MRF Permanent Stormwater Treatment System

Closed State & local contract opportunity Posted

Solicitation number
RFP No. PW-0238
State
California
Responses due

Opportunity facts

UNSPSC codes
Show all 43
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Santa Cruz Public Works Department is seeking a "turnkey" stormwater treatment system for the Resource Recovery Facility (MRF) through Request for Proposal (RFP) No. PW-0238. The procurement involves purchasing and installing a permanent treatment system designed to process 400 gallons per minute using polymer injection, settling, and sand filtration to meet Industrial General Permit (IGP) effluent limits. Proposers must demonstrate at least five years of experience installing similar industrial stormwater treatment systems and provide comprehensive design, construction, and operational services. The proposal will be evaluated using a 100-point system, with points allocated across five key criteria: RFP requirements (5%), firm and team qualifications (20%), MRF stormwater treatment design and work schedule (40%), cost proposal (20%), and training and support (15%). The RFP was released on August 27, 2025, with a pre-proposal meeting held on September 3, 2025, and proposal submissions due by October 1, 2025. The City anticipates awarding a one-year contract with options for two one-year extensions, targeting a temporary system installation by November 15, 2025, and permanent system completion by August 2026.

While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, the contract includes local hiring requirements and compliance with California Air Resources Board regulations, prevailing wage standards, and apprenticeship program participation. The project involves multiple jurisdictions, including Santa Cruz County and San Francisco City, and requires the installation of a comprehensive stormwater treatment infrastructure with specific technical requirements such as sample ports, automatic chemical dosing, alarms, and meters. The system must meet precise water quality parameters for pH, Total Suspended Solids, metals, and Chemical Oxygen Demand. Although a specific total contract value was not provided, the Schedule of Values document indicates a comprehensive pricing structure with contingencies and options for equipment purchase or rental. The proposed system includes multiple 20,000-gallon open-top frac tanks, sand filters, pumps, an industrial controller, and a polymer injection system, with provisions for monthly site visits, system inspections, and ongoing maintenance.

Opportunity text

Purchase of a "turnkey" treatment system to treat stormwater from the Resource Recovery Facility recycling yard and parking lot. The system will be designed to treat and operate at 400 gallons per minute (GPM) and is assumed to do so by method of polymer injection, settling, and sand filtration to achieve effluent limits stated in the Industrial General Permit (IGP). The work will include the mobilization, installation, startup, and training of the "turnkey" system.