About this file

This document is a City of Santa Cruz Public Works Department plan and detail for a Temporary Location Treatment System. The project involves installing a stormwater treatment system at a recycling yard, with a total work area of approximately 25' x 150'. Key components include a diversion box, (3) open-top frac tanks with 20,000-gallon capacity each, sand filters, generators, and approximately 100' of pipe. The system is designed to handle stormwater flow from impervious areas when flow exceeds 400 GPM, with sampling ports required for influent, midpoint, and effluent monitoring.

The site layout allows flexibility for the contractor to arrange equipment within the designated work/staging limits. Technical specifications include an Oldcastle Precast KOB-3636 embed box, 24" and 8" ADS SD pipes, and a sump pump to be installed by the vendor. The vendor will also be responsible for plugging the 4" outlet in the diversion box. The plan is dated 8/4/25 and includes detailed drawings of the diversion box, site layout, and equipment placement, with a scale of 1" = 20' for the overall site plan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SDSDSDSDSDSDSDSDSDSDSD

SpLg

SpLg

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SpLg

SD

SD

SD

SD

4'-0" 4'-0"

4'-0"

6"

OLDCASTLE

PRECAST KOB-3636

EMBED BOX 6

INCHES IN

CHANNEL

4"OUTLET

6"

REFERENCES

DRAWING #:

FIELD BOOK:

DESIGN

CHECKED

DATE

DRAWN

VAULT NO.

SCALE

SHEET OF

P U B L I C W O R K S D E P A R T M E N T

809 Center Street, Room 201 Santa Cruz, CA 95060

REVISIONS

C I T

Y O F S A N T A C

R U

Z

C

A L I F O R N

I

A

1866 CRUZATNAS

C I T Y O F

PLAN AND DETAIL

TEMPORARY LOCATION

TREATMENT SYSTEM

LV

HY

LV

8/4/25 AS SHOWN

1 1

GENERATOR

FUEL CELL

GENERATOR

(3) OPEN TOP FRAC TANKS

20,000 GALLON CAPACITY EACH

APPROX. DIM 48' x 8.5'

SUMP LOCATION

SEE NOTE 1

(DIVERSION BOX)

SAND FILTERS LIMITS OF WORK/STAGING

1. ALL STORMWATER FROM IMPERVIOUS AREAS OF THE RECYCLING YARD AND PARKING

LOT IS COLLECTED AT THE DIVERSION BOX. THE DIVERSION BOX IS DESIGNED

TO OVERFLOW ONCE FLOW EXCEEDS 400 GPM.

2. TREATMENT SYSTEM LAYOUT DOES NOT NEED TO MATCH DESIGN SHOWN, THE AREA

FOR THE SYSTEM IS ROUGHLY 25' x 150'. THE CONTRACTOR MAY UTILIZE THE

AFOREMENTIONED SPACE AS THEY SEE FIT.

3. TREATMENT SYSTEM MUST HAVE SAMPLING PORTS FOR INFLUENT, MIDPOINT, AND

EFFLUENT FLOWS.

4. A SUMP WILL BE REQUIRED TO PUMP WATER FROM THE DIVERSION BOX TO THE

INFLUENT BAKER TANK. SUMP PUMP AND ASSOCIATED PIPING TO BE INSTALLED BY

THE VENDOR.

4.1. VENDOR SHALL PLUG THE 4" OUTLET IN DIVERSION BOX.

NOTES:LEGEND

MAJOR CONTOUR

MINOR CONTOUR

LIMIT OF WORK

(E) STORM DRAIN

(N) STORM DRAIN

(E) SD CATCH BASIN

(E) DIVERSION BOX

SD

SD

APPROX. 100' OF PIPE

SEE NOTE 4

25'

150'

INFLUENT 24"

ADS SD PIPE

INFLUENT 8" ADS SD PIPE

DIVERSION BOX

NOT TO SCALE

TREATMENT SYSTEM OUTFALL

APPROX. 100' OF PIPE

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text 40'

AutoCAD SHX Text 20'

AutoCAD SHX Text

SCALE: 1" = 20'

Sheets and Views
Alternate Install Location-Plan

File details come from the government source that posted it. Updated .