00011205 Intent To Award.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Ontario Maintenance Station New Evaporation Pond Liner
Solicitation number
S-73000-00011205
Issued by
Malheur County, Oregon

About this file

This document is an Intent to Award notice from the Oregon Department of Transportation (ODOT) for the Ontario Maintenance Station New Evaporation Pond Liner project. The project includes the installation of a new geotextile layer and pond liner in a previously prepared pond, as well as modifications to an existing manhole. The project has an estimated quantity of 1 unit. The bid closing date is 09/03/2024 at 10:30 AM. ODOT intends to award the contract to Realm Mining Inc.

The bid tabulation shows the unit prices and total prices submitted by Realm Mining Inc. and Hamilton Excavation. Realm Mining Inc. submitted the lowest bid of $65,900.00 for the project. Aggrieved bidders have 5 calendar days from the date of the notice to protest the intent to award.

View the file

Other files

File Type Posted
ITB_PW_Final~8.docx DOCX document
00011205 Addendum 1.docx DOCX document
00011205 Addendum 2~1.docx DOCX document
Attachment B Specifications.docx DOCX document
Attachment A Plans~1.pdf PDF
20252010_E1_Response_Log_and_Abstract.pdf PDF
00011205 VoluntaryPreBidMeetingNotes.pdf PDF
00011205 Preliminary Results~1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:9/3/24
ITB No.S-73000-00011205BIDDER
NAME:Realm Mining IncHamilton Excavation
Bid Closing:09/03/2024 @ 10:30 AM
Description:Ontario Maintenance Station New Evaporation Pond Liner
This bid tabulation shall serve as ODOT's notice of intent to award a contract to (Realm Mining Inc). Aggrieved Bidders have 5 calendar days from the issued date shown above to protest the intent to award.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Project includes the installation of a new geotextile layer and pond liner in a previously prepared pond. Installation includes liner edge termination trench excavation and backfill. Project also includes modification of an existing manhole as shown on drawings. Refer to attached drawings and specifications1EA$ 65,900.00$ 65,900.00$ 77,055.00$ 77,055.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL$ 65,900.00$ 77,055.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0