Parks Backflow, Master Valve, and Hydrometer Installation

Closed State & local contract opportunity Posted

Solicitation number
WVC Parks 25-05
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

West Valley City is seeking qualified contractors for a Parks Backflow, Master Valve, and Hydrometer Installation Project (WVC-PR-PM003) in Salt Lake County, Utah. The procurement involves replacing or repositioning backflow prevention devices, master valves, and hydrometers across 10 municipal parks, including Country Meadows, Parkway, Scottsdale, Z-Park, West View, Centennial, Hunter Ridge, Bridal Farms, Woodledge, and Hillsdale Parks. Specific technical requirements include installing equipment such as Leemco restraint fittings, quick coupler assemblies, protective cages with concrete pads, and appropriate wiring to controllers at depths ranging from 1 inch to 8 feet 6 inches. The evaluation criteria will be weighted as follows: Price (40%), Adherence to Specifications and Service (30%), Quality of Product (10%), Warranty (10%), and Work Timeline (10%). Proposals are due by 10:00 AM on December 22, 2025, and must be submitted exclusively through Utah Bonfire at https://utah.bonfirehub.com, with questions to be submitted by 10:00 AM on December 18, 2025.

Contractors must provide local references, warranty information, valid business licenses, and proof of insurance coverage, including commercial general liability with $3,000,000 per-occurrence and $5,000,000 aggregate limits, commercial auto liability with $2,000,000 per-occurrence limits, and employer liability coverage of $2,000,000. Performance and payment bonds equal to 100% of the guaranteed maximum price are required, with West Valley City named as the third-party obligee. The city offers a 1% bidding preference for contractors physically located within city limits, with an additional 1% preference available for businesses meeting criteria such as veteran hiring programs, active safety training, drug testing protocols, job training programs, health insurance for full-time employees, and nondiscrimination policies. While no specific award value or budget range is explicitly stated, the comprehensive technical specifications and insurance requirements suggest a significant infrastructure investment. The project is scheduled to be completed between November and March, with all systems requiring pressurization and inspection prior to final installation.

Opportunity text

WEST VALLEY CITY REQUEST FOR PROPOSAL This request for proposals ("RFPs") seeks qualified providers for Parks Backflow, Master Valve, and Hydrometer Installation for West Valley City, Utah. Details and specifications are distributed through www.utah.bonfirehub.com or can be obtained from Dustin Bushnell at dustin.bushnell@wvc-ut.gov Questions regarding the RFP should be to Dustin as listed above. Opening/due date shall be December 22, 2025 at 10:00 p.m. local prevailing time, as conclusively established by Bonfire.com. No public opening will be held. Results will be made available on the City Website. Proposals must comply with the requirements of the full Request for Proposals to be considered. The right to reject any or all proposals and to waive any or all defects is reserved. Dated this 9thth day of December 2025 NICHOLE CAMAC, CITY RECORDER

Files

File Type Posted
3-2025 RFP Appendix C - Bid Form.xlsx XLSX spreadsheet
1-RFP for RPs Fall 2025.docx DOCX document
4-2025 Appendix B - Property and RP Pictures.pdf PDF
2-Fall 2025 Appendix A - Specifications.xlsx XLSX spreadsheet

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity