Big Bend Habitat Restoration 2026 Phase
Open State & local contract opportunity Posted
- Solicitation number
- WJPS27112301
- State
- Utah
- Responses due
Opportunity facts
- NIGP codes
- 959 Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- 54551 Oil And Gas Machinery And Equipment (Drilling Rigs, Etc.)
- 96892 Water Supply Plant Operating And Monitoring System Services (Including Water Resources Development And Water Quality Management Services)
- 90976 Site Work
- 91315 Construction, Canal Or Aquaduct
- 95966 Reservoir Maintenance And Management Services
- 95939 Dam And Levee Construction, Maintenance, Management And Repair
- 95990 Waterfront Construction Services Including Piers, Docks, Decking, Etc. (Includes Maintenance And Repair)
- UNSPSC codes
- 72141102 Land grading service
- 72141209 Levee construction service
- 72141119 Aqueduct construction service
- 20141706 Marine and offshore installations
- 72141200 Marine construction services
- 72141202 Canal construction service
- 72141203 Dam construction service
- 72141207 Harbor construction service
- 72141212 Pond construction service
- 70171505 River basin development
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The City of West Jordan, Utah, through its Public Works Department, is soliciting sealed bids for the Big Bend Habitat Restoration 2026 Phase, a Jordan River habitat restoration construction contract, with bids due December 29, 2026 at 2:00 p.m. Mountain Time through the Utah Public Procurement Place. Bidders must hold a valid Utah E-100 General Contractor License at the time of award, and bidders must show three completed projects within the last five years involving temporary diversion structures, best management practices for equipment in open waters, in-channel boulder placement, and riparian or wetland vegetation restoration. No disadvantaged-business set-aside is indicated.
Work sits along the Jordan River north of 9000 South between approximately 825 West and 8400–8800 South. Scope includes general activities, water care, floodplain and meandering channel grading, landscape and pond trail grading, stockpiling, chain-link fence removal, post-and-wire fence installation, seeding and planting, irrigation and pump system installation, and pumphouse construction. The 94-line-item bid schedule includes a base bid and four add-alternates covering spray-zone irrigation and plantings (Zones A/B, C, and D) and miscellaneous landscape, irrigation, and pump items. Representative quantities include 47,552 cubic yards of general excavation and grading, 41,004 plug plantings, and 2,172 linear feet of irrigation mainline. The project is structured as a lump-sum bid with separate totals for the base bid and each add-alternate, and the source also references unit-price bidding.
Performance and payment bonds are required within a $2 million to $2.85 million range. Substantial completion is due November 30, 2027, with no work permitted after December 31, 2027. Liquidated damages run on a sliding daily scale from $560 for contracts up to $100,000 to $2,430 for contracts from $1,000,000 to $5,000,000. Insurance documentation must name the City as additional insured for ongoing and completed operations and include waiver of subrogation endorsements, with carriers verified through AM Best ratings. Bids remain open for 90 calendar days from opening. The City may reject any or all bids and will award to the lowest responsive and responsible bidder.
A non-mandatory pre-bid conference is set for December 10, 2026 at 11:00 a.m. at the Jordan River Trailhead, 8607 Millrace Bend Road, West Jordan. Contract documents were prepared by RiverRestoration.org LLC and reviewed by City staff. Proposals claiming confidentiality must designate protected sections under Utah's Government Records Access and Management Act (GRAMA).
Opportunity text
Work under this Contract generally includes, but is not limited to the construction of the following: General Activities, Care of Water, Grading of Floodplain and Meandering Channel, Grading of Landscape, Grading of Pond Trails, Stockpiling, Chain link Fence Removal, Placement of Post-and-Wire Fence, Seeding and Planting, Installation of Irrigation and Pump System, Installation of Pumphouse, and all appurtenant work in accordance with the Drawings and Specifications.
Files
| File | Type | Posted |
|---|---|---|
| 1-COI Guide for Contractors.pdf | ||
| 4-WJPS27112301 Big Bend Habitat Restoration.pdf | ||
| 2-PROTECTED INFORMATION REQUEST FORM.docx | DOCX document | |
| 3-WJPS27112301 Big Bend Bid Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity