This file contains specifications for Parks Backflow, Master Valve, and Hydrometer Installation projects for West Valley City, Utah. The scope of work encompasses installation of backflow prevention devices, master valves, hydro meters, and related components across 13 park locations within the city. The specifications detail equipment requirements including cage and concrete base installations, drain quick couplers with ball valves, isolation valves, master valves with wired hydro meters and flow sensors, and shielded wiring connections to controllers. Specific installations vary by location, with depths ranging from 1 inch to 8 feet 6 inches and configurations designated as either Double Check (DC) backflow preventers in vaults or Reduced Pressure (RP) backflow preventers in vaults. The Request for Proposal deadline is December 22, 2025, at 10:00 p.m. local time, with submissions required through the Utah Bonfire Hub portal. No public opening will be held, and results will be posted on the City Website.
Key technical requirements include use of Leemco restraint fittings on mainlines 2 inches and larger to prevent thrust blocks, installation of quick couplers after the master valve, and attachment of all cages to concrete bases at ground level. All work must be inspected prior to burying under pressurized system conditions, potentially scheduled for spring due to weather considerations. Shielded wiring for hydro meters, flow sensors, and master valves must be run and installed to the controller with testing to verify proper operation. The contractor is responsible for repairs of any damage caused during project execution. Inquiries regarding the RFP should be directed to Dustin Bushnell at dustin.bushnell@wvc-ut.gov. West Valley City reserves the right to reject any or all proposals and waive any defects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-2025 Appendix B - Property and RP Pictures.pdf | ||
| 3-2025 RFP Appendix C - Bid Form.xlsx | XLSX spreadsheet | |
| 1-RFP for RPs Fall 2025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2 Appendix A - Specifications
| # | Property: | W.Distr: | Type: | Depth: | Size: | Cage w/ Concrete Base: | M.L. Drain | Quick Coupler w/ ball Valve | S&W | Iso. Vlv. | Mstr. Vlv. and Wire | Hydromtr. and Shielded Wire | Flow Snsr. and Shielded Wire | Address: |
| 1 | Country Meadows Park | G.H. | DC | 5' | 4" | X | X | X | X | X | 4155 West 3980 South | |||
| 2 | Parkway Park | G.H. | DC | 6' | 4" | X | X | X | X | X | 3405 West Parkway Blvd. | |||
| 3 | Scottsdale Park (East) | G.H. | DC | 2" | X | X | X | X | X | X | 3100 South 3690 West | |||
| 4 | Scottsdale Park (West) | G.H. | RP | 3" | X | X | X | X | X | X | 3745 West 3100 South | |||
| 5 | Z-Park | G.H. | DC | 4.5' | 3" | X | X | X | X | X | X | 6898 W. Hunter Valley Dr. (3130 S.) | ||
| 6 | Westview Park | G.H. | DC | 2" | X | X | X | X | X | X | 6036 W. 4100 S. | |||
| 7 | Centennial Park (East) | G.H. | DC | 6' | 6" | X | X | X | X | 5405 W. 3100 S. | ||||
| 8 | Centennial Park (West) | G.H. | DC | 8' | 6" | X | X | X | X | 5405 W. 3100 S. | ||||
| 9 | Hunter Ridge Park | G.H. | DC | 2" | X | X | X | X | X | X | 5694 W. Hunter Hollow Cr.(4383 S.) | |||
| 10 | Bridal Farms Park (South) | G.H. | DC | 1" | x | x | x | x | x | x | ||||
| 11 | Bridal Farms Park (North) | G.H. | DC | 1.5" | X | X | X | X | X | X | ||||
| 12 | Woodledge Park | G.H. | DC | 3" | X | X | X | X | X | X | ||||
| 13 | Hillsdale Park | G.H. | DC | 4" | X | X | X | X | X | |||||
| Yellow = DC Backflow Preventer in Vault | ||||||||||||||
| Blue = RP Backflow Preventer in Vault | ||||||||||||||
| Green = DC Backflow Preventer in Valve Boxe | ||||||||||||||
| Orange = DC Backflow Above Ground | ||||||||||||||
| Note: | Shielded wiring of hydrometers/flow sensors and wiring of master valves ran and installed to the controller as required. (Test hydrometer/flow sensor/master valve to assure they are working properly) | |||||||||||||
| Use of Leemco restraint fittings on mainlines 2 inches and up, where 90s, tees, and 45 degree fittings are used to prevent the need for thrust blocks. | ||||||||||||||
| Quick Coupler assemble to be installed after the master valve. | ||||||||||||||
| Cages must be attached to a concrete base at ground level below the RP. | ||||||||||||||
| All work must be inspected prior to burying, with a pressurized system, which may need to be in the spring due to weather. | ||||||||||||||
| Repairs of any damage that may caused as a result of this project. |