Ontario Maintenance Station New Evaporation Pond Liner
Closed State & local contract opportunity Posted
- Solicitation number
- S-73000-00011205
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- Points of contact
-
- Dave Dethloff william.d.dethloff@odot.oregon.gov (503) 569-8793
- Jose Franco Ramos odotfacbranchinvoices@odot.oregon.gov (503) 986-5777
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Oregon Department of Transportation (ODOT) is seeking a contractor for the Ontario Maintenance Station New Evaporation Pond Liner project located in Malheur County, Oregon. The procurement is a public works project involving the installation of a new geotextile layer and pond liner in a previously prepared pond, including liner edge termination trench excavation and backfill, and modification of an existing manhole. Key deliverables include heat-welded liner panel installation, coordination of suppliers and subcontractors, maintaining a clean worksite, securing necessary permits, and scheduling special inspections. The project has a required Substantial Completion date of October 1, 2024, and a Final Completion date of October 15, 2024. A voluntary pre-bid conference was held on August 21, 2024, and bids must be submitted through the OregonBuys eProcurement system prior to the bid opening on September 3, 2024, at 10:30 AM. The contract will be awarded to the responsible bidder submitting the responsive bid with the lowest total bid price. Bidders must be licensed with the Oregon Construction Contractors Board and comply with state prevailing wage rate requirements.
No specific set-aside designations or restrictions for disadvantaged enterprises were identified in the procurement documents. The bid tabulation reveals two bidders: Realm Mining Inc. and Hamilton Excavation, with Realm Mining Inc. submitting the lowest bid of $65,900.00. The project's estimated budget appears to be within this range, though no explicit budget maximum was specified. No incumbent vendor information was provided, and the documents do not indicate requirements for integration with existing infrastructure or technology. Successful bidders will be required to furnish performance and payment bonds and provide product information for the geotextile sub-liner and pond liner prior to work commencement. At project completion, the contractor must submit marked-up record drawings and operations, maintenance, and warranty information to ODOT. Aggrieved bidders have 5 calendar days from the intent to award notice to file a protest.
Opportunity text
Project includes the installation of a new geotextile layer and pond liner in a previously prepared pond. Installation includes liner edge termination trench excavation and backfill. Project also includes modification of an existing manhole as shown on drawings. Refer to documents labelled Attachments A Plans and Attachment B Specifications for details. Documents can be found in the Attachments tab for this solicitation in OregonBuys.
Files
| File | Type | Posted |
|---|---|---|
| 00011205 Addendum 1.docx | DOCX document | |
| Attachment A Plans~1.pdf | ||
| ITB_PW_Final~8.docx | DOCX document | |
| 00011205 Preliminary Results~1.xlsx | XLSX spreadsheet | |
| Attachment B Specifications.docx | DOCX document | |
| 00011205 Addendum 2~1.docx | DOCX document | |
| 00011205 VoluntaryPreBidMeetingNotes.pdf | ||
| 00011205 Intent To Award.xlsx | XLSX spreadsheet | |
| 20252010_E1_Response_Log_and_Abstract.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity