Reconstruction of Anacostia Ave Bridge 78

Closed State & local contract opportunity Posted

Solicitation number
DCKA-2026-B-0027
State
District of Columbia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from contracts.ocp.dc.gov. Updated .

About this opportunity

The District of Columbia Department of Transportation (DDOT) Office of Contracting and Procurement is seeking qualified contractors for an open market procurement to reconstruct Anacostia Avenue Bridge 78 over the Anacostia River Outlet in Washington, DC. This capital construction project (DCKA-2026-B-0027) requires the contractor to provide all labor, materials, equipment, tools, and incidentals necessary to complete bridge reconstruction work in accordance with contract documents, including contract plans, standard specifications, and supplementary specifications. Key project components include pile installation, concrete substructure work, reinforcing steel installation, structural steel installation for conduit support angles, temporary access roads, utility coordination with DC Water and PEPCO, stormwater management, settlement monitoring requirements, and site restoration. The solicitation was advertised and issued on January 6, 2026, with the bid due date extended to April 3, 2026 at 2:00 PM EST. Contractors must acknowledge receipt of all four amendments prior to bid submission and download the Request for Proposal from the DTAP.DDOT.dc.gov portal. The primary contact is Paul Tucker (paul.tucker@dc.gov), with Carol Hessler (carol.hessler@dc.gov) serving as the alternate contact. No solicitation fee is required, and no specific evaluation criteria beyond standard procurement practices are detailed in the available documentation.

This is an open market procurement under NIGP Code 913-13-00 with no subcontracting requirement (0%), meaning there are no set-aside designations or restrictions limiting which types of organizations may respond. No incumbent vendors or current contractors are identified in the solicitation documents. The project requires coordination with existing infrastructure and utilities managed by DC Water and PEPCO, with contractors responsible for providing structural steel angles supporting conduit connections and complying with PEPCO requirements and inspection procedures. The estimated contract value exceeds $100,000, triggering requirements for publication in a newspaper of general circulation and posting on internet solicitation advertisement sites in accordance with the District of Columbia Municipal Regulations Title 27, Chapter 13. The specific award value or budget range is not disclosed in the available amendment documents, though the pricing structure utilizes a detailed pay schedule with multiple line items for various construction components. Offerors must be capable of managing complex bridge reconstruction operations, coordinating with multiple utility providers, and meeting the District's construction standards and specifications.

Opportunity text

Work under this contract consists of the reconstruction of the Anacostia Avenue Bridge over Anacostia River Outlet (Bridge 78) project in Washington DC (Project). The Contractor shall provide all labor, materials, equipment, tools and incidentals necessary for the construction of the Project in accordance with the Contract Documents (the Work), which includes providing all materials, equipment, labor, tools, and incidentals necessary to complete the work as shown on the contract plans, standard specifications and the supplementary specifications (also referred to as special provision). The specifications and special provisions describe the minimum requirements for the material, quality control, and construction that shall govern the Work to be performed.

Files

File Type Posted
DCKA-2026-B-0027_Amd3.pdf PDF
DCKA-2026-B-0027_Amd2.pdf PDF
DCKA-2026-B-0027 Amd4.pdf PDF
DCKA-2026-B-0027_Amd1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity