Mulberry Park
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66213-NONST-2026-000000016
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 65018 Combination Sets, Playground
- 65048 Recycled Recreational And Park Equipment
- 65072 Swings, Playground
- 72064 Sewage And Sludge Pumps, Submersible
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 98814 Erosion Control Services
- 98854 Lighting Services For Parks, Athletic Fields, Parking Lots, Etc.
- UNSPSC codes
- 40151718 Sludge pump spare parts
- 49221532 Playground system
- 40151719 Sewage pump spare parts
- 46161538 Vehicle height restriction bars
- 72152707 Retaining wall construction service
- 72152706 Driveway construction service
- 95111616 Pedestrian way
- 70131502 Soil conservation or protection services
- 49241501 Playground swings
- 56101604 Outdoor swings
Show all 19
- 40151525 Sludge pumps
- 40151720 Submersible pump spare parts
- 72152705 Sidewalk or ramp construction service
- 95111608 Bike path
- 40151517 Sewage pumps
- 46161535 Pedestrian walkway street boundary marker
- 72141105 Sidewalk construction and repair service
- 95111617 Footpath
- 70131503 Erosion control services
- Point of contact
-
- Jennifer Harrison jkidd@cityofhoschton.com (706) 654-3034
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Hoschton, Georgia is seeking sealed bids for the comprehensive construction of Mulberry Park, a 3.1-acre development project funded through a Land and Water Conservation Fund Grant. The project encompasses extensive construction elements including demolition, grading, erosion control, light-duty asphalt paving, slate access drives, sidewalks, park furniture, a pavilion, parking spaces, an amphitheater, restroom facilities, a pump station, ceramics building renovation, and associated electrical work. Sealed bids will be received at Hoschton City Hall until 11:00 a.m. on December 11, 2025, with bid evaluation and award occurring within 60 days of opening. Bidders must submit a bid bond or certified cashier's check for 5% of the total bid and will be evaluated on multiple criteria including price, work experience, and references. The total project timeline is 360 consecutive calendar days from the written Notice to Proceed, with contract documents available from Brewer Engineering for $325 for hard copies or $25 for electronic versions.
The project has specific contractor requirements, including that the successful bidder must perform a minimum of 30% of the contract value as the Prime Contractor. As a federally funded project through the U.S. Department of the Interior-National Park Service, contractors must comply with Davis-Bacon Wage Rates and Build America, Buy America (BABA) requirements. Surety companies must be listed on the Treasury Department's current list and authorized to do business in Georgia, with an option for Performance Bonds under $300,000 to submit an irrevocable Letter of Credit from a bank. The successful contractor must also furnish insurance, workers' compensation insurance, and Performance and Payment Bonds covering 100% of the total bid amount. While no specific set-aside designations for disadvantaged enterprises are mentioned, the project represents a significant municipal infrastructure development with a comprehensive scope of work requiring specialized construction and park development expertise.
Opportunity text
Sealed bids will be received by the City of Hoschton Georgia for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Mulberry Park in Hoschton, Georgia. Bids will be received at Hoschton City Hall, 61 City Square Street, Hoschton, GA 30548 until 11.00 AM on December 11, 2025. Any bid received after said time and date of bid opening will not be considered by OWNER The Project consists of, but is not limited to the following major elements: Construction of Mulberry Park to include demolition as described on the plans, grading and erosion control for approximately 3.1 acres, installation of light duty asphalt, slate access drives, sidewalks, slate paths, signage, sidewalks, park furniture, pavilion, parking spaces, pedestrian crossing, amphitheater seating, restroom, pump station and line work for restroom, ceramics building renovation, electrical for site and buildings, and all other associated appurtenances as shown on the plans. Time of completion for all work associated with this project shall be three hundred sixty (360) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. Paper Copies of Contract Documents, Specifications, and Construction Drawings may be obtained at the office of Brewer Engineering, 210 Trilith Parkway, Suite 100, Fayetteville, Ga 30214, upon payment of a non-refundable cost of $325.00. Checks should be made payable to Brewer Engineering. Electronic copies of the plans and manual may be obtained at a cost of $25.00. For general information, technical information and purchasing documents regarding this project, you may contact Brewer Engineering, 770-794-7012.
Files
| File | Type | Posted |
|---|---|---|
| Full Advertisment 110725.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity