Quail Drive Watermain Loop
Closed State & local contract opportunity Posted
- Solicitation number
- 2025 - Quail Drive Water Loop
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 92110000 Military services and national defense
- 83000000 Public Utilities and Public Sector Related Services
- 73130000 Food and beverage industries
- 78140000 Transport services
- 90120000 Travel facilitation
- 72121602 Offshore wind farm environmental survey
- 80150000 Trade policy and services
- 82110000 Writing and translations
- 72154063 Stopple or line stopping service
- 72140000 Heavy construction services
Show all 31
- 93000000 Politics and Civic Affairs Services
- 81130000 Statistics
- 93100000 Political systems and institutions
- 93110000 Socio political conditions
- 93120000 International relations
- 78120000 Material packing and handling
- 81120000 Economics
- 90140000 Commercial sports
- 93170000 Trade policy and regulation
- 72121600 Offshore wind farm service
- 72121601 Offshore wind farm development and project management
- 72121605 Offshore wind farm operation, maintenance and service
- 72121606 Offshore wind farm decommissioning
- 94000000 Organizations and Clubs
- 90000000 Travel and Food and Lodging and Entertainment Services
- 71100000 Mining services
- 73140000 Fibers and textiles and fabric industries
- 93150000 Public administration and finance services
- 72121603 Offshore wind farm geotechnical survey
- 72121604 Offshore wind farm installation and commissioning
- 72154062 Hot tapping service
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Fraser in Grand County, Colorado, is seeking a contractor for the Quail Drive Watermain Loop project, a municipal infrastructure improvement initiative. The procurement involves installing approximately 367 linear feet of water main infrastructure, specifically 175 linear feet of 6" C900 PVC and 192 linear feet of 8" C900 PVC, along with comprehensive water system upgrades. Key project deliverables include valve replacements, installation of four 8" MJ gate valves, three 6" and nine 8" ductile iron waterline fittings, and associated system connections. Contractor qualifications include demonstrating three project references of similar work completed within the last five years, compliance with Colorado labor requirements mandating 80% local workforce, and ability to manage mobilization, sediment control, traffic management, and site restoration. The non-mandatory virtual pre-bid meeting is scheduled for March 14th, 2025, at 1:00 pm, with sealed proposals due on April 3rd, 2025, by 2:00 pm through Bidnet Direct. The project requires substantial completion within 60 calendar days from the Notice to Proceed, with excavation restoration required prior to October 15th, and contractors must provide a 5% bid security.
While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the project does emphasize local labor participation with the requirement that 80% of workers be Colorado residents. No incumbent vendors are identified in the documentation. The project will be funded through municipal infrastructure budgeting, with the Town of Fraser serving as the primary contracting entity. Technical specifications require strict adherence to NSF/ANSI standards, with comprehensive testing protocols for water main installation, including pressure and leakage testing, tracer wire installation, and bacteriological testing. Contractors must obtain a CDPHE discharge permit for dewatering efforts and are expected to navigate complex utility easements and existing underground infrastructure. While a specific budget range is not provided, the detailed technical specifications and infrastructure scope suggest a significant municipal investment in water system improvements. The project drawings and specifications indicate a comprehensive approach to utility infrastructure, with careful consideration of local geological conditions and existing utility networks.
Opportunity text
The work generally consists of the following major items: · General: Includes mobilization/demobilization, bond, 3rd party materials testing subcontractor, sediment control, traffic control, and construction dewatering. · Installation of Water Main: Includes specifically sequenced new water mains and valve replacements. New water mains include approximately 175 LF OF 6" C900 PVC and 192 LF in a separate location of new 8" C-900 PVC water main, replacement of existing 8" tee and valves with new 8" cross and valves, and cut-in replacement of an existing 8" gate valve. · Water Main Appurtenances: Includes four (4) 8" MJ gate valves, three (3) 6" ductile iron waterline fittings, nine (9) 8" ductile iron waterline fittings, plus associated fittings, hot taps, and valves at connections to existing distribution system. · Restoration: Includes asphalt, concrete, and reseeding restoration of disturbed areas.
Files
| File | Type | Posted |
|---|---|---|
| Q&A Document 1.pdf | ||
| QUAIL DRIVE WATER LOOP_Specifications_3-6-25.pdf | ||
| ADDEND. NO 1_3-20-25_FINAL.pdf | ||
| QUAIL DRIVE WATER LOOP Drawings_3-6-25.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity