DCKA-2026-B-0027_Amd1.pdf
PDF 435 KB Posted
- Attached to
- Reconstruction of Anacostia Ave Bridge 78
- Solicitation number
- DCKA-2026-B-0027
- Issued by
- District of Columbia
About this file
This is a Solicitation Submission Form and Amendment 01 issued by the District Department of Transportation (DDOT), Office of Contracting and Procurement, for the reconstruction of Anacostia Avenue Bridge 78 over the Anacostia River Outlet in Washington, DC. The contract requires the contractor to provide all labor, materials, equipment, tools, and incidentals necessary to complete the bridge reconstruction project in accordance with contract documents, including contract plans, standard specifications, and supplementary specifications. The solicitation was advertised and issued on January 6, 2026, with an RFQ opening date of February 27, 2026 at 2:00 PM local time. Offerors must download the RFP from the DTAP.DDOT.dc.gov website by creating an account and navigating to the solicitation documents for DCKA-2026-B-0027. Primary contact is Paul Tucker (paul.tucker@dc.gov) and alternate contact is Carol Hessler (carol.hessler@dc.gov).
The solicitation is classified as an open market procurement under NIGP Code 913-13-00 with no subcontracting requirement. The estimated contract value exceeds $100,000, requiring publication in a newspaper of general circulation and posting on internet solicitation sites per District of Columbia Municipal Regulations Title 27, Chapter 13. No solicitation fee is required, and the work site location is Washington, DC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2026-B-0027_Amd3.pdf | ||
| DCKA-2026-B-0027 Amd4.pdf | ||
| DCKA-2026-B-0027_Amd2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE OF CONTRACTING AND PROCUREMENT
OFFICE OF PROCUREMENT ADMINISTRATION
SOLICITATION SUBMISSION FORM
Title 27 of the District of Columbia Municipal Regulations, Chapter 13, Section 1300.6, and 1300.7, requires that each solicitation with an estimated price over one hundred thousand dollars ($100,000) shall appear at least once in a newspaper of general circulation; and that solicitation notices shall be posted to an Internet site that provides for advertisement of solicitations.
Please make sure to completely fill‐in the following areas. Failure to do so will result in delays of processing.
All contract award information is required to be in Microsoft Word format.
AGENCY NAME: District Department of Transportation
POC Name: Paul Tucker and Carol Hessler Fax #: Email Only
POC E‐Mail Address: paul.tucker@dc.gov and carol.hessler@dc.gov
Item Description Solicitation Number DCKA‐2026‐B‐0027
Caption Reconstruction of Anacostia Ave Bridge 78
Sub-Contracting Requirement (%) 0% Work Site Location Washington, DC
Market Type/NIGP Code Open Market/913-13-00
Primary Contact Person Paul Tucker
Primary Contact Phone Email Only
Primary Contact E-mail paul.tucker@dc.gov
Primary Contact Fax (optional)
Alternate Contact Person Carol Hessler
Alternate Contact Phone Email Only
Alternate Contact E-mail Carol.Hessler@dc.gov
Alternate Contact Fax
Solicitation Advertising Date January 6, 2026
Solicitation Issuance Date January 6, 2026
Solicitation Pick-Up Location Offerors must download the RFP from https://DTAP.DDOT.dc.gov by creating an account (if necessary) and navigating to the “Projects” tab – Clicking “Solicitation-Open Bid” under the solicitations section – Click “i” next to “DCKA-2026-B-0027” – Click “Bid Documents”.
Solicitation Fee - Board Number Fee: N/A ‐ Board Number: N/A
RFQ Opening Date/Time
February 27, 2026 at 2:00pm Local Time IFB Closing Date/Time
Office of Contracting & Procurement
Government of the District of Columbia Amendment 01
Synopsis: This is a summary of the solicitation’s contents
Solicitation Submission Form – DCOCP-V1206
Work under this contract consists of the reconstruction of the Anacostia Avenue Bridge over Anacostia River Outlet (Bridge 78) project in Washington DC (Project).
The Contractor shall provide all labor, materials, equipment, tools and incidentals necessary for the construction of the Project in accordance with the Contract Documents (“the Work”), which includes providing all materials, equipment, labor, tools, and incidentals necessary to complete the work as shown on the contract plans, standard specifications and the supplementary specifications (also referred to as “special provision”). The specifications and special provisions describe the minimum requirements for the material, quality control, and construction that shall govern the Work to be performed.
File details come from the government source that posted it. Updated .