These are detailed engineering design drawings for the Quail Drive Water Loop project for the Town of Fraser, Colorado, prepared by Merrick and Company in March 2025. The project involves installing approximately 367 linear feet of water main (175 LF of 6" C900 PVC and 192 LF of 8" C900 PVC), replacing existing water infrastructure including gate valves, tees, and cross fittings, and performing associated utility work. The drawings include comprehensive plans for water main routing, valve replacements, project sequencing, and civil details, with specific work concentrated in the Quail Drive area near Wapiti Drive and Fox Lane. The project scope includes mobilization, sediment control, traffic management, water main installation, valve replacements, and site restoration.
The project documents indicate a comprehensive approach to municipal water infrastructure improvement, with detailed specifications for materials (including polyvinyl chloride pipes, mechanical joint fittings, and polywrap), installation techniques, and restoration requirements. The Town of Fraser will be responsible for water system oversight, with specific technical standards including NSF/ANSI compliance, pressure and leakage testing, tracer wire installation, and bacteriological testing. The design incorporates multiple utility easements, considers existing underground utilities, and requires careful coordination with local utility providers. The project is funded through municipal infrastructure improvement channels, with construction expected to occur within one year of the design approval date in March 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A Document 1.pdf | ||
| ADDEND. NO 1_3-20-25_FINAL.pdf | ||
| QUAIL DRIVE WATER LOOP_Specifications_3-6-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAPITI DRIVE
QU
AI
L D
RI
VE
FO
X
LA
NE
S W
AP
IT
I D
RI
VE
LOCATION MAP
NO SCALE
TOWN OF FRASER, COLORADO
MARCH 2025
QUAIL DRIVE WATER LOOP
VICINITY MAP
1" = 60'
LEGEND*
LIST OF DRAWINGS
G-001 COVER SHEET
G-002 GENERAL NOTES
C-100 CONTROLS AND SEQUENCING PLAN
C-101 PROPOSED WATER LOOP PLAN (NORTH)
C-102 PROPOSED WATER LOOP PLAN (EAST)
D-100 CIVIL DETAILS
D-101 CIVIL DETAILS
EXISTING FIBER OPTIC LINE
EXISTING MAJOR CONTOUR
EDGE OF ASPHALT
EXISTING GAS LINE
PROPERTY LINE
EXISTING MINOR CONTOUR
ISSUED FOR BID
EASEMENT LINE
FENCE
FO FO
EXISTING OVERHEAD ELECTRIC
EXISTING RAW WATER LINE
EXISTING CABLE TELEVISION LINE
EXISTING OVERHEAD CABLE TELEVISION LINE
EXISTING SANITARY SEWER LINE
These designs, plans, and contract documents are reviewed for concept and general conformance to the Town's minimum standards only, and the responsibility for design adequacy shall remain with the Engineer of Record.
This review does not imply responsibility by either the Town of Fraser or the Town's Engineer for completeness, accuracy or correctness of calculations. The review does not imply that quantities of items indicated on the Plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the Town of Fraser or any of the reviewing parties for additional items and additional quantities of items shown that may be required during the construction phase.
By Town Engineer
By
By
Town of Fraser
East Grand Fire Protection District #4
Note: East Grand Fire Protection District #4 signature line shall only be required on projects extending or modifying Fraser's Water Distribution System.
Date
Date
Date
Approved for construction within one (1) year of the earliest of these dates:
STANDARD ABBREVIATIONS
ELECTRICE, ELEC
EXISTINGEXIST
CENTERLINECL
CONCRETECONC
GATE VALVEGV
POLYVINYL CHLORIDE (PIPE)PVC
MANHOLEMH
POWER POLEPP
OVERHEAD ELECTRICOE
THRUST BLOCK
TYPICAL
TB
TYP
W WATER
SANITARYSAN
W/ WITH
MINIMUMMIN
TOP OF PIPETOP
ELBOW FITTINGELL
DEMOLISHDEMO
LINEAR FEETLF
EXISTING GRADE
VALVE BOX AND COVERBOX
RIGHT OF WAYROWEG
DRAWINGDWG
NOT TO SCALEN.T.S
APPROXIMATEAPPROX
EASTINGE
NORTHINGN
SQUARE FEETSQ. FT.
STATIONSTA
ELEVATIONEL
VERTICALVERT
GASG
EXISTING WATER LINE
EXISTING UNDERGROUND TELEPHONE
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -C ov er
.dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
GHS
COVER SHEET G-001
SITE NORTH
SITE EAST
PROPOSED WATER LINE
PROPOSED EASEMENT LINE
W
E
EXISTING BUILDING
EDGE OF CONCRETE
SIGN
TELEPHONE PEDESTAL
ELECTRIC METER
GAS METER
SANITARY SEWER MANHOLE
WATER VALVE
POWER POLE
ELECTRIC PEDESTAL
COMMUNICATIONS CABINET
RAW WATER VALVE
C
TREE
CURB STOP
EXISTING WATER SERVICE LINE
EXISTING SANITARY SEWER SERVICE (APPROXIMATE)
GENERAL NOTES
1. THE CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL PERMITS
NECESSARY AS APPLICABLE TO COMPLETE THE WORK AND SHALL COMPLY WITH
ALL LOCAL, STATE AND FEDERAL REGULATIONS. THESE MAY INCLUDE BUT ARE
NOT LIMITED TO A RIGHT-OF-WAY ACCESS PERMIT FROM THE TOWN OF FRASER,
DEWATERING DISCHARGE PERMIT, AND A CDPHE CONSTRUCTION STORMWATER
MANAGEMENT PLAN PERMIT.
2. CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE
CODES, LICENSES, STANDARDS, SPECIFICATIONS, BONDS, ETC. WHICH ARE
NECESSARY TO PERFORM THE PROPOSED WORK.
3. HOURS OF OPERATION: CONSTRUCTION OPERATIONS SHALL BE ALLOWED
BETWEEN 7:00 AM AND 6:00 PM ON WEEKDAYS AND WITH 48 HOURS ADVANCED
NOTICE AND PERMISSION OF OWNER AND/OR ENGINEER ON WEEKENDS, NIGHTS,
AFTERHOURS, AND HOLIDAYS.
4. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE
LATEST STANDARDS AND SPECIFICATIONS FOR THE APPROPRIATE GOVERNING
AGENCY. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT THE JOB SITE AT
ALL TIMES THE APPROPRIATE GOVERNING AGENCY'S PUBLIC WORKS MANUAL, ALL
APPROVED EASEMENT AGREEMENTS, AND ONE (1) SIGNED COPY OF THE PLANS
AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR
SHALL OBTAIN WRITTEN APPROVAL FROM THE APPROPRIATE GOVERNING AGENCY
FOR ANY VARIANCE TO THE ABOVE DOCUMENTS.
5. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR
CONDITIONS AT AND ADJACENT TO THE JOB SITE INCLUDING THE SAFETY OF ALL
PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS AND MUST COMPLY WITH OSHA REGULATIONS.
6. THE CONTRACTOR SHALL REPAIR ANY EXCAVATIONS OR PAVEMENT
FAILURES CAUSED BY THEIR CONSTRUCTION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF ALL MATERIALS WITHIN THE DEDICATED RIGHT-OF-WAY AND ALL
MATERIALS AND WORKMANSHIP SHALL MEET THE ROADWAY DESIGN AND
CONSTRUCTION STANDARDS OF THE APPROPRIATE GOVERNING AGENCY.
8. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION AT LEAST 24
HOURS PRIOR TO THE START OF CONSTRUCTION. THE APPROPRIATE FIRE
DEPARTMENT SHALL BE NOTIFIED AT LEAST 48 HOURS IN ADVANCE OF ANY
STREET CLOSURES AND IN THE EVENT THAT ANY FIRE HYDRANTS ARE TO BE
TEMPORARILY OR PERMANENTLY REMOVED FROM SERVICE. THE CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR PROVIDING AT LEAST 48 HOURS ADVANCED
NOTICE OF ANY NEED TO SHUT DOWN ANY PORTION OF THE EXISTING WATER
SYSTEM AND FOR OBSERVATIONS AND/OR INSPECTIONS REQUIRED.
9. THE CONTRACTOR IS REQUIRED TO PROVIDE AS-CONSTRUCTED
HORIZONTAL AND VERTICAL CONSTRUCTION INFORMATION, INCLUDING THE
LOCATIONS OF ALL SANITARY LINES AND SERVICES, WATER LINES AND SERVICES,
AND OTHER UTILITY LINES AND SERVICES TO THE ENGINEER FOR PREPARATION
OF AS-BUILT DOCUMENTS.
10. LIMITS OF CONSTRUCTION AND RIGHTS-OF-WAY SHALL BE DELINEATED
WITH TEMPORARY STAKING BY THE CONTRACTOR. SAFETY FENCING SHALL BE
PER APPROPRIATE GOVERNING AGENCY.
11. THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTY TO THE
PROJECT WORK SITE.
12. CONTRACTOR SHALL MAKE EVERY EFFORT TO LIMIT DISTURBANCE AREAS
AND MAINTAIN STOCKPILES, CONSTRUCTION ACTIVITY, AND
EQUIPMENT/MATERIALS STAGING TO WITHIN THE LIMITS OF CONSTRUCTION AND
OUTSIDE OF PRIVATE PROPERTY AREAS.
13. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE SITE AND MAKE ALL
INSPECTIONS NECESSARY IN ORDER TO DETERMINE THE FULL EXTENT OF THE
WORK REQUIRED TO MAKE THE PROPOSED WORK CONFORM TO THE DRAWINGS
AND SPECIFICATIONS. THE CONTRACTOR SHALL SATISFY HIMSELF AS TO THE
NATURE AND LOCATION OF THE WORK, CONDITIONS, AND CONFIRMATION AND
CONDITION OF EXISTING GROUND SURFACE AND THE CHARACTER OF THE
EQUIPMENT AND FACILITIES NEEDED PRIOR TO AND DURING EXECUTION OF THE
WORK. THE CONTRACTOR SHALL SATISFY HIMSELF AS TO THE CHARACTER,
QUANTITY AND QUALITY OF SURFACE AND SUBSURFACE MATERIALS OR
OBSTACLES TO BE ENCOUNTERED. ANY INACCURACIES OR DISCREPANCIES
BETWEEN THE DRAWINGS AND SPECIFICATIONS MUST BE BOUGHT TO THE
OWNER'S ATTENTION IN ORDER TO CLARIFY THE EXACT NATURE OF THE WORK TO
BE PERFORMED PRIOR TO THE COMMENCEMENT OF ANY WORK.
14. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO THE
EXISTING ROADS AND UTILITIES WHICH OCCURS AS A RESULT OF THE PROJECT
CONSTRUCTION WITHIN OR CONTIGUOUS TO THE EXISTING RIGHT-OF-WAY.
15. THE APPROVAL OF THIS PLAN SHALL IN NO WAY GRANT PERMISSION FOR
THE CONTRACTOR TO TRESPASS ON OFF-SITE PROPERTIES.
16. THE APPROVAL OF THESE PLANS SHALL IN NO WAY RELIEVE THE
CONTRACTOR OF COMPLYING WITH OTHER APPLICABLE LOCAL, STATE, AND
FEDERAL LAWS AND REGULATIONS
17. THESE PLANS MAKE NO REPRESENTATION AS TO THE SUBSURFACE
CONDITIONS AND THE PRESENCE OF SUBSURFACE WATER OR THE NEED FOR
SUBSURFACE DRAINAGE FACILITIES.
18. THE CONTRACTOR SHALL PROVIDE MATERIALS TESTING SERVICES TO
CONFORM WITH REGULATORY REQUIREMENTS AND TOWN CODE TO INCLUDE, BUT
NOT LIMITED TO TESTING OF CONCRETE, ASPHALT, SOIL SAMPLING/PROCTORS,
BACKFILL COMPACTION, SUBGRADE BEARING CAPACITY, AND PROOF-ROLLING.
CONTRACTOR SHALL BE RESPONSIBLE FOR ARRANGING ALL NECESSARY
INSPECTIONS AND COORDINATION WITH THE SOILS ENGINEER TO PERFORM
TESTING AT NO COST TO THE OWNER. CONTRACTOR SHALL PROVIDE MATERIALS
TESTING REPORTS FOR REVIEW AND RECORD TO THE OWNER AND ENGINEER.
19. EMERGENCY VEHICLE ACCESS SHALL BE MAINTAINED DURING ALL PHASES
OF CONSTRUCTION IN CONCURRENCE WITH THE LOCAL EMERGENCY AGENCIES.
20. ALL FINISHED GRADING, SEEDING, SODDING OR PAVING SHALL BE DONE IN
SUCH A MANNER TO PRECLUDE THE PONDING OF WATER.
21. THE ENGINEER SHALL NOT HAVE CONTROL OVER OR CHARGE OF AND
SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS,
TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND
PROGRAMS IN CONNECTION WITH THE WORK SHOWN ON THESE PLANS. THE
ENGINEER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S SCHEDULES OR
FAILURE TO CARRY OUT THE WORK. THE ENGINEER IS NOT RESPONSIBLE FOR
ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS, OR THEIR
AGENTS OR EMPLOYEES, OR OF ANY OTHER PERSONS PERFORMING PORTIONS OF
THE WORK.
22. AFTER ACCEPTANCE BY THE OWNER, PUBLIC IMPROVEMENTS DEPICTED IN
THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND
WORKMANSHIP DEFECTS FOR A PERIOD OF TWO YEARS FROM THE DATE OF
ACCEPTANCE.
23. ANY NEW PAVEMENT OPENED TO TRAFFIC SHALL RECEIVE A TACK COAT
PRIOR TO PLACEMENT OF ANY OVERLYING ASPHALT COURSE.
24. CONTRACTOR SHALL COORDINATE REMOVAL OR RELOCATION OF ALL
EXISTING UNDERGROUND AND OVERHEAD ELECTRICAL, GAS, TELEPHONE AND
CABLE TV LINES WITH THE APPLICABLE JURISDICTIONAL AUTHORITY.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTMENTS AND/OR
RECONSTRUCTION OF ALL UTILITY COVER (MANHOLE FRAMES AND COVERS,
VALVE BOX COVERS, ETC.) TO MATCH THE FINISHED GRADES OF THE AREAS
EFFECTED BY THE CONSTRUCTION.
26. DURING CONSTRUCTION, NO TEMPORARY CONNECTIONS TO FIRE
HYDRANTS MAY BE MADE WITHOUT THE EXPRESS AUTHORIZATION OF THE UTILITY
OWNER.
27. UNLESS OTHERWISE NOTED, ALL REMOVAL ITEMS WILL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF PROPERLY.
28. SUBMITTALS SHALL BE PROVIDED FOR REVIEW PRIOR TO USE FOR ALL
MATERIALS TO BE INCORPORATED INTO THE PROJECT. THE CONTRACTOR SHALL
REVIEW ALL SUBMITTAL PRIOR TO SUBMITTING TO THE TOWN AND ENGINEER. AT
NO TIME SHALL MATERIALS BE SUBSTITUTED FROM THOSE INDICATED IN THE
CONTRACT DOCUMENTS UNLESS WRITTEN APPROVAL IS OBTAINED FROM THE
TOWN OR ENGINEER PRIOR TO USE.
EROSION CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING A
STORMWATER MANAGEMENT PLAN (SWMP), IF REQUIRED BY THE WATER QUALITY
CONTROL DIVISION OF THE CDPHE. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL COSTS RELATED TO THE PLAN AND PERMIT.
2. THE EROSION CONTROL MEASURES SHALL BE INSPECTED DURING AND
AFTER EACH RUNOFF EVENT, WITH REPAIRS BEING MADE AND EXCESS SEDIMENT
REMOVED AS NEEDED. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING
SEDIMENT FROM TRAVELING OFF-SITE OR TO NEARBY WATER SOURCES.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAKE SURE ALL
APPROPRIATE PERMITS FOR STORM WATER DISCHARGES ASSOCIATED WITH
CONSTRUCTION ACTIVITY HAVE BEEN OBTAINED PRIOR TO START OF
CONSTRUCTION.
4. ALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR SHALL BE
RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL TEMPORARY
WATER DIVERSION/CONTROL DEVICES AND EROSION CONTROL DEVICES
NECESSARY TO PROTECT ADJACENT PROPERTIES, WATERWAYS AND PUBLIC
RIGHT-OF-WAY UNTIL PROJECT COMPLETION AND PERMANENT STABILIZATION OF
ALL DISTURBED AREAS.
5. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD AND
CONSTRUCTION DEBRIS THAT MAY ACCUMULATE IN THE FLOWLINES AND
RIGHTS-OF-WAY BEYOND THE CONSTRUCTION LIMITS AS A RESULT OF THIS
PROJECT. SUCH REMOVAL SHALL BE CONDUCTED IN A TIMELY MANNER.
6. THE CONTRACTOR SHALL PREVENT SEDIMENT, DEBRIS AND ALL OTHER
POLLUTANTS FROM ENTERING THE STORM SEWER SYSTEM DURING ALL
CONSTRUCTION OPERATIONS THAT ARE A PART OF THIS PROJECT. THE
CONTRACTOR SHALL BE HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE
IMPACTS TO ADJACENT WATERWAYS, WETLANDS, ETC., RESULTING FROM WORK
DONE AS A PART OF THIS PROJECT.
7. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND
RESTORED TO A FULLY STABILIZED CONDITION, OR TO THE GRADES AND
CONDITION AS REQUIRED BY THESE PLANS. EXISTING FENCES, TREES, STREETS,
SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND
IMPROVEMENTS DESTROYED, DAMAGED, OR REMOVED DUE TO CONSTRUCTION
OF THIS PROJECT SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE
CONTRACTOR'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS.
8. THE CONTRACTOR SHALL INSURE THAT ALL CUT AND FILL MATERIAL
IMPORTED TO OR EXPORTED FROM THIS SITE SHALL BE PROPERLY COVERED TO
PREVENT LOSS OF THE MATERIAL DURING TRANSPORT ON PUBLIC
RIGHTS-OF-WAY.
9. THE TOWN OF FRASER WILL MAKE WATER AVAILABLE FOR CONTRACTORS
USE FOR THIS PROJECT AT FIRE HYDRANTS LOCATED IN THE TOWN. THE
CONTRACTOR WILL NOT BE CHARGED FOR THE USE OF THIS WATER AS LONG AS IT
IS PROPERLY USED AND NOT WASTED. THE CONTRACTOR WILL BE RESPONSIBLE
FOR TRANSPORTING THE WATER FROM THE FIRE HYDRANTS. APPROVED
BACKFLOW PREVENTION DEVICES SHALL BE USED AT POINTS OF CONNECTION TO
THE TOWN'S SYSTEM.
10. THE CLEANING OF CEMENT TRUCK DELIVERY CHUTES SHALL OCCUR IN A
PREDETERMINED CONTAINMENT AREA. THE DISCHARGE OF WATER CONTAINING
CEMENT TO THE STORM SEWER SYSTEM IS PROHIBITED.
11. WHEN TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES ARE TO
BE REMOVED, ANY SILT AND SEDIMENT DEPOSITS SHALL BE REMOVED.
12. ANY CONSTRUCTION DEBRIS OR MUD TRACKING IN THE PUBLIC
RIGHT-OF-WAY RESULTING FROM THIS PROJECT SHALL BE REMOVED
IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR SHALL IMMEDIATELY FIX
ANY EXCAVATIONS OR PAVEMENT FAILURES CAUSED BY THE WORK AND SHALL
PROPERLY BARRICADE THE SITE UNTIL CLEAN UP OR REPAIR IS COMPLETE.
13. PROTECT ALL EXISTING TREES AND VEGETATION. PLACE CONSTRUCTION
FENCING AROUND TREES AND PLANTS NEAR THE WORK ZONE.
TRAFFIC CONTROL
1. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL
PLAN, IN ACCORDANCE WITH MUTCD, TO THE TOWN OF FRASER PUBLIC WORKS
DEPARTMENT, FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN,
OR AFFECTING, THE RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED
BY THE CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL KEEP TRAFFIC AREAS FREE OF EXCAVATED MATERIAL,
CONSTRUCTION EQUIPMENT, AND OTHER MATERIALS AND EQUIPMENT.
3. KEEP FIRE HYDRANTS AND WATER CONTROL VALVES FREE FROM
OBSTRUCTION AND AVAILABLE FOR USE AT ALL TIMES.
4. CONTRACTOR SHALL MAKE EVERY EFFORT TO MAINTAIN ACCESS TO
PRIVATE PROPERTY AND BUSINESSES AT ALL TIMES. WHEN ACCESS TO PRIVATE
DRIVEWAYS MUST BE TEMPORARILY RESTRICTED DUE TO CONSTRUCTION
OPERATIONS, NOTIFY THE PROPERTY OWNER OR RESPONSIBLE PARTY OF SUCH
CLOSURE NOT LESS THAN 24 HOURS IN ADVANCE OF CLOSURE.
5. CONTRACTOR TO PROVIDE ALTERNATIVE MEANS OF INGRESS AND EGRESS
TO PRIVATE PROPERTY AND BUSINESS LOCATIONS AS NECESSARY.
6. NOTIFY THE FIRE DEPARTMENT, POLICE/SHERIFF DEPARTMENT, HIGHWAY
PATROL, AMBULANCE SERVICE, LOCAL SCHOOL DISTRICT, AND TRANSIT 14 DAYS
BEFORE CLOSING ROADWAY OR PORTION THEREOF. NOTIFY SAID DEPARTMENTS
OR AGENCIES WHEN STREETS ARE AGAIN PASSABLE FOR VEHICLES.
7. THE CONTRACTOR SHALL PROVIDE ALL SIGNS, BARRICADES, FLAGMEN,
LIGHTS OR OTHER DEVICES NECESSARY FOR SAFE TRAFFIC CONTROL IN
ACCORDANCE WITH THE CURRENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES AND AS MODIFIED BY THE COLORADO SUPPLEMENT TO THE
MUTCD. A CONTROL PLAN SHALL BE SUBMITTED TO AND APPROVED BY THE
APPROPRIATE GOVERNING AGENCY PRIOR TO THE ISSUANCE OF ANY
RIGHT-OF-WAY ACCESS CONSTRUCTION PERMIT.
SURVEY AND UTILITY NOTES:
1. TOPOGRAPHIC AND UTILITY SURVEY INFORMATION HAS BEEN PROVIDED
FROM FIELD SURVEYS PERFORMED BY COBB, FENDLEY & ASSOCIATES IN SUMMER
OF 2024. COORDINATE DATUM: PROJECT COORDINATES ARE MODIFIED COLORADO
STATE PLANE NORTH ZONE NAD 83 (2011). THE COMBINED SCALE FACTOR USED TO
MODIFY THE COORDINATES FROM PROJECT COORDINATES TO STATE PLANE
COORDINATES IS 0.999563462.
2. COBB, FENDLEY & ASSOCIATES HAS PROVIDED CONTROL POINT #99 NOTED
ON THESE PLANS FOR CONTRACTORS USE.
3. THE CONTRACTOR SHALL ESTABLISH ADDITIONAL CONSTRUCTION SURVEY
CONTROL AND STAKE PROPERTY LINES AS REQUIRED.
4. THE CONTRACTOR SHALL CONTACT THE NATIONWIDE UTILITY HOTLINE
(811), UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987, AND/OR
LOCAL UTILITY LOCATE SERVICES TO REQUEST LOCATES OF ALL UNDERGROUND
UTILITIES AT LEAST 72 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITIES.
5. UTILITY CONFLICTS: ALL EXISTING UTILITIES SHOWN, CURB STOP
LOCATIONS, AND INDIVIDUAL SERVICE SIZES WERE COMPILED USING THE BEST
AVAILABLE INFORMATION AND FIELD OBSERVATION. MERRICK AND COMPANY
DOES NOT GUARANTEE THE LOCATION OR SIZE OF UNDERGROUND UTILIZES
SHOWN HEREON. CONTRACTOR TO BE RESPONSIBLE FOR FIELD VERIFYING THE
LOCATION OF AND PROTECTING ALL EXISTING UTILITIES, INCLUDING THOSE NOT
SHOWN OR SHOWN INCORRECTLY ON THE PLANS. ANY DAMAGE TO EXISTING
UTILITIES SHALL BE REPAIRED IN A TIMELY FASHION TO THE SATISFACTION OF THE
APPROPRIATE GOVERNING AGENCY AND THE OWNER OF THE IMPACTED UTILITY
AT THE CONTRACTOR'S EXPENSE.
6. EXISTING UTILITIES ARE DEPICTED ACCORDING TO THE BEST AVAILABLE
INFORMATION THAT WAS PROVIDED BY THE UTILITY OWNERS AND SURFACE
FEATURES OBSERVED AT THE TIME OF THE SURVEY. RELIANCE UPON THIS DATA
DOES NOT RELIEVE THE CONTRACTOR FROM FOLLOWING ALL APPLICABLE UTILITY
DAMAGE PREVENTION STATUES, POLICES, AND/OR PROCEDURES DURING
CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTOR
ACTIVITIES WITH ANY AFFECTED UTILITY COMPANY.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES
AND/OR POTHOLING OF EXISTING UTILITIES PRIOR TO BEGINNING OF ANY
CONSTRUCTION ON THE PROJECT. IF CONFLICTS ARE DISCOVERED AS A RESULT
OF TEST HOLE FINDINGS, NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY
INCLUDING PIPE TYPE, SIZE, CONDITION, ELEVATION, AND LOCATION.
8. QUALITY LEVEL DESCRIPTIONS: SUBSURFACE UTILITIES ARE SHOWN IN
APPROXIMATE HORIZONTAL AND VERTICAL LOCATIONS CONSISTENT WITH ASCE 38
QUALITY LEVELS A, B, C, AND D AS NOTED ON PLANS.
A. QUALITY LEVEL A: PRECISE HORIZONTAL AND VERTICAL LOCATION OF
UTILITIES OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF
PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT
MEASUREMENT OF SUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT.
MINIMALLY INTRUSIVE EXCAVATION EQUIPMENT IS TYPICALLY USED TO MINIMIZE
THE POTENTIAL FOR UTILITY DAMAGE. A PRECISE HORIZONTAL AND VERTICAL
LOCATION, AS WELL AS OTHER UTILITY ATTRIBUTES, IS SHOWN IN CONTRACT
DOCUMENTS.
B. QUALITY LEVEL B: INFORMATION OBTAINED THROUGH THE APPLICATION OF
APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE
AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY
LEVEL B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT POINTS
OF THEIR DEPICTION. INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES
DEFINED BY THE PROJECT AND REDUCED ONTO CONTRACT DOCUMENTS.
C. QUALITY LEVEL C: INFORMATION OBTAINED BY SURVEYING AND PLOTTING
VISIBLE ABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONAL
JUDGEMENT IN CORRELATING THIS INFORMATION TO QUALITY LEVEL D
INFORMATION.
D. QUALITY LEVEL D: INFORMATION DERIVED FROM EXISTING RECORDS OR
ORAL RECOLLECTIONS.
SUPPLEMENTAL WATER NOTES:
1. ALL CONSTRUCTION SHALL CONFORM TO THE TOWN OF FRASER DESIGN
CRITERIA AND CONSTRUCTION STANDARDS AS APPLICABLE. ALL WORKMANSHIP
SHALL BE SUBJECT TO INSPECTION BY THE TOWN, OR ITS REPRESENTATIVES. ONE
OR ALL OF THE PARTIES HAS THE RIGHT TO REJECT MATERIALS AND
WORKMANSHIP WHICH DO NOT CONFORM TO THE SPECIFICATIONS.
2. ALL CHEMICALS, SUBSTANCES, AND MATERIALS INTENDED TO BE USED IN A
PUBLIC WATER SYSTEM SHALL CONFORM TO NSF ANSI STANDARD 64 AND 61.
3. ANY WATER SERVICE OUTAGES SHALL BE NO LONGER THAN 24 HOURS.
ANY SERVICE OUTAGE MUST BE APPROVED IN ADVANCE BY THE TOWN OF
FRASER.
4. THE CONTRACTOR SHALL PERFORM A PRESSURE AND LEAKAGE TEST, A
TRACER WIRE CONTINUITY TEST, AND VALVE OPERATION TEST PER TOWN
STANDARDS.
5. THE CONTRACTOR SHALL PERFORM A CHLORINE AND BACTERIOLOGIC
TEST PER THE TOWN STANDARDS.
6. WHERE CONSTRUCTION OCCURS IN OR ACROSS ASPHALT OR CONCRETE
PAVEMENT, SAW CUT THE PAVEMENT FOR A CLEAN STRAIGHT EDGE TO ASSURE
PROPER PATCHING.
7. WHERE CONSTRUCTION DISTURBANCE OR EXCAVATION OCCURS ON
PRIVATE PROPERTY, REPLACE DISTURBED LANDSCAPE AND DRIVE ELEMENTS TO
AN EQUAL OR BETTER THAN PRE-CONSTRUCTION CONDITION.
8. ALL NEW WATER PIPING SHALL INCLUDE TRACER WIRE PER TOWN
STANDARDS. CONNECT TO EXISTING TRACER WIRE WHERE APPLICABLE. IF NO
TRACER EXISTS AT WATER UTILITY CONNECTION POINTS THEN STUB UP TRACER
WIRE TO TRACER WIRE TEST BOX TO BE SET NEAR THAT LOCATION OR GROUND
WITH 1.5# MAGNESIUM ANODE ROD.
9. OPEN TRENCH LENGTH SHALL NOT BE IN EXCESS OF 200-FEET PER CREW.
10. ALL PIPE LENGTHS ARE APPROXIMATE.
11. ROUGH GRADING TOLERANCE SHALL BE +/- 0.1 FEET.
12. ALL BENDS, TEES, FITTINGS, AND JOINTS SHALL BE RESTRAINED WITH
MECHANICAL JOINTS AS PER ATTACHMENT A-21 AND A-22.
13. THRUST BLOCKS WHERE NOTED SHALL BE PLACED USING A MINIMUM OF
3000 PSI (28-DAY COMPRESSIVE STRENGTH) CONCRETE PER ATTACHMENT A-20.
14. MECHANICAL RESTRAINTS, FITTINGS, DUCTILE IRON, AND BURIED METAL
PIPE COMPONENTS SHALL BE POLYWRAPPED USING V-BIO ENHANCED POLYWRAP
OR EQUAL IN ACCORDANCE WITH AWWA C105.
15. BACKFILL FOR ALL WATER MAINS AND SERVICES WITHIN THE ROAD
RIGHT-OF-WAYS AND WITHIN PRIVATE PROPERTY SHALL BE COMPACTED PER THE
TOWN STANDARDS AND RECOMMENDATIONS OF THE GEOTECHNICAL REPORT
PREPARED BY KUMAR AND ASSOCIATES DATED JUNE 25, 2024.
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -G en er al No tes .dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
GHS
GENERAL NOTES G-002
E
SS
C
TV
TV
FO
FO
FO
SSMH #10707
RIM=8547.69
8" PVC INV (N)=8540.65
8" PVC INV (E)=8541.75
8" PVC INV (S)=8540.78
SSMH #10686
RIM=8544.45
8" PVC INV (N)=8537.74
8" PVC INV (E)=8537.90
8" PVC INV (S)=8537.84
SSMH #10656
RIM=8549.85
8" PVC INV (N)=8539.83
SSMH #10606
RIM=8544.98
8" PVC INV (S)=8538.34
8" PVC INV (E)=8539.50
8" PVC INV (N)=8538.47
SSMH #10740
RIM=8539.12
8" PVC INV (N)=8532.18
8" PVC INV (S)=8532.20
WATER VALVE
RIM=8541.94
WATER VALVE
RIM=8541.89
WATER VALVE
RIM=8543.00
NUT=8536.58
EXISTING 8"
GATE VALVE #E057
RIM=8542.99
NUT=8536.82
WATER VALVE
RIM=8544.46
WATER VALVE
RIM=8544.50
WATER VALVE
RIM=8545.84
WATER VALVE
RIM=8558.21
WATER VALVE
RIM=8558.30
NUT=8550.38
WATER VALVE
RIM=8558.02
EXISTING CLOSED
GATE VALVE
RIM=8559.75
EXISTING
8"
GATE
VALVE
#E036
RIM=8557.87Q
U
AI
L D
R
IV
E
(3 0'
R .O
.W . O
R D
. 7
-8
0)
WATER VALVE
RIM=8544.42
WATER VALVE
RIM=8557.64
WATER VALVE
RIM=8557.66
SSMH #12017
RIM=8548.06
12" PVC INV (N)=8540.56
12" PVC INV (SE)=8540.66
SSMH #12016
RIM=8552.19
12" PVC INV (N)=8546.47
12" PVC INV (S)=8546.94
8" PVC INV (SE)=8546.94
CURB STOP
SHOT ON TOP VALVE BOX
RIM=8540.02
CURB
STOP
SHOT ON
TOP OF
VALVE
BOX
RIM=8541.64
WATER VALVE
SHOT ON TOP OF PIPE
RIM=8546.71
SSMH #10601
RIM=8550.37
8" PVC INV (S)=8538.85
8" PVC INV (W)=8538.97
8" PVC INV (N)=8538.96
EDGE
OF
WATER
EXISTING 8"
GATE VALVE #E037
RIM=8557.87
NUT=8549.45
SSMH #12771
RIM=8564.25
12" STL INV (SE)=8555.73
12" STL INV (NW)=8555.70
SSMH #12609
RIM=8574.18
SSMH #12610
RIM=8589.58
SSMH #12608
RIM=8569.66
6" SAN TOP (N)=8562.26
6" SAN TOP (NE)=8562.44
6" SAN TOP (E)=8562.80
6" SAN TOP (SE)=8561.16
6" SAN TOP (S)=8562.80
6" SAN TOP (SW)=8561.11
12" STL TOP (NW)=8559.56
WAPITI DRIVE
W
APITI LANE
FO
X
LA
NE
S W
AP
IT
I D R
IV
E
CP=99
N=1225071.30 E=2913594.54
ELEV=8559.09
REMOVE AND
REPLACE EXISTING
8" GATE VALVE
WITH NEW 8" MJ
GATE VALVE.
CUT IN WITH SOLID
SLEEVE MJ
RESTRAINED COUPLING
CURB STOP
SHOT ON TOP VALVE BOX
RIM=8540.02
EXISTING
GATE
VALVE
#E038
EXISTING 8"
GATE VALVE #E029
RIM=8544.03
NUT=8537.95
W
W W
W
WWWWW
CONTROLS AND SEQUENCING PLAN C-100
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -C on tro ls an d S eq ue nc ing P lan .dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
GHS
N
1" = 30' HOR.
30' 15' 30' 60'0
A
B
C
PROJECT SEQUENCING:
A. FOX LANE TO S. WAPITI WATER MAIN
B. VALVE REPLACEMENT AND CROSS INSTALLATION
1. EXCAVATE/EXPOSE/CONFIRM CONDITIONS AT EXISTING TEE IN QUAIL
DRIVE AND VALVE E037.
2. ISOLATE EFFECTED MAIN: CLOSE VALVES E036, E030, AND E057.
3. CUT/DRAIN PIPE. REMOVE AND REPLACE EXISTING VALVE E037. REMOVE
VALVES & TEE ON QUAIL DRIVE AND REPLACE WITH NEW CROSS AND
VALVES. - SINGLE DAY SHUTDOWN.
4. RECHARGE WATER MAIN
C. INSTALL NEW WATER MAIN AT NORTH SITE ALONG RIVER GREEN BELT.
ASPHALT SAWCUT
AND HOT MIX
ASPHALT PATCH
CONCRETE V-PAN
SAWCUT AND
REPLACEMENT
ASPHALT SAWCUT
HOT MIX ASPHALT PATCH
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
GATE VALVE #E030
SEE SHEET C-101
B
W
E
W
C
SSMH #10656
RIM=8549.85
8" PVC INV (N)=8539.83
SSMH #10606
RIM=8544.98
8" PVC INV (S)=8538.34
8" PVC INV (E)=8539.50
8" PVC INV (N)=8538.47
WATER VALVE
RIM=8541.94
WATER VALVE
RIM=8541.89
WATER VALVE
RIM=8543.00
NUT=8536.58
EXISTING 8"
GATE VALVE #E057
RIM=8542.99
NUT=8536.82
WATER VALVE
RIM=8544.46
WATER VALVE
RIM=8544.50
WATER VALVE
RIM=8545.84
WATER VALVE
RIM=8558.21
WATER VALVE
RIM=8558.30
NUT=8550.38
WATER VALVE
RIM=8558.02
EXISTING CLOSED
GATE VALVE
RIM=8559.75
EXISTING 8"
GATE VALVE #E036
RIM=8557.87
Q U
AI
L
D R
IV
E
(3 0'
R .O
.W . O
R D
. 7
-8
0)
WATER VALVE
RIM=8557.64
WATER VALVE
RIM=8557.66CURB STOP SHOT ON
TOP OF VALVE BOX
RIM=8541.64
SSMH #10601
RIM=8550.37
8" PVC INV (S)=8538.85
8" PVC INV (W)=8538.97
8" PVC INV (N)=8538.96
EDGE OF
WATER
EXISTING 8"
GATE VALVE #E037
RIM=8557.87
NUT=8549.45
CP=99
N=1225071.30 E=2913594.54
ELEV=8559.09
REMOVE AND
REPLACE EXISTING
8" GATE VALVE
WITH NEW 8" MJ
GATE VALVE.
CUT IN WITH SOLID
SLEEVE MJ
RESTRAINED COUPLING
CURB STOP
SHOT ON TOP VALVE BOX
RIM=8540.02
EXISTING
GATE VALVE #E038
EXISTING 8"
GATE VALVE #E029
RIM=8544.03
NUT=8537.95
W
W
W W
W W
W
W
W
6" 45° MJ ELL
6" 22.5° MJ ELL
6" 22.5° MJ ELL
8" SS TAPPING
SLEEVE WITH 6"
MJ OUTLET AND
6" MJ GATE VALVE
REMOVE/RECONNECT SERVICE
TAP WITH NEW SADDLE AND
CORP IF IN CONFLICT WITH
NEW WATER MAIN CONNECTION
EXISTING
WATER LINE
EASEMENT
20.0'
MOUNTAIN PARKS ELECTRIC, INC.
10.0' ELECTRIC EASEMENT
BOOK 229, PAGE 25
174 L.F. 6" C900 PVC
EXISTING 8" DIP
REMOVE EXISTING
TEE AND THREE VALVES.
REPLACE WITH NEW 8" MJ
CROSS FITTING AND THREE
8" MJ VALVES. INSTALL 8"
MJ PLUG ON NORTH LEG.
CUT IN WITH SOLID SLEEVE
MJ RESTRAINED COUPLINGS
AS REQUIRED.
CONNECTION TO EXISTING
WITH NEW 6" 45° MJ ELL WITH TB
6" 22.5° MJ ELL
6" 22.5° MJ ELL
8" SS TAPPING
SLEEVE WITH 6"
MJ OUTLET AND
6" MJ GATE VALVE
REMOVE/RECONNECT SERVICE
TAP WITH NEW SADDLE AND
CORP IF IN CONFLICT WITH
NEW WATER MAIN CONNECTION
EXISTING
WATER LINE
EASEMENT
20.0'
MOUNTAIN PARKS ELECTRIC, INC.
10.0' ELECTRIC EASEMENT
BOOK 229, PAGE 25
EXISTING 6" DIP
174 L.F. 6" C900 PVC
EXISTING 8" DIP
REMOVE EXISTING
TEE AND THREE VALVES.
REPLACE WITH NEW 8" MJ
CROSS FITTING AND THREE
8" MJ VALVES. INSTALL 8"
MJ PLUG ON NORTH LEG.
CUT IN WITH SOLID SLEEVE
MJ RESTRAINED COUPLINGS
AS REQUIRED.
PROPOSED WATER LOOP PLAN (NORTH) C-101
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -S ite P lan .dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
GHS
N
1" = 15' HOR.
15' 7.5' 15' 30'0
OFF PAGE:
EXISTING 8"
ISOLATION GATE
VALVE #E030
0+00
1+001+91
TV
FO
FO
FO
FO
FO
FO
FO
FO
FO SSMH #12608
RIM=8569.66
6" SAN TOP (N)=8562.26
6" SAN TOP (NE)=8562.44
6" SAN TOP (E)=8562.80
6" SAN TOP (SE)=8561.16
6" SAN TOP (S)=8562.80
6" SAN TOP (SW)=8561.11
12" STL TOP (NW)=8559.56
WWWWWWWWWWWWWWWWW
5.0'
30.0'
PROPOSED
EASEMENT
5.0'
MOUNTAIN PARKS ELECTRIC, INC.
20.0' ELECTRIC EASEMENT
BOOK 229, PAGE 25
WESTERN SLOPE GAS
15.0' GAS EASEMENT
(REFERENCED ELSEWHERE AS 25' WIDTH)
BOOK 167, PAGE 156
BOOK 172, PAGE 156
TOWN OF FRASER
20.0' WATER EASEMENT
BOOK 347, PAGE 440
WESTERN SLOPE GAS
30.0' GAS EASEMENT
BOOK 171, PAGE 416
8" 22.5° MJ ELL
6" SS TAPPING
SLEEVE WITH 6"
MJ OUTLET
12" SS TAPPING
SLEEVE WITH 8"
MJ OUTLET
EXISTING 12" DIP.
RECORDS
INDICATE APPX.
DEPTH OF 9'
TO TOP OF PIPE
8" MJ
GATE VALVE
192 L.F. 8" C900 PVC
6" MJ GATE VALVE
EXISTING 6" DIP
EXPOSE EXISTING
MAIN TO CONFIRM
SIZE PRIOR TO
TAPPING.
6"x8" MJ REDUCER
EXPOSE WATER
MAIN TO END OF
EXISTING 6" DIP TO
CAP PROPERLY
WITH MJ PLUG OR
SIMILAR AND
ABANDON IN PLACE
THE GALVANIZED
BLOW OFF.
RESTORE ALL
DISTURBED
GRAVEL ROAD
SURFACES
CONTRACTOR TO
INVESTIGATE AND
VERIFY NO SEWER
SERVICE CONFLICTS
WITH PROPOSED
WATER MAIN
0+000+501+001+501+91
10 LF 8" C900 @ 2.8%
14 LF 8" C900 @ 3.1%
STA: 0+09
8" 22.5° MJ ELL
STA: 0+41
8" 11.25° MJ ELL
135 LF 8" C900 @ 3.6%
STA: 0+23
8" 11.25° MJ ELL
17 LF 8" C900 @ 20.3%
STA: 1+77
8" 11.25° MJ ELL
13 LF 8" C900 @ 0.2%
6"x8" MJ REDUCER
6" MJ GATE VALVE
8" MJ GATE VALVE
EXISTING GROUND
12" SS TAPPING SLEEVE WITH 8" MJ OUTLET
6" SS TAPPING SLEEVE WITH 6" MJ OUTLET
APPROXIMATE LOCATION
OF 6" SAN SERVICE
TOP EL: ~8561.87
PROPOSED WATER LOOP PLAN (EAST) C-102
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -S ite P lan .dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
GHS
N
1" = 10' HOR.
10' 5' 10' 20'0
SHEET NOTES:
1. EXISTING WATER MAIN DEPTHS ARE UNCONFIRMED. WHERE
NEW WATER MAIN CONNECTIONS REQUIRE LESS THAN 9-FT OF
COVER, CONTRACTOR SHALL INSTALL 2-IN CLOSED CELL FOAM
BOARD OVER WATER MAIN FOR EACH FOOT LESS THAN 9-FT
COVER UP TO MINIMUM ALLOWABLE BURY DEPTH OF 7-FT.
2. CONTRACTOR SHALL INCLUDE NO LESS THAN TWO DAYS OF
EXPLORATORY EXCAVATION IN FOX LANE TO CONFIRM WATER
MAIN CONNECTION POINT AND ALIGNMENT.
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -C ivi l D eta ils
.dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
CIVIL DETAILS D-100
AN
D
CO
MP
AN
Y
SH
AL
L B E
AT
T
HE
S
OL
E
RI
SK
F
OR
T
HE
U
NA
UT
HO
RI
ZE
D
US
ER
W
IT
HO
UT
LI
AB
ILI
TY
O
R
LO
SS
E
XP
OS
UR
E
TO
M
ER
RI
CK
A
ND
C
OM
PA
NY
Q:
\D en ve r_ No rth \P ro jec ts\
-0
4 F ra se r G en er al Se rvi ce s\T as k W O9
Qu ail D
ES
IG
N\
Q ua il D es ign \C
AD
\C
Ds \12
.09 -C ivi l D eta ils
.dw g
Know what's below.
before you dig.Call
R
REV REVISION DESCRIPTION DATE DSGN CHKD APPR
PE STAMP
FOR AND ON BEHALF OF MERRICK AND COMPANY
2480 W. 26TH AVENUE, UNIT B225, DENVER, COLORADO, 80211
TEL. 303-964-3333
www.merrick.com
OF
DRAWING NO.
DATE
PROJECT NUMBER
MARCH 2025
120492-14
QUAIL DRIVE WATER LOOP
TOWN OF FRASER, COLORADO
TITLEDESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SHEET
CALL BEFORE YOU DIG OWNER / CLIENT
0 1
MERRICKR
SCALE BAR
BAR IS ONE INCH
ON ORIGINAL
DRAWING
IF NOT ONE INCH ON
THIS DRAWING
ADJUST SCALES
ACCORDINGLY
GHS
DRS
CIVIL DETAILS D-101
| Sheets and Views |
| G-001 Cover Sheet |
| G-002 General Notes |
| C-100 Controls and Sequencing Plan |
| C-101 Proposed Water Loop Plan (North) |
| C-102 Proposed Water Loop Plan (East) |
| D-100 Civil Details |
| D-101 Civil Details |
File details come from the government source that posted it. Updated .