RE-POST** Floating Dock System w/ abutment hinge and floats

Closed State & local contract opportunity Posted

Solicitation number
PF210403AR(B)
State
Washington
Responses due

Opportunity facts

Updated .

About this opportunity

The Washington Department of Fish and Wildlife (WDFW) is seeking bids from vendors to fabricate, furnish, and deliver a new pre-engineered, prefabricated Floating Dock System. The floating dock system must include one (1) 6'x21' float and two (2) 6'x21' interior pile floats, and be transportable and completely assembled as floating dock units ready for installation. The procurement covers the jurisdictions of Spokane County, Spokane City, Spokane Valley City, Lake Stevens City, Stevenson City, and Pend Oreille County in Washington state. The required delivery date is no later than April 15, 2022, and the quotation must be submitted by Wednesday, December 8, 2021 by 5:00 PM (PST). The specifications outline the minimum criteria for the floating dock system, including requirements for the structural steel, weld filler metal, fiberglass grating, hinge components, fasteners, flotation, and various attachments and features.

This procurement does not mention any set-asides or restrictions on the types of organizations that can respond. There is also no information provided on any incumbent vendors or current contractors, or any existing infrastructure or technology that requires integration. The RFQ includes pricing information, with vendors required to provide a unit price and total price for the floating dock system. The procurement allows for future purchase orders on an as-needed basis within one year of the initial award. No state sales tax should be included in the bid price, as it will be added to the billing invoice. The funding source for this procurement is not specified.

Opportunity text

WDFW is seeking bids from vendors who can fabricate, furnish, and deliver a new pre-engineered, prefabricated Floating Dock System w/ abutment hinge and one (1) 6'x21' float and two (2) 6'x21' interior pile floats as shown on the Drawings and specified herein. The floating dock system shall be transportable, completely fabricated and assembled floating dock units ready for installation. The specifications herein shall be the minimum criteria for a floating dock system.

Files

File Type Posted
PF210403AR(B) Board Float System.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity