This is a Design Criteria Package (DCP) and Scope of Work document for the City of Atlanta, Georgia, Department of Parks and Recreation, for the design-build delivery of a new Chastain Park Parking Garage. The project encompasses comprehensive scope elements including community engagement meetings, detailed design in multiple phases (preliminary, detailed, and final), pre-construction engineering, permitting, site inspection, demolition, site preparation, utility relocation, geotechnical investigation, procurement, project management, construction, quality assurance and quality control, independent testing and inspection, and facility turnover with warranties and training. The Design/Builder is required to submit ten hard copies and PDF copies of all design submittals during preliminary, detailed, and final design phases, with drawings prepared on 22-inch by 34-inch paper in AutoCAD Release 2024 format. All design submittals must be sealed and signed by a Georgia-licensed professional engineer or architect. The document establishes specific design phases with identified deliverables: preliminary design phase includes preliminary drawings, permit lists, specifications table of contents, geotechnical findings, materials of construction tables, construction traffic management plan, sustainable design plan, and erosion and sediment control plans; detailed design phase (50-60% complete) includes architectural schedules, landscape details, updated site plans, equipment performance testing plans, and refined basis of design; and final design phase includes 100-percent construction-ready drawings and specifications sealed by state-registered professionals.
The Design Criteria Package establishes comprehensive technical requirements across all disciplines including site/civil, architectural, structural, mechanical (HVAC and plumbing), and electrical design. Architectural requirements address codes and standards compliance with 2024 International Building Code and Georgia Amendments, building design elements including accessible parking per 2010 Standards for Accessible Design with eight-foot-wide spaces and five- or eight-foot access aisles, pedestrian safety requirements, parking layout efficiency of 300-340 square feet per space, masonry and metals specifications, fire suppression systems (preference for non-sprinkled system with dry standpipe and floor-level Fire Department Connections), HVAC natural ventilation with optional split systems for utility and elevator rooms, complete plumbing systems for all levels, LED lighting with daylight sensors, Ring Down Emergency Telephones at payment kiosks, interior and exterior CCTV systems interfaced with City of Atlanta monitoring, EV charging stations per City Ordinance 17-O-1654, and an Intelligent Parking System with ultrasonic detectors and payment kiosks accepting cash, credit/debit cards, or tokens. Structural design must comply with 2024 IBC with Georgia Amendments, ACI 318-11, and ASCE 7-10 standards. All site utilities including water, gas, electrical, communications, sanitary sewer, and storm sewer lines are existing adjacent to the site, with existing overhead lines located in Chastain Park Avenue right-of-way and two fire hydrants present on the south side of the avenue. The Design/Builder assumes risk for existing site conditions and must comply with Georgia State Plane Coordinates System, North Zone (NAD 83-90) for horizontal control and NAVD 1988 for vertical control, with all drawing standards and submittal requirements clearly defined in the DCP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A-1
DESIGN CRITERIA
PACKAGE/SCOPE OF WORK
DRAFT
Design Criteria Package Design Build Chastain Park
October 2026 Parking Garage
DESIGN CRITERIA PACKAGE/SCOPE OF WORK
CITY OF ATLANTA, GEORGIA
DESIGN-BUILD
Chastain Park Parking Garage
RFP-C-DPR-XXXX-XXXXXXX
O ct o b e r 2026
October 2026 Parking Garage
Table of Contents
1.0 Introduction ..................................................................................................................1-1
1.1 General Project Description………………………………………………………..1-1
1.1.1 Overview……………………………………………………………………...1-1
1.2 Project Scope of Work……………………………………………………………..1-1
1.3 Project Design Phases……………………………………………………………...1-2
1.3.1 Preliminary Design Phase……………………………………………………..1-2
1.3.2 Detailed Design Phase………………………………………………………..1-3
1.3.3 Final Design Phase……………………………………………………………1-4
1.4 Drawing Formats and Requirements………………………………………………1-4
1.5 Submittal Requirements……………………………………………………………1-5
2.0 Site Utilities……………………………………………………………………..2-1
3.0 Design Criteria..............................................................................................................3-1
3.1 General Site/Civil Design Criteria ………………………………………………..3-1
3.1.1 Detailed Field Surveys ………………………………………………………3-1
3.1.2 Horizontal and Vertical Coordinate System ………………………………...3-1
3.1.3 Design Documentation…………………………………………………..3-1
3.1.4 Demolition Plans…………………………………………………………3-2
3.1.5 Outside Piping Plans, Profiles and Sections……………………………..3-3
3.1.6 Traffic Maintenance and Signing Plans………………………………….3-4
3.1.7 Erosion and Sediment Control Plans…………………………………….3-5
3.1.8 Landscape Plans………………………………………………………….3-5
3.2 General Architectural Design Criteria…………………………………………..3-5
3.2.1 Codes and Standards………………………………………………………………3-6
October 2026 Parking Garage
3.2.2 Building Architectural Requirements……………………………………………..3-6
3.2.3 Life-Cycle Cost Effectiveness…………………………………………………...3-9
3.2.4 Maintenance…………………………………………………………………3-10
3.2.5 Accessible Parking Requirements…...………………………………………3-10
3.2.6 Pedestrian Requirements…………………………………………………….3-10
3.2.7 Parking Layout Efficiency………..…………………………………………3-10
3.2.8 Exterior Improvements……………………………………………………...3-11
3.2.9 Masonry……………………………………………………………………..3-11
3.2.10 Metals………..………………………………………………………………3-11
3.2.11 Thermal & Moisture Protection……………………………………………..3-11
3.2.12 Openings…………………………………………………………………….3-11
3.2.13 Interior Finishes……………………………………………………………..3-11
3.2.14 Overhead Coiling Doors…………………………………………………….3-12
3.2.15 Stairs………………………………………………………….......................3-12
3.2.16 Signage & Wayfinding……………………………………………………...3-12
3.2.17 Passenger Elevators……….………………………………………………...3-12
3.2.18 Parking Control Equipment…………………………………………………3-13
3.2.19 Fire Suppression System……………………………………………………3-13
3.2.20 HVAC System………………………………………………………………3-13
3.2.21 Plumbing System………..…………………………………………………..3-13
3.2.22 Electrical System…………………….……………………………………...3-14
3.2.23 Communications…………………………………………………………….3-14
3.2.24 Electronic & Security Systems……………………………………………...3-14
3.2.25 Noise Abatement/Mitigation Plan…………………………………………..3-14
3.2.26 Electric Vehicle (EV) Charging Stations...…………………….……………3-14
October 2026 Parking Garage
3.3 General Structural Design Criteria………………………………………………..3-14
3.3.1 Purpose and Content.…………………………………………………………3-14
3.3.2 Applicable Codes, Standards and References……………………………………3-15
3.3.3 Guidelines and Procedures……………………………………………………….3-15
3.3.4 Loads……………………………………………………………………………..3-15
3.3.5 Foundations………………………………………………………………………3-16
3.3.6 Slab-on-Grade……………………………………………………………………3-16
3.3.7 Floor Construction……………………………………………………………….3-16
3.3.8 Roof Construction………………………………………………………………..3-16
3.4 General Building Mechanical Services Design Criteria…………………………...3-17
3.4.1 General………………………………………………………………………3-17
3.4.2 HVAC……………………………………………………………………….3-17
3.4.3 Plumbing…………………………………………………………………….3-24
3.5 General Electrical Design Criteria………………………………………………...3-27
3.5.1 Electrical Design Standards…………………………………………………3-27
3.5.2 Design Criteria and Guidelines……………………………………………...3-31 DRAFT
SECTION 1 INTRODUCTION
October 2026 Parking Garage
1-1
1.0 INTRODUCTION
1.1 General Project Description
The City of Atlanta, Georgia is using the Design-Build delivery method for design, permitting and construction of the Chastain Park Parking Garage, (Project). This Design Criteria Package
(DCP) presents specific minimum requirements related to the features to be provided by the Design/Builder selected for the Project. This DCP is an Exhibit to the Request for
Proposal (RFP) document issued by the City's Department of Procurement (DOP).
1.1.1 Overview
This DCP presents the minimum requirements for design, permitting and construction of the new Parking Garage. The DCP contains Project-specific requirements including minimum design criteria for individual unit operations and processes; general technical requirements for engineering disciplines and architectural requirements; and start-up, training, and commission requirements. Although minimum requirements are established in this DCP, the Design/Builder shall be fully responsible for final design, construction and performance of the Project.
1.2 Project Scope of Work
The successful Design/Builder will design and construct the Project in accordance with the requirements of this RFP, the Design Criteria and technical requirements and all other
Exhibits and Appendices and any Addenda to this RFP, including all documents, included therein, site survey, specifications, and other information references in and/or included therein, all of which materials are incorporated into this RFP by reference.
The specific areas of Work for this Project include, but are not limited to, the following:
1. Conduct Community Engagement meetings to review conceptual design prior to completion of the Preliminary Design Phase.
2. Complete detailed design of this Project in accordance with the Design
Criteria;
3. Pre-construction engineering, planning, coordination and permitting;
4. Site Inspection and Engineering;
5. Demolition, site preparation, and existing utility relocation;
6. Procurement of all design, engineering, and construction Work and materials;
1-2
7. Design Management;
8. Project Management;
9. Subcontractor staging, management; and coordination;
10. Materials staging and management;
11. Site access management and scheduling;
12. Independent special testing and inspection(s);
13. Procurement and management of all subcontractors, vendors, and suppliers;
14. Cost estimation, scheduling, and controls in accordance with City Policy and Procedures regarding Project Controls and reporting;
15. Detailed Design Phase
16. Construction of the Project;
17. Quality assurance and quality control, including inspection and testing; and
18. Turnover of facilities and systems, including warranties, operation instruction, and training.
1.3 Project Design Phases
It is the City's intentions to support schedule efficiencies throughout the Project. The following design phase reviews are not intended to prohibit activities which could be concurrently executed; rather, are established to identify opportunities for City to observe progress and conformance to criteria established herein. Where possible, the
Design/Builder should identify opportunities to gain schedule efficiencies in their project approach. The Design/Builder is permitted to submit specific discipline design drawings for City review to expedite the Project schedule. Any early submittal documents proposed shall be defined by the Design/Builder. The minimum project design phases will include:
1. Preliminary Design Phase
2. Detailed Design Phase
3. Final Design Phase
1.3.1 Preliminary Design Phase
The following deliverables will be developed by the Design/Builder during the preliminary design phase:
+ List of applicable permits and status of permitting processes;
+ Preliminary Drawings
1-3
• Preliminary Drawings including demolition plans, site civil plans, architectural, structural, mechanical, plumbing and electrical drawings;
+ Specification Table of Contents and major equipment specifications;
+ Subsurface investigation requirements and/or findings;
+ Geotechnical services and survey work as required;
+ Materials of construction tables, showing locations and materials proposed, for equipment, piping, pipe supports, hardware, structural materials and any other services subject to corrosion;
+ Construction traffic management plan;
+ Description of safety elements included in the facilities;
+ Sustainable Design Plan, substantiating the measures used to design and build the facilities using sustainable design principles;
+ Erosion and sediment control plans and applicable documentation (NOI, etc.)
1.3.2 Detailed Design Phase
During the detailed design phase (between 50%-60% complete), the Basis of Design is refined and all major design decisions are made by the Design/Builder and reviewed by the City. It is anticipated that the Design/Builder will include regular Project progress meetings to foster dialog and communicate Project information.
In general, the Design/Builder team will be expected to finalize all major design decisions.
The following are typical deliverables developed during the Detailed Design Phase:
+ Architectural door, window, finish and hardware schedules and details;
+ Landscape details and planting materials lists;
+ Updated drawing and specifications lists;
+ Updated site, grading, drainage, landscaping and electrical site plans;
+ Updated process and support facility general arrangement plans;
+ Site sections and details;
+ Updated electrical single-line drawings;
+ Building and structure foundation plans, floor plans and sections; Concrete mix design(s);
+ Updated architectural plans and elevations (including landscape plans and details, at least one full building section, and a representative wall and plan);
1-4
+ Updated mechanical systems plans, sections and details;
+ Equipment performance testing plans.
Concepts developed and reviewed during the Detailed Design Phase are considered fixed.
1.3.3 Final Design Phase
At the final design phase, all major decisions have been made and the work of previous phases is considered fixed.
The 100 percent design is a complete construction ready package with sufficient copies for files and Design/Builder use for execution of the Project. In general, during this phase, the Design/Builder shall be expected to prepare final construction drawings and specifications for review and address any outstanding comments from the City, regulatory agencies or other pertinent entities.
The following are typical deliverables developed during this Phase:
+ Final plans, sections and details for civil, architectural, landscaping, structural, mechanical, plumbing and electrical Drawings;
+ Final technical specifications for all work disciplines;
+ Landscaping and planting lists;
• Architectural door, window, finish and hardware schedules and details;
+ Final electrical single-line drawings;
+ Final electrical panel schedules;
+ O&M plans
Following the appropriate review and incorporation of comments, all drawings shall be sealed and signed by a State-registered professional architect/engineer of the appropriate discipline.
1.4 Drawing Formats and Requirements
Drawings shall be prepared using the following standards:
+ All Drawings shall be prepared on 22-inch by 34-inch paper. The City shall provide the Design/Builder with a standard title block that shall be used for all
Drawings.
+ Digital drawing files shall be submitted at the completion of design in AutoCAD
Release 2024 format. A unique file name shall be assigned to each Drawing. A
1-5 consistent file naming format shall be used throughout the Project.
+ Signature blocks shall be included to show the name of primary individual producing Drawing, the primary designer, the primary reviewer, and the
Design/Builder Engineer approving the Drawing. All names in the signature block shall be the first initial and the complete last name.
+ Standard legends and abbreviations shall be used throughout the Project.
Standard legend sheets shall be prepared containing all symbols and abbreviations used on the Drawings.
+ Drawings shall include a sequential revision number to allow tracking of the
Drawings. Title block shall note Drawings issued for procurement or construction and any subsequent changes including final.
1.5 Submittal Requirements
+ All Design Submittals required under Applicable Laws to be sealed and signed shall be signed and sealed by the Design/Builder's Designer, who shall be a professional engineer or architect currently licensed in Georgia under
Applicable Laws.
+ Design submittals shall be delivered in bound sets, indexed, and clearly marked to indicate the date of issuance and stage of development.
+ Specification Requirements: All Specifications shall be consistent with
Construction Specifications Institute (CSI) and comply with the Master Format
2020 of 49 Divisions.
+ The City of Atlanta Division 01 Specifications shall be utilized for this project.
These documents are included as Exhibit B.
+ Design Submittals:
1.5.2 Ten (10) hard copies and pdf copies of Drawings, Specifications, and other design submittals shall be provided for the preliminary, detailed and final design phases.
1.5.3 Design/Builder shall submit documents during the design phase that shall be sufficiently complete to:
1.5.3.1 Communicate to the City Representative the design intent.
1.5.3.1.1 Demonstrate compliance with all requirements of the
Contract Documents. Clearly define the Design/Builder's requirements for procurement and construction.
+ As a minimum, the Design/Builder shall prepare and submit the following:
1-6
1.5.4 Final building plans, sections, elevations, and details.
1.5.5 Site/Civil plans including finished grading.
1.5.6 Mechanical plans, sections, and details.
1.5.7 Electrical plans.
• Specifications.
• Electronic files of Drawings, Specifications, and test procedures. Each electronic file shall include an index of its contents.
+ In addition to the above submittals, Design/Builder shall submit updates to any documents submitted as part of its Proposal and incorporated into the Contract.
+ As part of each design submittal, review comments from previous Design
Submittal shall be submitted with actions taken to address comments clearly indicated.
+ If requested by the City or City Representative, Design/Builder shall submit an additional design submittal after submittal of Design documents and prior to submittal of Final Design Documents. Such submittal would consist of the latest version of Drawings and Specifications available at the time of request.
SECTION 2 DESIGN CRITERIA
DESICRITERIA SCR
Design Criteria Package 2-1 Design Build Chastain Park
2.0 Site Utilities
The proposed parking garage area is adjacent to the north and west of the new gymnasium expansion has existing underground water, gas, electrical, communications, sanitary sewer and storm sewer lines. There presently are overhead electrical, fiber optics and communications, storm sewer and lines located in the adjacent 40 feet wide right-of-way known as Chastain Park Avenue. There are two (2) existing fire hydrants located in the concrete sidewalk/trail on the south side of Chastain Park Avenue.
SECTION 3 D E S I G N C R I T E R I A
October 2026 3-1 Parking Garage
3.0 DESIGN CRITERIA
3.1 General Site/Civil Design Criteria
3.1.1 Detailed Field Surveys
Field surveying and existing topography shall be obtained by the Design/Builder. If any additional information is required, the Design/Builder shall be responsible for obtaining it.
The Design/Builder shall follow these guidelines:
+ All new field survey data shall be entered in the survey and mapping electronic database.
+ Each new survey shall be assigned a separate file designation so new data can be attached to original electronic files.
+ All final record drawings of utilities and facilities shall be provided after construction has been completed.
3.1.2 Horizontal and Vertical Coordinate System
All new construction on City facilities shall be tied to the Georgia State Plane
Coordinates System, North Zone (NAD 83 - 90). Vertical controls shall be referenced to
NAVD 1988. Permanent horizontal and vertical controls shall be identified and used in the construction phase.
3.1.3 Design Documentation
3.1.3.1 Site Drawing Organization
The site plans shall be organized as follows:
1. Drawings shall be parallel or perpendicular to the grid system.
2. Unless otherwise specified, the drawing scale for site plans shall be 1"=50' (or larger) with common match lines as required, with 1"=20" for individual sheets to short grade lines.
Site drawings for individual projects shall be organized as follows:
1. Existing conditions.
2. Demolition plans.
3. Finished grading/vertical control plans (Grading and drainage plans):
• Existing contours.
October 2026 3-2 Parking Garage
• Finished grade contours and spot elevations.
• Storm drainage system, profiles and details
4. Erosion and sediment control plans.
5. Temporary facilities during construction:
6. Landscaping and Tree Protection plans.
3.1.3.2 Typical Construction Details
Typical construction details shall be developed for the site improvements.
3.1.3.3 Existing and New Geotechnical Data, Soil Borings, and Explorations
The Design/Builder shall be responsible for interpreting all geotechnical data and performing any additional studies to satisfy their requirements.
3.1.3.4 Site Utilization and Construction Staging Plan
Design/Builder's Work shall not create unnecessary blockage of traffic; shall not create a safety hazard; a n d shall not create a nuisance. City site location and facilities shall be as-is. Based upon its review of the available, site investigations, investigations and other inquiries made by Design/Builder, which the Design/Builder acknowledges to be sufficient for this purpose, the Design-Builder assumes the risk and understands the existing, "as-is" conditions of the s i t e , as such conditions may affect and impact the ability of the Design/Builder to comply with Applicable Laws in the provision of Work described under the Agreement. The Design/Builder agrees that any latent or patent defect, flaw, error, inoperability, inadequacy or other condition that exists as of the execution of this Agreement or that may be revealed during the Term of the Agreement shall not relieve Design/Builder from performing its obligations under this Agreement.
The Design/Builder prepares the site utilization plan. This drawing indicates authorized staging and laydown areas for the project. Examples of construction support activities shown on this drawing include access roads to the construction site; utilities such as power, water, sanitary, and telephone hookups; transportation logistics; and other common services required to support the construction activity.
A final site survey of the proposed site shall be produced by the Design/Builder Team with coordinates. If additional area is needed for staging, the Design/Builder firm shall identify how much additional area shall be needed. There may be other areas available adjacent to the site; however, additional area may be provided at the discretion of the City.
3.1.4 Demolition Plans
The drawing scale for demolition plans shall be 1”=50’ or larger. Demolition of facilities and improvements shall address the following:
October 2026 3-3 Parking Garage
1. Verify existing facility information. Confirm that layout is correct, complete, and up to date.
2. Determine allowable methods of demolition.
3. Identify the limits of demolition requirements, and delineate areas of demolition (e.g., buildings, pavement, and utilities). A separate drawing is required for delineating buried structures and utilities located below surface structure or utilities.
4. Identify the disposition of salvageable materials and equipment.
5. Evaluate the condition of structure, site, and equipment remaining after demolition. The Design/Builder shall delineate areas for disposal or clearly define which materials are to be disposed of, those that shall be removed from the site and disposed of elsewhere, and those that shall be retained by the City, if applicable.
6. Identify buried structures and utilities that will be abandoned in place or plugged and tilled.
7. Indicate the extent of facilities that will be removed or remain, and the facilities that will be protected.
8. Determine environmental safety issues.
3.1.5 Outside Piping Plans, Profiles, and Sections
The drawing scale for outside piping (site utilities) plans shall be 1"=50'. The
Design/Builder must not show contours on this sheet. If additional detail is necessary, the Design/Builder shall use a scale of 1:10. Show the proposed storm drainage system on the grading plans only. The storm drainage system may be depicted in a shaded/ghosted manner to aid in the avoidance of utility conflicts, if applicable.
The outside piping (site utilities) plans, profiles, and sections shall clearly show the following:
1. All grade changes.
2. Coordinates for all manholes, stubs, branches, fittings and interfaces.
3. Invert elevations of all gravity lines and centerline elevations of all non-gravity lines.
4. Elevations of gravity and non-gravity l i n e s at buildings, structures, and interfaces.
5. Each line size, material type, system designation and direction of flow, where applicable.
6. Buried piping and conduits to the outside face of the building or structure.
7. Pipe interfaces with existing utilities.
October 2026 3-4 Parking Garage
3.1.5.1 Storm Drainage Design and Analysis
Design Storm Runoff Determination. The Design/Builder shall comply with the City of Atlanta Department of Watershed Management and applicable City Land
Development Regulations. Stormwater runoff "Qs" shall be determined by using the
Rational Method. The Design/Builder shall follow the Georgia Stormwater
Management Manual (latest edition) for runoff coefficients.
3.1.5.2 Rainfall Duration/Intensities
Design storm rainfall intensities shall be determined from the Rainfall Intensity-
Duration- Frequency Curves for Georgia (US Weather Bureau, latest edition). Times of concentration (T,) shall be considered for both overland and pipe flow in determining intensities for calculating design Qs.
3.1.5.3 Design Storm Events
The Design/Builder shall follow the Georgia Department of Watershed Management
Manual.
Location Frequency of Occurrence
Mainline pipes 25 years
Catch basins/curb inlets 25 years
Catch basins/curb inlet pipe connections 25 years
Roof-drain pipe connections 10 years
External areas draining through the site 100 years
Stormwater pumping systems 50 years
Areas subject to flooding without overland flow relief 100 years
3.1.5.4 Sanitary Sewers Design and Analysis
Sanitary sewers shall be designed in accordance with the Georgia Department of Natural
Resources EPD criteria.
All gravity pipelines shall be at least 8 inches in diameter and have manholes to grade.
Manholes shall be located at all changes in direction. In straight stretches of pipe, the distance between manholes shall be no more than 400 feet for sewers 15 inches or less, and
500 feet for sewers 18 inches to 30 inches in size, except that distances up to 600 feet may be approved in cases where adequate cleaning equipment for such spacing is provided. Smaller pressure lines shall have pressure cleanouts at grade. These cleanouts shall be spaced at appropriate intervals to allow access.
3.1.6 Traffic Maintenance and Signing Plans
The Design/Builder shall follow GDOT requirements in the preparation of the traffic maintenance and traffic signing plans.
October 2026 3-5 Parking Garage
3.1.7 Erosion and Sediment Control Plans
The Design/Builder shall fulfill all requirements for soil erosion and sediment control according to Georgia EPD rule criteria and Georgia Soil and Water Conservation
Specifications. All soil erosion and sediment control measures used in the Project shall be detailed in a separate drawing.
3.1.8 Landscape Plans
The Design/Builder shall comply with the Department of Parks & Recreation. On landscaping plans, indicate all proposed landforms, elevations, type of cover (i.e., trees, shrubs, and grasses), finished contours, roadways, sidewalks, and retaining walls. The
Design/Builder shall indicate the limit of work. All unpaved areas shall include topsoil and grass.
If additional detail is necessary to clarify the landscaping layout adjacent to buildings and structures, the Design/Builder shall coordinate with the Department of Parks &
Recreation.
3.2 General Architectural Design Criteria
3.2.1 Codes and Standards
All architectural design must conform to all state, city, and local codes, laws, ordinances, and zoning regulations and design guidelines as provided for by the City, and as mentioned herein.
The pertinent codes for building design are:
+ 2024 International Building Code with Georgia Amendments
+ 2024 International Mechanical Code with Georgia Amendments
+ 2024 International Plumbing Code with Georgia Amendments
+ 2024 International Fuel Gas Code with Georgia Amendments
+ 2015 International Energy Conservation Code with Georgia Supplements and Amendments
+ 2018 International Fire Code with Georgia Amendments
+ 2020 National Electrical Code with Georgia Amendments
The code data shall be located on the drawing with the first floor plan. The code data may be located elsewhere, provided a note is given on the first floor plan stating the location of the code data by drawing number.
3.2.1.1 Code Data
A code search shall be conducted for this Project, and the building code data shall be
October 2026 3-6 Parking Garage provided on the drawings. The code data shall be located on the drawing with the first floor plan. The code data may be located elsewhere, provided a note is given on the first floor plan stating the location of the code data by drawing number. The code data shall be as follows:
Building Code Data:
The buildings shall be designed to meet the requirements of the International
Building Code with Georgia Amendments (latest edition) and the following additional criteria:
Occupancy Group Classification:
List as appropriate, list each separate occupancy group required by the program
Type of Construction: List as appropriate Building Height: List as appropriate Height Limitation:
Total Floor Area: As calculated, list floor area for each identified occupancy Largest Floor Area: As calculated
Area Limitation: List as appropriate
Occupant Load: List number of total calculated occupants. Also list actual occupants as determined by program if appropriate
Fire Suppression System:
Fire Alarm System:
3.2.2 Building Architectural Requirements
Architectural Elements:
The architectural design standards shall provide design unity throughout the
Facility. The form or mass, shall be continuous, achieved through the use of scale, color, texture, material, and detail. The following design standards apply:
1. Design architectural elements with crisp, clean lines and reflect the scale proportions and contextual quality of modern architecture.
2. Use architectural building masses to screen the view of unenclosed service functions from public areas of the site.
3. The Design-Builder shall coordinate with Architectural-Landscaping requirements in this document.
Colors:
Exterior color shall provide continuity throughout the facility. Submit proposed color selections to City for review.
Materials:
October 2026 3-7 Parking Garage
These guidelines shall be followed for selecting materials:
1. Use steel or concrete as the general material for structural elements.
2. Concrete colors shall be integral to the material itself.
3. Use corrosive-resistant metals in architectural details, such as doors and windows frames, railings, fixtures, and other components.
Interior Room Finishes:
The following information shall provide guidance for the selection of interior finishes. The final finishes shall be determined in accordance to the specific building criteria.
1. To enhance brightness, interior surfaces shall be light-colored and reflective.
2. Provide a finish surface to all interior spaces; no surface area shall be left untreated, unless noted otherwise.
3. Use nonporous surfaces in wet areas.
4. Paint or seal exposed concrete surfaces as required.
5. Provide acoustical treatment in interior high-noise areas of buildings.
6. Final selection of interior finishes shall be subject to review by City.
3.2.2.1 Architectural-Site
Site coordination involves the following:
1. Develop the layout, circulation, and orientation for the Facility on the site.
2. Review the effects of grading and drainage on the structure, and coordinate the location of roof drainage.
3. Coordinate the location, elevation, and gradient of finish floor slabs, sidewalks, and entrance pads.
4. Coordinate the location of yard hydrants with the layout of yard piping, and the location of outdoor wall hydrants with site water needs.
5. Review site lighting and coordinate with requirements of Georgia Power Company.
6. Review location of grade mounted HVAC equipment
7. Review fire truck circulation.
3.2.2.2 Architectural-Landscaping
1. Landscaping coordination involves these steps:
October 2026 3-8 Parking Garage
• Coordinate landscaping and irrigation with site grading and drainage.
• Coordinate landscaping to prevent obstruction of door and window openings and consider the effects of heat and fumes from ventilation exhaust on the plantings.
• Coordinate landscaping to provide visual screening of items identified as objectionable.
3.2.2.3 Architectural-Structural
1. Verify concrete finishes and moisture proofing for walls and slabs;
coordinate location and type of construction, expansion, and control joints;
coordinate selection of form work and determine if it is compatible with the desired concrete finishes.
2. Establish railing material, type, and detail; determine if railing conforms to codes, accessibility and safety regulations.
3. Establish rise, run, material, and detail of all stairs; verify that the design conforms to codes, accessibility and safety regulations.
4. Coordinate clear room height requirements and ceiling finishes.
5. Coordinate size, detail, and location of all floor, wall, and roof openings.
6. Establish roof and floor slopes and floor-drain elevations for proper drainage;
verify need for sloping structure or topping material; Verify need for depressed slab areas.
7. Coordinate selection of roof framing system.
8. Review framing schemes for column locations and size, beam clearances, and their effects on the work of other disciplines.
9. Establish requirements for insulation, vapor retarders, damp proofing, and waterproofing.
10 Establish requirements for termite resistant construction.
3.2.2.4 Architectural-Mechanical
1. Coordinate "U"-factor requirements for walls, fenestration, floors and roof.
(U-factors must meet energy code requirements.)
2. Select, coordinate, and detail insulation materials.
3. Coordinate size, location, and types of wall louvers; coordinate required roof penetrations. Coordinate and determine final size, location, and numbers of wall
October 2026 3-9 Parking Garage louvers. Schedule louvers.
4. Verify and coordinate plumbing fixture count, type, layout, and location per
Georgia Building Code. Determine and provide plumbing chases.
5. Verify the location of all floor and roof drains.
6. Coordinate size, detail, and location of all floor, wall, and roof openings.
7. Provide up-to-date background floor plans and building sections for use by the designers of heating, ventilation, and air conditioning (HVAC).
8. Coordinate spatial requirements for HVAC, Plumbing and Fire Sprinkler systems in the floor plans.
9. Coordinate roof drainage gutter downspout locations with wall penetrations for HVAC and plumbing.
10. Review air diffuser and grille selection and placement for compatibility with ceiling system.
11. Coordinate NFPA requirements by room and area within each building and structure. Identify fire resistant construction on the plans, and coordinate fire suppression system requirements.
3.2.2.5 Architectural-Electrical
1. Review light fixture selection, and coordinate layout and compatibility with ceiling system and air diffusers and grilles.
2. Coordinate exterior, wall mounted, and special accent site lighting.
3. Provide up-to-date background floor plans for electrical designers' use.
4. Coordinate size, detail, and location of all but small conduit, floor, wall, and roof openings. Conduit shall not be routed in reinforced masonry cells.
5. Verify size, location, and access requirements for all motor control centers, panels, and A&C equipment; ensure that equipment shall fit through openings provided and at locations shown.
6. Coordinate NFPA requirements by room and area.
3.2.2.6 Architectural-Corrosion Control
1. Verify types of exposed metals and painted finishes to be used to resist corrosion. Each environment has its own requirements.
2. Coordinate special chemical resistant coatings for chemical storage.
3.2.3 Life-Cycle Cost Effectiveness
October 2026 3-10 Parking Garage
Materials shall be chosen on the basis of long-term performance, not short-term cost. The following factors shall be considered when selecting materials:
1. Life expectancy
2. Suitability
3. Durability
4. Ease of maintenance
5. Compatibility with substrate materials
6. Effect on other disciplines
Each of these factors shall be rated to achieve the maximum life-cycle cost effectiveness.
3.2.4 Maintenance
This section provides information to decrease material variations and to enhance maintenance servicing. Common building features shall include:
1. Door hardware
2. Coating systems
3. Waterproofing systems
4. Luminaries
3.2.5 Accessible Parking Requirements
Provide accessible parking spaces per 2010 Standards for Accessible Design, Table 203.2
Parking Spaces. All accessible spaces shall be eight (8) feet wide with either a five (5) feet or eight (8) wide access aisle. All accessible spaces and access aisles shall not exceed a running or cross slope greater than 1:50 (2%).
All accessible spaces must have an accessible route to public streets or sidewalks and accessible elevators. It is recommended to cross hatch all accessible aisles and accessible routes.
3.2.6 Pedestrian Requirements
Provide safe, secure and well signed pedestrian traffic paths throughout the parking structure.
Pedestrian access at the grade level should be separated from vehicular ingress and egress.
Place dedicated pedestrian aisles adjacent to vehicle entry/exit openings. Restrict access locations to increase security.
3.2.7 Parking Layout Efficiency
October 2026 3-11 Parking Garage
Parking efficiency shall be calculated considering the total parking structure non-parking structure size including stairs, elevators and non-parking ramps. Any retail space that is incorporated within the structure shall be included in the calculation. Maintain a range of
300-340 square feet per parking space. Non-parking speed ramps are discouraged.
3.2.8 Exterior Improvements
Provide site lighting, sidewalks, entry plaza/ramps, garden planting and seating areas in accordance with Parking Design Concepts prepared by TVS Architects dated October 30, 2024, Revised June 30, 2026. (Refer to Exhibit A-2).
3.2.9 Masonry
Utility, mechanical and elevator rooms shall be of concrete block masonry units. Joints on the exterior sides of these rooms shall be tooled both vertically and horizontally as concave joints. Masonry walls shall be grout filled to a height of 36" above the parking deck for impact resistance.
3.2.10 Metals
Provide and install any and all miscellaneous metal items including, but not limited to, all loose metals, lintels, bollards, pipe guards, miscellaneous angles and plates and other miscellaneous fasteners, anchors and inserts. ADA compliant galvanized steel tube railings and handrails shall be utilized.
Provide exterior louvers, where required, that match the finish of the windows and detailed to integrate with the architecture of the building, as appropriate to the design of the building.
3.2.11 Thermal & Moisture Protection
Caulk and seal joints with the appropriate backer material and caulk to provide a positive barrier against passage of moisture. Caulk color shall match the concrete color, both inside and outside if different, as closely as possible.
3.2.12 Openings
Provide 18 gauge hollow metal doors and hollow metal frames, fire rated as required by
Code, complete with panic hardware and vision glazing at all stairwell and machine room doors. Frames shall be grout filled and secured to the surrounding structure for maximum durability.
At the top deck, provide a rain protected lobby incorporated into the structure. A storefront enclosed lobby would be a desirable feature.
All hardware shall be US32D - Dull Stainless, commercial heavy duty and lock sets shall be Best with interchangeable cores.
3.2.13 Interior Finishes
October 2026 3-12 Parking Garage
Flooring in all areas shall be concrete, broom finished as appropriate to a garage.
All non-galvanized miscellaneous metal shall be primed with an appropriate primer and painted with a standard color finish coat to match the color scheme of the garage.
All fire lines will be painted red or the color required by local code.
All field applied paint will be single coat epoxy or urethane with a minimum of 3 mils dry film thickness. Provide (2) coats of primer / sealer to all concrete and exposed masonry.
Layout and stripe all parking stalls, provide handicap signs, stripe all islands and install concrete wheel stops for all stalls.
Provide field applied high performance exterior coatings for all items that are not prefinished and to prefinished items when required to provide a color other than a standard prefinished color.
3.2.14 Overhead Coiling Doors
If required, use aluminum, non-insulated overhead coiling doors with a powder coated finish. The minimum clearance shall be 12 inches on each side of the door and 24 inches above the door. Bollards or angles shall be used to protect jambs and door tracks from vehicular damage.
3.2.15 Stairs
Provide a minimum of two (2) stairs to meet Code-required means of egress for fire exits. It is recommended that stairs are open or glass enclosed for security.
Interior stairs shall be constructed of steel with concrete filled pans precast-in-place concrete. All stairways must be a minimum of 3 feet 8 inches wide. Handrails may project no more than 3-1/2 inches into the stair width. Stair landings must be at least as wide as the stairway.
3.2.16 Signage & Wayfinding
Provide a well-designed graphics and signage system that will effectively communicate necessary information to patrons, reduce confusion, improve safety and enhance the overall user experience. Include wayfaring signs both inside and outside the facility to direct traffic to facility elevator lobby, entrances and exits.
3.2.17 Passenger Elevators
The elevator system shall be designed and installed per code. Elevators shall be located so as not to be subject to flooding.
Elevator cabs shall be constructed of satin stainless steel materials. It is highly recommended that elevators have glass backs for security. Enclosed lobbies are recommended for protection from the elements at the top level.
October 2026 3-13 Parking Garage
Elevators shall be 3,500 lb. Capacity and 5’-0” x 7’-0”.
All elevator design, permitting and inspection fees shall be included in the Lump Sum
Cost. Elevator cost in the Lump Sum Cost shall include a one-year maintenance and service agreement during the warranty period.
3.2.18 Parking Control Equipment
Provide a simplified Intelligent Parking System for the parking garage with information guidance display boards and ultrasonic detectors to gather vacancy information for guiding drivers to find vacant parking spaces. All conduits, wiring, and other equipment needed to make a complete and operable system shall be included in the Lump Sum Cost.
Entrance controllers shall be capable of issuing timed parking entrance passes or operating by proximity card reader.
Payment kiosks shall be on each floor of the garage in the area of the elevators and stairwells. Payment kiosks shall be capable of accepting cash, credit/debit cards or tokens. Payment kiosks will issue timed exit tokens after insertion of the parking pass and payment of the fee or of a validated parking pass. Payment kiosks shall be networked to allow for real time accounting.
Exit controllers shall be capable of operating by payment of timed exit token or by proximity card reader.
3.2.19 Fire Suppression System
The parking garage shall incorporate a complete fire suppression system meeting code requirements for this type of facility. The City’s preference would be a non-sprinkled system consisting of a dry standpipe system with an FDC on each floor.
Provide Fire Department Connections (FDC's) outside the garage as required by Code.
Provide wall mounted fire extinguishers in secure cabinets.
All design, permitting and inspection fees for the fire suppression system shall be included in the Lump Sum Cost.
3.2.20 HVAC System
The facility shall be designed to meet natural ventilation requirements in accordance with the applicable code. If necessary, utility and elevator rooms may be cooled by independent split systems with exterior compressors.
3.2.21 Plumbing System
Provide a complete plumbing system including sanitary and storm risers, drains and piping for all roof levels and parking levels and potable water supply to all fixtures and to hose bibbs at each parking level.
October 2026 3-14 Parking Garage
3.2.22 Electrical System
Provide complete electrical system to include all conductors, conduits, wiring devices, surge suppression and power per Code.
The parking garage shall incorporate lightning protection and grounding systems.
All fixtures in the parking garage shall be LED's controlled by day light sensors.
All Site Lighting shall be provided by the Design/Builder in coordination with Georgia
Power Company.
3.2.23 Communications
Provide Ring Down Emergency Telephones at each payment kiosk.
3.2.24 Electronic & Security System
Provide an interior and exterior CCTV system for visual assessment and archiving of parking garage and all perimeter doors of the Facility. Features shall include interface with COA monitoring for control of camera call-up to video monitors and digital video archiving.
The parking garage shall incorporate complete stand-alone fire detection and alarm systems meeting code requirements for this type of facility.
3.2.25 Noise Abatement/Mitigation Plans
Provide and plan for temporary noise abatement/mitigation measures during the construction.
3.2.26 Electric Vehicle (EV) Charging Stations
Provide EV charging stations in accordance with the City of Atlanta Ordnance 17-O-1654.
3.3 General Structural Design Criteria
3.3.1 Purpose and Content
This section describes the minimum structural engineering design criteria for the Chastain
Park Parking Garage. Included in the criteria are required design loads for buildings, miscellaneous structures, and components. Also included are analysis and design methodologies for various materials of construction including concrete (cast-in-place and precast), steel, masonry, aluminum, fiberglass, and stainless steel. Additionally included are minimum material properties and cast-in-place concrete properties and installation requirements.
In case of this document's overlap and conflict with governing codes and standards, the
Design/Builder will follow the more strict interpretation or directive. Similarly, where multiple reference standards are cited, the most stringent requirements shall govern.
October 2026 3-15 Parking Garage
3.3.2 Applicable Codes, Standards, and References
The design codes, standards and references listed below shall serve as the basis for design for building and non-building structures, including all lateral force resisting systems, components, and claddings:
+ International Building Code (IBC), 2024 Edition with Georgia Amendments
+ ACI 318-11: Building Code Requirements for Reinforced Concrete.
+ ACI 350-06: Code Requirements for Environmental Engineering Concrete Structures and Commentary ACI 350R-06.
+ ACI 350.4R-04: Design Considerations for Environmental Engineering Concrete Structures.
+ ACI 350.3-06: Seismic Design of Liquid Containing Structures and Commentary ACI 350.3R-06ACI 530-11: Building Code Requirements for Masonry Structures.
+ ADM 1-10: Aluminum Association Design Manual Specification for Aluminum Structures, 2010 Edition.
+ AISC Manual of Steel Construction, 14th Edition.
+ ASCE 7-10: Minimum Design Loads for Buildings and Structures.
3.3.3 Guidelines and Procedures
All structural engineering shall be done in accordance with this DC and applicable codes, specifications, and standards, as well as to reflect the judgment and experience of the responsible professional engineer. Designers will use the guidelines contained herein unless there is an overriding reason not to use them for particular components of the Project. In that event, documentation must be provided in the calculations or by separate memorandum and reviewed by the City.
3.3.4 Loads
3.3.4.1 General
Loads to be considered shall include both lateral and vertical loads. Lateral loads are imposed by wind, seismic, soil and liquid pressures, and surcharge loads adjacent to walls.
Vertical loads include dead loads, live loads, snow load, suction and uplift loads imposed by wind, and uplift loads imposed by flood or groundwater. Equipment, large piping, and pipe thrust loads shall be accurately determined and incorporated into the structural design.
The following loads will be used for structural analysis of floor and roof systems in addition to any loading required by the building code:
1. Roof snow loads.
October 2026 3-16 Parking Garage
2. Roof dead loads.
3. Roof wind
4. Dead and Live Loads
For dead load, include all permanent or semi-permanent loads. This includes equipment, piping, banks of conduit, electrical trays, floors, supporting members, walls, partitions, chemicals in bins or on storage floors, and liquid contents of piping, containers, and equipment. Dead load also includes weight of soil on soil-covered roofs, if applicable.
Live loads include all loads not defined as dead loads including people, tools, and equipment that may be placed on floors temporarily. Live loads need not be applied to floor areas permanently covered by equipment, unless the live load is higher than the equipment load. Reduction of live loads may be considered only as permitted in the Building Code.
• Wind and Seismic Loads
Refer to the Building Code for complete deviation of loads. A summary of wind and seismic design information shall be clearly presented on the structural drawings, including basic wind speed, wind importance factor and building category, wind exposure, building enclosure classification and internal pressure coefficient, and a summary of design component/cladding wind pressures.
3.3.5 Foundations
A Report of Subsurface Exploration and Preliminary Geotechnical Engineering Evaluation are included in other portions of this RFP. Any included subsurface information is only for the Design/Builder’s information and is not guaranteed to fully represent all subsurface conditions. The Design/Builder is required to retain a Geotechnical Engineer experienced and licensed in Georgia to interpret the information provided as related to his design concept and develop geotechnical requirements to support design and construction.
Foundation must be designed to suit subsurface conditions and must be capable of transmitting all building loads to the ground.
3.3.6 Slab on Grade
As determined by the Design/Builder’s Designer of Record to be applicable, provide a standard or structurally supported concrete slab on grade. Where slab on grade is below the existing adjacent exterior grade, provide water/dampproofing and a perimeter drainage system to remove ground water from the area immediately adjacent to the building.
3.3.7 Floor Construction
The floor construction shall include any structural framing system meeting the requirements of the section.
3.3.8 Roof Construction
The roof construction shall include any structural framing system meeting the requirements
October 2026 3-17 Parking Garage of this section.
3.4 General Building Mechanical Service Design Criteria
3.4.1 General
All design must conform to the local building codes, including the 2024 edition of the
International Building Code with GA Amendments and all other codes and standards as contained therein.
3.4.2 HVAC
3.4.2.1 HVAC Systems Functions
The HVAC system shall perform the follow functions:
1. Protect equipment and piping from overheating or freezing.
2. Provide uninterruptible operation of cooling equipment for electrical through adequate redundant systems.
3.4.2.2 General HVAC Drawing Criteria
In addition to the HVAC design criteria, the following requirements shall apply to
HVAC drawings:
1. Ensure the minimum scale for ductwork and piping plans is 1/8 inch = 1 foot for congested areas and equipment rooms; the partial plans shall have a scale of 1-1/4 inch= 1 foot.
2. Provide sections and elevations for all major equipment and multiple layers of piping or ductwork. Sections and elevations shall have a scale of 1-1/4 inch =
1 foot.
1. Indicate the airflow through the various rooms and duct systems on an air-balance diagram as part of the construction documents.
2. In addition, the following shall be p r o v i d e d where applicable:
• Standard construction detail sheets.
• Demolition drawings of all existing equipment to be removed.
Automatic temperature-control systems descriptions and sequence of operation.
The air balance diagrams shall, as a minimum, show the following:
October 2026 3-18 Parking Garage
1. Each space with space identification.
2. Ventilation air flow in cubic feet per minute (cfm) for each space, with supply, exhaust and transfer identified.
3. Ventilation rate in air changes per hour and design basis.
4. Infiltration or exfiltration rate in cfm.
5. Positive or negative pressurization criteria.
6. All ductwork, fans and air handlers.
7. Fan and air handler identification numbers (IDs).
8. Fan and air handler capacities in cfm.
9. Duct air flows in cfm.
10. Pressure…