including barges, where applicable), materials, specialty subcontractors, engineering or design services, traffic control measures and police details, and any other associated project costs. The Cost Estimate shall also clearly indicate whether roadway, bridge, and/or waterway closures will be required to perform the Work. Upon approval by the MBTA, the itemized Cost Estimate shall be issued as a task order under the service contract. Any additional locations or work not included in the original scope shall be addressed through a formal Contract Amendment issued by the MBTA.

The Engineer will approve each Cost Estimate submittal in writing. A submittal does not guarantee the Contractor will be assigned the work. Payment will be based on actual hours worked at the contractual rates for various items as previously described, up to the maximum task amount.

Completion of the task is the sole responsibility of the Contractor once the not-to-exceed amount has been reached. Should unforeseen problems develop during the task completion, the Contractor will submit to the Engineer a revised scope of work with a comparison to the original scope of work along with a breakdown of the additional costs for approval by the Engineer. Approval for any increases to the agreed upon not-to-exceed cost will be dependent upon the justification of the additional work.

COST ESTIMATES

If the Contractor performs work which is not provided for in this Contract, or which was not authorized in writing by the Engineer, said Contractor shall receive no compensation for such work.

The management of the project and generating Cost Estimates, including such items as the planning of repair details, hiring of subcontractors, meetings with affected parties, scheduling of required artisans, purchasing of the necessary materials and the arrangement of equipment rentals, etc., will be considered incidental to the work and as such no additional compensation will be provided.

RATES OF PAYMENT

Payment for Non-Bid Items and Item 100.1 Base Labor Rate will be made for time spent on the project doing actual work on the Authority's bridges and shall NOT include travel time to and from the Contractor's place of business, and it shall also not include time for investigative field trips to find out how much material, equipment, tools, etc., may be needed for the work.

All equipment, materials, engineering costs and artisans’ compensation which are necessary to prosecute the work under the various contract bid items shall be incidental to those bid Items, at no additional compensation.

Note: For work covered by bid items in this contract and those not covered, there may be situations where the Authority has pertinent materials or equipment stockpiled. The Authority reserves the right to utilize these materials or equipment as seen fit in the prosecution of the work. This was mentioned previously already.

The Contractor will be reimbursed for the total actual cost (plus a percentage markup as indicated) for materials, equipment rental, additional artisans and engineering services required for related work directed by the Engineer. Artisans will be compensated as specified in Item

100.1 “Base Labor Rate”. The Contractor will not bid the materials, equipment rental, additional artisan, and engineering services Items.

Payment for Non-Bid Items will be based on bills submitted, covering all charges for labor, materials, and equipment according to the respective terms of the contract. Bills covering the total charges incurred in any given month are to be submitted by the fifteenth of the following month for processing.

The Contractor shall furnish certified copies of any or all payrolls for the Contract, showing the name, address, and occupational classification of each employee on said works, the hours worked by, and the wages paid to such employee.

ITEM 100.1 BASE LABOR RATE HOUR

The Contractor shall provide competent artisans, possessing all pertinent licenses and/or certifications, as required by the Engineer, to maintain and repair various components of the bridges. As described more fully below, included in this Item will be a tool kit for each trade with incidental tools, special apparel and any required personal safety equipment, and a vehicle for each trade with no additional charge to the Department. The Contractor shall submit to the Engineer all pertinent licenses and/or certifications for each artisan prior to the commencement of any work.

Failure to provide the pertinent licenses and/or certifications could result in the artisan being compensated at the laborer rate regardless of how the Contractor so compensated him/her.

The payment under this Item will be for the time spent by the artisan and artisan’s toolkit only.

Payment will be based upon time spent on the project doing actual work assigned by the Engineer and shall NOT include travel time to and from the Contractor's place of business and it shall also not include time for investigative field trips.

Payment for equipment (other than the usual artisan toolbox) will be made under payment for equipment rental as stated elsewhere in these special provisions.

This Item shall only be used to compensate the Contractor for the time that their in-house workforce spends on work orders assigned by the Engineer.

Incidental to this item, vehicles are to be supplied for each artisan. If more than one artisan of a certain type (for example, carpenter) are working at a work site, the Contractor need only supply the minimum vehicles required to transport the artisans, their equipment, laborers, materials, and supplies. The artisan vehicle(s) shall be capable of transporting materials consistent with the trade.

It is the intent under this item for material deliveries to be reimbursable only for bulk items or materials of sufficient quantity as determined by the Engineer. The Contractor shall make his bid with the understanding that ownership and operating costs do not apply and are not reimbursable for the vehicles utilized under the artisan items.

Described below, and included in this item, will be a tool kit for each trade with all incidental tools, special apparel, and any required personal safety equipment and a vehicle for each trade with no additional charge to the Department.

All tools and equipment in artisans tool kit shall be in excellent working condition.

If a separate tool truck is utilized, such vehicle shall also be considered incidental to this item. Any

Additional vehicles the Engineer deems necessary will be paid for under the rental equipment item. If it is the Contractor’s policy for the artisan to use their personal vehicles for the above purposes, no additional vehicles are required.

ITEM 100.1 (Continued)

Artisans and toolboxes are described below:

Laborer

Small hand tools, handheld power tools, chipping hammer, eye shields, gloves, protective clothing, generators as necessary to run the equipment and equipment that is normally used in the trade.

Carpenter

Hammer, framing square, tape measure, pouch, levels, hand saws, power saws, all electric power tools, air tools and generators and compressors as necessary to run the equipment. Saw blades and drill bits are also included.

Ironworker / Welder

Spud wrench, dowels, alignment pins, tape measure, pouch, levels, eye shields, gloves, protective clothing, rivet buster, air hammer, jackhammer, reamers, chipping hammer, wire brushes AC/DC- 300 amp- 100% duty cycle (minimum size) welding machine, torches for cutting, burning, or preheating steel, including fuel tanks & fuel / oxygen, grinders, heating oven for all welding consumables and other equipment that is normally used in the trade.

Equipment Operator

Operator shall have all licenses and certifications required by the Commonwealth of Massachusetts for the equipment they will be operating. Operators shall be in possession of their licenses at all times and show it to the Engineer when requested. Typical equipment includes a backhoe, skid-steer loader, and front-end loader.

Equipment which does not require a special license or certification for its operation shall be considered incidental to the artisan using it.

METHOD OF MEASUREMENT

Item 100.1 will be measured for payment by the Hour.

The Engineer will calculate total Base Labor Rate hours spent on the project by artisans.

Overtime hours will be paid for work exceeding eight (8) consecutive hours per day or forty (40) hours per week and shall be compensated as specified in this Item.

ITEM 100.1 (Continued)

To calculate the total Base Labor Rate hours, the Engineer will modify hours spent by various artisans on the project using adjustment factor(s) described below:

COMPENSATION FACTORS

ARTISAN REGULAR OVERTIME

LABORER 1.00 1.30

CARPENTER 1.20 1.56

CEMENT MASON 1.16 1.51

IRON WORKER / WELDER 1.23 1.60

EQUPTMENT OPERATOR 1.18 1.53

If an artisan has an apprentice, then that apprentice’s compensation factor shall be determined from the State Wages Apprentice level.

The Compensation Factors above will be used to adjust the number of hours a specific artisan will be paid for, per one (1) hour of work.

Example:

If the time spent on this project by various artisans is:

Laborer 8 hrs Carpenter 4 hrs Front-end loader Operator 6 hrs then the total hours for “Base Labor Rate” will be calculated as follows:

“Artisan A(hrs)” x “Compensation Factor A” + “Artisan B(hrs)” x “Compensation Factor B” + “Artisan C(hrs)” x “Compensation Factor C”

8(hr) x 1.00 + 4(hr) x 1.2 + 6(hr) x 1.18 = 8.00(hr) + 4.8(hr) + 7.08(hr) =

19.88 (billable hours)

BASIS OF PAYMENT

Item 100.1, Base Labor Rate, will be paid for at the Contract unit price per Hour, which price shall include all equipment (usual artisan tool kit), tools required to perform the normal artisans work, all clothing, and safety equipment normally associated with the artisans work is also considered incidental to this item.

ITEM 100.1 (Continued)

Any transportation required for an artisan and their toolbox to travel to and from a job site will be incidental to this Item. Ownership and operating costs, fuel and maintenance are not reimbursable for the vehicles and tools utilized under the artisan items.

SPECIAL NOTES REGARDING PREVAILING WAGE REQUIREMENTS

Item 100.1, Base Labor Rate establishes a unit price for the Department’s compensation to the Contractor for furnishing competent artisans to maintain and repair various components of the bridges. Nothing herein should be construed as establishing, altering or otherwise affecting the prevailing wages rates applicable to the work performed or relieving the Contractor of its obligations to ensure that workers are paid in accordance with applicable labor and wage laws.

Note that the erection and dismantling of scaffolding, rigging and containment for bridge painting work is subject to the “Painter(Bridges/Tanks)” prevailing wage rate. This includes surface preparation, including removal of all types of paint on bridges, the application of paint and the clean-up of debris resulting from paint removal operation on bridges, pursuant to the determination by the Massachusetts Department of Labor Standards’ 12/23/2009 “Notice Concerning the Removal and Application of Paint on Bridges and Tanks.”

ITEM 100.013 USE OF HOT BOX TRAILER FOR HOT MIX HOUR

The work under this Item consists of transporting and storing hot mix asphalt pavement in a heated, insulated, hot box trailer. The item shall include hot box trailer, the driver and a truck to haul the hot box.

This Item is to be used, as required by the Engineer, when ambient conditions or quantity of material to be placed require a hot-box trailer to maintain the temperature of the hot mix asphalt that is appropriate for its intended use.

The hot box shall have a minimum capacity of four (4) tons.

Item 100.013 will be measured for payment by the Hour for the time that the hot box is in use.

Item 100.013 will be paid for at the Contract unit price per Hour, which price shall include all labor, material, equipment, haul truck vehicles, truck driver, fuel, and all incidental costs required to complete the work.

No payment will be made under this item if the heaters are not properly functioning as determined by the Engineer.

ITEM 106.08 STEEL ARMOR JOINT REMOVED AND DISCARDED FOOT

Work to be done under this item consists of removing and disposing of existing steel armor joint system including the seals, steel members, and all attachment systems (such as studs, and anchor bolts etc.) to the limits specified by the Engineer. This Item will also be used for the removal of the strip seal steel extrusion within the bridge barrier limits. The necessary removal of adjacent reinforced concrete, concrete or HMA wearing surface, and membrane waterproofing for the steel armor joint system removal shall be paid under the appropriate contract items. Armor steel joint systems include strip seal and compression seal type joints as well.

Please note that some locations may require the excavation of bridge joints or backwalls which contain tar paper or roofing felt as a protective cover for the existing joint. The tar paper or roofing felt are materials often suspected to contain asbestos. The Contractor should be aware of the possible presence of asbestos materials and is required to take measures to properly identify, contain, and dispose of the materials in accordance with U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), U.S. Environmental Protection Agency (EPA), Massachusetts Department of Labor and Industries Regulations (DLI), and Massachusetts Department of Environmental Protection (DEP) regulations. The work done in accordance with these regulations shall be incidental to the work performed under this item.

CONSTRUCTION METHODS

The Contractor shall saw cut the perimeter of the proposed blockouts for the concrete header excavation.

The limits of the steel armored joint removal shall be as determined by the Engineer. The removal limits can be removing the entire armor joint assembly or partial removal of the top portion of the steel armor joint assembly. The Contractor shall submit the steel armored joint system cutting/dismantling/removal procedure for the Engineer’s approval.

All removed materials shall be transported off-site each day and disposed of in an environmentally safe manner. The bottom of the new block-out shall be thoroughly cleaned to insure a good bond between the existing material and all new materials. Abrasive blasting or pressure washing be required as directed by the Engineer.

ITEMS 106.08 (Continued)

METHOD OF MEASUREMENT

Item 106.08 will be measured at the contract unit price by the foot of armor joint system removed and discarded.

Item 106.08 will be paid for at the Contract unit price per foot of the armor steel joint system removed, including the armoring angles on both sides of the joint opening and all of its attachments.

In cases where one side of the joint system was previously removed, the method of measurement will be the same. The price shall include all labor, materials, equipment, tools and incidentals necessary to complete the work including disposal of the excavated material.

Any concrete excavation associated and required as part of the joint removal, will be paid for under Item 127.1 Reinforced Concrete Excavation. All concrete deck removal work within 1’-9” of the joint centerline will be paid for under Item 127.1 Reinforced Concrete Excavation. Concrete removal beyond 1’-9” of the joint centerline located on the deck will be paid under Item 127.4 Reinforced Concrete Deck Excavation (Full Depth) or Item 127.41 Reinforced Concrete Deck Excavation (Partial Depth). All concrete excavation on the approach backwall will be paid for under Item 127.1 Reinforced Concrete Excavation.

ITEM 106.12 BRIDGE CURB REMOVED AND RESET FOOT

The work under this Item shall conform to the relevant provisions of Subsection 580 of the

Standard Specifications and the following:

Item 106.12 consists of removing and resetting existing granite curb and edging on bridge decks, where the existing curbs and edgings are out of their original alignments, the anchors are rusted out, concrete securing the curb anchors is not sound, or the curb will come out of their alignments due to other work to be done under this contract.

Reinforcing bar anchors shall meet M8.01.0. Mortar shall meet M4.02.15. Non-shrink cementitious or epoxy grout shall be pre-approved by the Research and Materials Division. The

Contractor shall first remove the concrete behind the curb and/or edging under Item 127.1 and the

Contractor shall carefully remove the curb and/or edging and stack it temporarily in a safe place.

The contractor shall replace all curb and edging rendered unsuitable by his operation at his expense.

The Contractor shall remove the existing #5 L-shaped anchors by core drilling 3 inches into the granite. Each core hole shall be centered with the corresponding anchor and be slightly oversized to permit grouting of new anchors. The new anchors shall be # 5 L-shaped reinforcing bars extending three inches (3”) into the granite and six inches (6”) into the concrete. The new anchors shall be grouted into the granite using the approved grout. After completing the concrete deck repairs, the

Contractor shall reset the curb and edging in accordance with Subsection 501.66.

Item 106.12 will be measured for payment by the Foot of bridge curbs or edgings removed and reset, complete in place and accepted by the Engineer.

Item 106.12 will be paid for at the Contract unit price per Foot, which price shall include all labor, materials, equipment, and all incidental costs required to complete the work.

ITEM 107.851 SEALING RANDOM CRACKS…