Pre-Advertisement Notice for Chastain Park Parking Garage Design Build
Open State & local contract opportunity Posted
- Solicitation number
- PE-66062-NONST-2027-000000493
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15553 Parking Structures
- 90638 General Construction - Architectural
- 90924 Building Construction, Commercial And Institutional
- 91149 C.i.p., Program Of Requirements
- 91361 Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish
- 92536 Engineering Services (Not Otherwise Classified)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- 98832 Grading (Of Parking Lots, Etc. - Not Road Building)
- UNSPSC codes
- 95121500 Commercial and entertainment buildings and structures
- 95121704 Prison building
- 95121503 Cafeteria
- 95121703 Court building
- 95121606 Railway station
- 95121701 Post office
- 72121105 Shopping center and mall construction service
- 72141401 Detention facility construction service
- 95121604 Bus garage
- 95121607 Railway depot
Show all 43
- 95121605 Automotive repair or servicing building
- 95121711 Civic center
- 81102501 Mine permitting service
- 72141400 Detention facility construction and repair services
- 72121104 Restaurant construction service
- 95121712 Art gallery
- 95121608 Underground railway station
- 95121501 Shopping mall
- 95121715 Public toilet facility
- 95121506 Theater
- 95121705 Fire station
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
- 72121100 Commercial and office building construction services
- 95121700 Public buildings and structures
- 72111104 New dormitory construction service
- 72111105 New hotel or motel construction service
- 72121101 Commercial and office building new construction service
- 72141128 Public square construction and or remodelling service
- 95121702 Police station
- 95121603 Bus station
- 95122106 Hostel
- 95121505 Shopping center
- 95121504 Shop building
- 95121714 Public changing room and shower facility
- 95121507 Market
- 95121706 Ambulance station
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- Point of contact
-
- Mark Coleman-Mabry mscoleman-mabry@atlantaga.gov (404) 782-3397
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta, Department of Parks and Recreation, will issue a Request for Proposals for design-build delivery of a new Chastain Park Parking Garage with proposals due November 6, 2026, under a pre-advertisement notice posted October 5. M/FBE participation goals of 25% Minority Business Enterprise and 10% Female Business Enterprise apply; joint venture agreements are mandatory for projects valued at five million dollars or greater, each comprising at least one City of Atlanta certified M/FBE partner with different race or gender ownership from other participants.
The scope encompasses comprehensive design-build delivery including architectural and engineering design, permitting, site demolition, utility relocation, geotechnical investigation, phased detailed design submissions (preliminary, detailed, and final), construction management, quality assurance and testing, commissioning, and facility turnover with warranties. The new four-tier parking structure will accommodate a minimum of 290 parking spaces across approximately 95,500 square feet with a 230-by-121-foot footprint. Design must comply with the 2024 International Building Code with Georgia amendments, ACI 318-11, and ASCE 7-10; include 62 electric vehicle ready spaces exceeding the City's 20% requirement; feature a Parking Access and Revenue Control System (PARCS) with dual entry/exit stations, cloud-based SaaS management, and payment processing (Visa, MasterCard, American Express, Discover); and support LEED certification. Cast-in-place concrete frame construction with steel stair enclosures, brick veneer exterior, and TPO membrane roofing are specified. All design submittals require sealed signatures by Georgia-licensed professionals in AutoCAD Release 2024 format.
Contract value is not stated in the pre-advertisement notice. Substantial Completion is required within 455 calendar days from Notice to Proceed, with Final Completion within 485 calendar days; liquidated damages are $500 per working day for Substantial Completion delay and $1,000 per working day for Final Completion delay. Insurance requirements include Commercial General Liability of $2 million per occurrence/$4 million aggregate, Commercial Automobile Liability of $1 million combined single limit, Builders Risk equal to 100% of contract value, and Professional Liability of $1 million per occurrence with three-year Extended Reporting Provision. Performance and Payment Bonds equal to 100% of contract value are required, underwritten by U.S. Treasury Circular 570 listed carriers with Best's A- or higher rating.
Proposals will be scored across six weighted criteria: Executive Summary/Organizational Structure (10 points), Key Personnel and Prior Performance (15 points), Management Plan (10 points), Conceptual Submittal (35 points), Sustainability Elements (10 points), and Cost Proposal (20 points). The cost proposal requires submission of a lump sum for primary delivery plus three mandatory allowances: Owner's Allowance of $250,000, Partnering Allowance of $2,000, and LEED Certification Process Allowance of $150,000. A Pre-Solicitation Conference will be announced to address vendor questions on criteria and deliverables.
Opportunity text
The City of Atlanta, on behalf of the Department of Parks and Recreation (DPR), will shortly issue a Request for Proposals (RFP) to procure a qualified Design¿Build Team for the delivery of the new Chastain Park Parking Garage. Interested firms will be evaluated based on demonstrated experience, technical capability, ability to meet schedule requirements, and capacity to manage multidisciplinary design¿build delivery. The City¿s expectation is that the selected Design¿Build team will be responsible for comprehensive project execution encompassing design, permitting, engineering, construction, quality assurance, and facility turnover. Scope elements include community engagement, demolition, site preparation, utility relocation, geotechnical investigation, detailed design submissions, schedule development, construction, testing, commissioning, and warranty support. A Pre¿Solicitation Conference will be announced to provide additional project clarity and address vendor questions regarding criteria, deliverables, and expectations.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity