PKAA, Dream Canyon Project

Closed State & local contract opportunity Posted

Solicitation number
DQ1 PKAA 2026000355 3
State
Colorado
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes
Point of contact

Updated .

About this opportunity

The State of Colorado Department of Natural Resources, Division of Reclamation, Mining and Safety, is soliciting documented quotations for the Dream Canyon Project, a mine closure initiative located in the Sugarloaf District of Boulder County, Colorado. This project involves comprehensive safeguarding of hazardous mine features through various closure methodologies applied to privately owned properties, including machine backfill operations, installation of corrugated steel pipe, rock bulkhead placement, grating systems with bat cupolas, rock fill placement, shaft footers, and site revegetation. The bid schedule encompasses nine line items covering mobilization and demobilization (1 job), project safety and environmental planning (1 job), sediment control (300 linear feet), mine closure installations across 20 identified features (including shafts, stopes, and adits), and optional work items such as imported rockfill, imported fill materials, grating, shaft footers, equipment rental, and road base improvements. Contractors must provide comprehensive project safety, health, and environmental action plans addressing fall protection systems, White-Nose Syndrome decontamination protocols for bat-affected sites, OSHA compliance, noxious weed mitigation, and stormwater sediment control measures. A mandatory pre-bid meeting and site inspection was held on April 16, 2026, at 10:00 a.m. MT at the Dream Canyon Hiking Trail Parking area; written inquiries were due by 4:00 p.m. MT on April 20, 2026, with electronic bid submissions required via Colorado Vendor Self Service by 4:00 p.m. MT on May 5, 2026, and bid opening scheduled for May 6, 2026. The project construction period spans June 3, 2026, through August 1, 2026, with a completion timeline of sixty calendar days following the Notice to Proceed, including ten calendar days for mobilization. Bidders must submit a List of Equipment Offered form detailing all equipment to be used and acknowledge receipt of all addenda, including Amendment No. 1 (issued April 17, 2026) and Amendment No. 2 (issued April 24, 2026), with the revised bid schedule reflecting modifications to eight feature specifications and deletion of one feature from the original scope.

Service-Disabled Veteran Owned Small Businesses certified through the U.S. Small Business Administration are eligible to receive a 5 percent price preference on this procurement. Bids exceeding $150,000 require performance and labor/material bonds at 100 percent of contract value, with 5 percent retainage withheld until project completion. The Build America, Buy America Act applies to all iron, steel, manufactured products, and construction materials, which must be produced in the United States unless subject to an approved waiver. Davis-Bacon prevailing wage requirements apply with mandatory certified weekly payroll reporting. The project is funded through federal funds from the Department of the Interior/Office of Surface Mining Reclamation and Enforcement under Assistance Listing Number 15.252 and Colorado Severance Tax. No specific maximum contract value or budget range is explicitly stated in the solicitation documents; however, the requirement for performance and labor/material bonds at 100 percent of contract value indicates the anticipated award may exceed $150,000. Contractors must comply with all state and federal environmental regulations, provide contractor-supplied rescue standby teams as appropriate, coordinate with Boulder County regarding weight restrictions on county roads, and plan for standard single-axle dump truck material deliveries.

Files

Show all 13

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity