This document is a Questions & Answers (Q&A) file for the Quail Drive Water Loop project, issued by the Town of Fraser in Colorado, dated March 19, 2025. The Q&A document covers two primary sets of questions: general inquiries about the Quail Drive project and a question regarding the bid schedule. The questions address several key project details, including potential dewatering allowances, road closure during construction, technical specifications for pipe installations, survey responsibilities, materials testing, and potential bid due date extensions.
The document directs all inquirers to consult Addendum No. 1 for comprehensive answers to the raised questions, indicating that further project clarification will be provided in a separate supplemental document. While the Q&A does not provide direct answers, it suggests that the project involves water main infrastructure improvements, with specific considerations for unknown site conditions, utility conflicts, and construction logistics. The reference to Addendum No. 1 implies that potential bidders should carefully review that document for detailed guidance on the project's technical and procedural requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUAIL DRIVE WATER LOOP Drawings_3-6-25.pdf | ||
| ADDEND. NO 1_3-20-25_FINAL.pdf | ||
| QUAIL DRIVE WATER LOOP_Specifications_3-6-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 1
Project 2025 - Quail Drive Water Loop - Quail Drive Watermain Loop
Buying Organization Town of Fraser
No Question/Answer Question Date
Q1 Question: General Questions Quail Drive
March 19, 2025
•Due to unknown conditions will a Dewatering \Allowance be considered?
•Can roads be completely closed during construction?
•Will Foster Adapters be allowed?
•If Sanitary is found to be in conflict will Encasement, pipe in pipe treatment or joint centering with boots, be required?
•Who is responsible for survey?
•Will Survey Certification of Valve location and elevation be required?
•Who is responsible for materials testing?
•Can exploratory work be completed well in advance of the remaining scope?
Answer: See Addendum No 1.
03/19/2025
Q2 Question: Bid Schedule
Will there be any extension to the bid due date?
Answer: See Addendum No. 1
03/19/2025
Questions & Answers - 1