RFCSP 2026-022 Burleson Legacy Park - Phase 1

Closed State & local contract opportunity Posted

Solicitation number
RFCSP 2026-022 (PK2311)
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from burlesontx.bonfirehub.com. Updated .

About this opportunity

The City of Burleson is requesting competitive sealed proposals for the construction of Burleson Legacy Park Phase 1, a 57.53-acre site located at multiple addresses on SW Hulen Street in Burleson, Texas, with proposals due June 25, 2026 and a non-mandatory virtual pre-proposal meeting on June 10, 2026.

Phase 1 scope includes approximately 1,500 linear feet of roadway connecting Hulen Street to Alsbury Boulevard; three lighted softball fields; a drop-off loop designed to accommodate food trucks; a 188-space parking lot; a ten-foot-wide shared use path along the north side of the roadway; a six-foot-wide sidewalk looping around the ballpark; regrading and reshaping of an existing detention pond for the drainage system; and rain gardens. Alternative bid items available to proposers include educational signage, a scoreboard, and a four-post shade sail system over the bleachers.

The Engineer's Opinion of Probable Construction Cost for the base bid is approximately $9.3 million. The expected project duration is 365 calendar days. The virtual bid opening is scheduled for June 25, 2026 at 3:00 PM CST via Microsoft Teams. Detailed technical specifications, construction standards, and contractual terms are provided in the specification and contract documents (4-01 RFCSP 2026-022 Specifications Contract Documents.pdf, 118 MB). The project plans document (3-02 RFCSP 2026-022 Plans.pdf) serves as the design reference for cost estimation and execution. Contact the City of Burleson Purchasing Manager, Andrea Anderson, at 817.426.9847 or visit 141 W Renfro Street, Burleson, Texas 76028 for additional information on proposal requirements.

Opportunity text

The City of Burleson ("City") is requesting Competitive Sealed Proposals (RFCSP) for the construction of Burleson Legacy Park, located at 1303, 2140, 2430, and 2250 SW Hulen ST, Burleson, TX 76028. This 57.53-acre site is part of phase 1 of Burleson Legacy Park. Phase 1 of Burleson Legacy Park includes the construction of 1500 linear feet of roadway connecting Hulen Street to Alsbury Boulevard starting approximately 840 feet north of the Hulen-Alsbury roundabout and ending approximately 900 feet east of the Hulen-Alsbury roundabout. The project also includes construction of three lighted softball fields, a drop-off loop designed to accommodate food trucks, and a 188-space parking lot. Additional improvements include a ten-foot-wide shared use path along the north side of the roadway and a six-foot-wide sidewalk that loops around the ballpark. Regrading and reshaping of the existing detention pond will be required for the drainage system. The project also includes rain gardens. Additional alternative bid items include educational signage, scoreboard and a 4-post shade sail system over the bleachers. The Project has an expected duration of 365 calendar days. The approximate Engineer's Opinion of Probable Construction Cost (EOPCC) is $9.3M for the base bid.