PW Oakland Blvd & Miller Ave Safe Streets City Project Number: 104803

Closed State & local contract opportunity Posted

Solicitation number
26-0298
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from fortworthtexas.bonfirehub.com. Updated .

About this opportunity

The City of Fort Worth, Texas is requesting bids on the Oakland Boulevard & Miller Avenue Safe Streets project (Project Number 104803) with bids due September 24, 2026 at 2:00 PM CDT and a pre-bid meeting held on September 14, 2026. Non-resident bidders (those with principal places of business outside Texas) must comply with Texas Government Code Chapter 2252 regarding competitive bidding adjustments.

The scope encompasses signal improvements, pavement markings, a Pedestrian Hybrid Beacon, pedestrian curb ramps, sidewalk construction, and a protected bike lane with precast concrete curb barricades across two units. Unit 1 (CCSJ 0902-90-296) includes mobilization, traffic control, erosion control, concrete and pavement removal, curb ramps, reflective pavement markers, and signal components. Unit 2 (CSJ 0902-90-350) includes concrete pavement removal and replacement, asphalt planing, base course installation, 12 roadway lights, curb and sidewalk work, and expanded signal and beacon infrastructure. The bid proposal workbook contains 179 line items. The contract period is 280 days from commencement, with liquidated damages provisions for schedule delays.

Prequalification is mandatory for asphalt paving construction (less than 15,000 square yards) and roadway and pedestrian lighting work; bidders must identify prequalified contractors and subcontractors before submission. A bid bond equal to 5% of the maximum bid price is required. All bidders must submit 13 required documents including the completed BidTable in Excel format, conflict of interest statement, bid form, proposal form, prequalification statement, workers' compensation certification, state of Texas child support certification, non-collusion affidavit, debarment certification, and Addendum No. 1. The question period runs through September 11, 2026 at 2:00 PM CDT. Submissions are made through the Bonfire portal at https://fortworthtexas.bonfirehub.com/opportunities/249092. Addendum 1 was issued and posted August 26, 2026.

Opportunity text

The major work will consist of the (approximate) following: Signal Improvements, pavement markings, Pedestrian Hybrid Beacon, Pedestrian Curb Ramps and sidewalk, protected bike lane (precast concrete curb barricades).