This document is an Intent to Award notice from the Oregon Department of Transportation (ODOT) for the Ontario Maintenance Station New Evaporation Pond Liner project. The project includes the installation of a new geotextile layer and pond liner in a previously prepared pond, as well as modifications to an existing manhole. The project has an estimated quantity of 1 unit. The bid closing date is 09/03/2024 at 10:30 AM. ODOT intends to award the contract to Realm Mining Inc.
The bid tabulation shows the unit prices and total prices submitted by Realm Mining Inc. and Hamilton Excavation. Realm Mining Inc. submitted the lowest bid of $65,900.00 for the project. Aggrieved bidders have 5 calendar days from the date of the notice to protest the intent to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB_PW_Final~8.docx | DOCX document | |
| 00011205 Addendum 1.docx | DOCX document | |
| 00011205 Addendum 2~1.docx | DOCX document | |
| Attachment B Specifications.docx | DOCX document | |
| Attachment A Plans~1.pdf | ||
| 20252010_E1_Response_Log_and_Abstract.pdf | ||
| 00011205 VoluntaryPreBidMeetingNotes.pdf | ||
| 00011205 Preliminary Results~1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/3/24 | |||
| ITB No. | S-73000-00011205 | BIDDER | ||
| NAME: | Realm Mining Inc | Hamilton Excavation | ||
| Bid Closing: | 09/03/2024 @ 10:30 AM | |||
| Description: | Ontario Maintenance Station New Evaporation Pond Liner | |||
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to (Realm Mining Inc). Aggrieved Bidders have 5 calendar days from the issued date shown above to protest the intent to award. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Project includes the installation of a new geotextile layer and pond liner in a previously prepared pond. Installation includes liner edge termination trench excavation and backfill. Project also includes modification of an existing manhole as shown on drawings. Refer to attached drawings and specifications | 1 | EA | $ 65,900.00 | $ 65,900.00 | $ 77,055.00 | $ 77,055.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TOTAL | $ 65,900.00 | $ 77,055.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |