Aerial_Pipe_and_Pad_Design_-_MRF_Stormwater_Treatment_System.pdf

PDF 16 MB Posted

Attached to
MRF Permanent Stormwater Treatment System
Solicitation number
RFP No. PW-0238
Issued by
Santa Cruz County, San Francisco City, California

About this file

These engineering design documents are for the City of Santa Cruz Public Works Department's Aerial Pipe Design Project at the Santa Cruz Resource Recovery Facility, dated May 2025. The project involves detailed site planning, grading, and infrastructure design for a new facility, with four primary engineering sheets (C-001 Cover Sheet, C-100 Site Plan and Index Map, C-101 Tank Pad Grading, and C-501 Details). The project includes aerial surveying, site mapping, drainage infrastructure, storm drain systems, and pavement construction, with precise elevation and geographical data captured using a DJI M3E RTK drone on February 28, 2024.

The design documents indicate a comprehensive engineering approach with horizontal and vertical accuracy calculated using nine random check points, with accuracy measured at 0.10' for both horizontal and vertical measurements. The site involves multiple existing lined and unlined cells, with proposed grading, liner limits, and construction disturbance areas carefully mapped. The pavement structural sections include 6" asphaltic concrete paving with petromat geotextile fabric reinforcement, 8" aggregate base course, and prepared subgrade. The project appears to be funded through the City of Santa Cruz Public Works Department, with engineering services provided by Tetra Tech, and involves significant site modification and infrastructure development for the Resource Recovery Facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P U B L I C W O R K S D E P A R T M E N T

City of Santa Cruz, Public Works Department Superintendent of Waste Disposal Craig Pearson

REVIEWED BY:

Project Engineer City of Santa Cruz, Public Works Department

City of Santa Cruz, Public Works Department

Hoi Yu, P.E.

REVIEWED BY:

APPROVED BY:

Christophe J. Schneiter City Engineer

DATE:

DATE:

DATE:

DESCRIPTIONREV. DATE

REVISIONS

809 Center Street, Room 201 Santa Cruz, CA 95060

P U B L I C W O R K S D E P A R T M E N T

CRUZATNAS

C I T Y O F

SHEET NUMBER

DRAWING NUMBER

of 4

SCALE

NTS

City of Santa Cruz Department of Public Works

Engineering Division

C-001 COVER SHEET

(IF NOT 2"-SCALE ACCORDINGLY)

CHMCHECKED

LINE IS 2 INCHES

DRAWN

DESIGNED

CHECKED

FILE

GRB

ADL

ADL

AT FULL SIZE

City of Santa Cruz, Public Works Department

APPROVED BY:

Senior Engineer

DATE:

Steve Wolfman

CRUZATNAS

C I T Y O F

21700 Copley Drive, Suite 200 Diamond Bar, CA 91765

TEL 909.860.7777 FAX 909.860.8017

Q :\S an ta

C ru z\ S

C

LF

\A er ia l P ip e

D es ig n\

C A

D \S he et

Fi le s\ C

-0

C ov er S he et

.d w g 5/

/2

:4

A

M

D R

A F

T

N O

T F

O R

C O

N S

T R

U C

T

IO

N

CITY OF SANTA CRUZ

AERIAL PIPE DESIGN

QUARRY

SAND

WILDER

STATE PARK

WILDER RANCH

SITE LOCATION MAP

PACIFIC OCEAN

NTS

MISSION ST

SANTA CRUZ

OF CALIFORNIA

RESOURCE RECOVERY FACILITY

CITY OF SANTA CRUZ

VICINITY MAP

STATE PARK

REDWOODS

BIG BASIN

NTS

AERIAL PIPE DESIGN PROJECT

MAY 2025

SANTA CRUZ

RESOURCE

RECOVERY

FACILITY

DIMEO LANE SANTA

CRUZ

SANTA CRUZ

RESOURCE

RECOVERY

FACILITY

SANTA

CRUZ

SAN

JOSE

REDWOOD

CITY

C-001

COVER SHEET

INDEX OF SHEETS

SHEET NO SHEET TITLE

C-001 COVER SHEET

C-100 SITE PLAN AND INDEX MAP

C-101 TANK PAD GRADING

C-501 DETAILS

C P

-1

C P

-1

C P

-3

W M

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.6

2'

C U

R

TA

IN

D

R A

IN

R

IM

E

L.

.7 8'

IN

V

E L.

.4

3'

S D

S S

S S

S S

S S

S S

S S

W V

W V

W V

W V

W V

W V

D M S

D M S

D M S

D M S

D M S

D M S

D M S �D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

D M S

S )0

S )0

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.9

9'

IN

V E

L.

.0 9'

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.6

4'

IN

V E

L.

.8 4'

D R

A

IN

A G

E

IN

LE

T

FL

O

W L

IN

E

A T

C A

TC

H

B A

S

IN

E L.

.9

0'

IN

V E

L.

.4 9'

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.8

8'

IN

V E

L.

.5 6'

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.5

0'

IN

V E

L.

.6 0'

(T O

P O

F

FI

LT

E

R

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.1

4'

IN

V E

L.

.1 8'

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.9

0'

IN

V E

L.

.2 6'

D R

A

IN

A G

E

IN

LE

T

R

IM

E L.

.2

8'

IN

V E

L.

.2

C U

R

TA

IN

D

R A

IN

R

IM

E

L.

.3 7'

IN

V

E L.

.7

7'

C U

R

TA

IN

D

R A

IN

R

IM

E

L.

.6 6'

IN

V

E L.

.1

6'

D Ú

)M Ú �Ú Ú

V Ú �Ú Ú

C U

R

TA

IN

D

R A

IN

R

IM

E

L.

.2 0'

IN

V

E L.

.1

0'

D Ú

)M Ú �Ú Ú

V Ú �Ú Ú

D Ú

)M Ú �Ú Ú

D Ú

W Ú Ú �Ú Ú

V �Ú �Ú Ú

Ú S D Ú )0

Ú M

V �Ú �Ú Ú

Ú M

V �Ú �Ú Ú

" H

D P

E

IN

V . E

L.

.5 6'

S D

Ú

�4

�4

D

8" P

V C

IN

V

. E L.

.0

6'

6" P

V C

IN

V

. E L.

.3

6'

" H

D P

E P

IP

E

IN

V

. E L.

.4

5'

" C

M P

IN

TE

R S

E C

TS

" H D

P E

P

IP

E

" C

M P

IN

V

. E L.

.2

7'

S E T

M A G

C P

W -2

0G

ELECTRICAL (OVERHEAD)

ELECTRICAL (OVERHEAD)

ELECTRICAL (OVERHEAD)

W -4

T W

-4 S

W -3

D R

R P

-1

W -1

0D

W -1

5D

W -1

2D W

-1 2T

W -9

D

W -3

S

W -3

G

W -4

G R

W -1

1G

W -1

1G R

W -8

G

W -2

1G

W -7

G

W -1

1D

W -8

D

W -7

D

D S

-1

EXISTING

CELL 2

LINED AREA

EXISTING

CELL 1 LINED

AREA

EXISTING

CELL 3A

LINED AREA

UNLINED AREA

EXISTING

CELL 3B

LINED AREA

OE

OE

OE

OE

OE OE OE OE

OE

OE

O E

O E

OE

OE

OE

6.

0.

5.

0.

4.

7.

2.

0.

0.

5.

5.

2.

3.

1 25 9.

9.

2.

9.

5.

7.

1.

4.

3.

0.

8.

3.

6.

8.

8.

2.

8.

0.

9.

5.

3.

0.

9.

1.

5.

3.

9.

2.

8.

2.

5.

5.

8.

9.

0.

6.

0.

8.

1.

CONTROL POINTS

Point

Northing

179113.44

175981.08

176128.32

Easting

1531666.18

1531621.85

1530808.66

Elevation

512.99

258.34

122.80

AERIAL CHECK POINTS

Point

Northing

178327.83

178711.11

177636.72

178181.91

177154.36

176964.22

176684.13

177989.02

177781.66

Easting

1531726.25

1531193.30

1531308.87

1531344.31

1531130.28

1531767.37

1531037.22

1530662.63

1530917.20

Elevation

455.60

465.17

348.75

409.13

410.23

346.76

280.90

298.89

401.37

City of Santa Cruz Department of Public Works

Engineering Division

DATEDESCRIPTIONZONE REV. BY APP.

SHEET NUMBER

DRAWING NUMBER

SCALE

C-100 SITE PLAN AND INDEX MAP

(IF NOT 2"-SCALE ACCORDINGLY)

CHMCHECKED

LINE IS 2 INCHES

DRAWN

DESIGNED

CHECKED

FILE

GRB

ADL

ADL

AT FULL SIZE

DATE:APPROVED:

809 Center Street, Room 201 Santa Cruz, CA 95060

P U B L I C W O R K S D E P A R T M E N T

CRUZATNAS

C I T Y O F

REVISIONS CITY OF SANTA CRUZ

AERIAL PIPE DESIGN

of 4

21700 Copley Drive, Suite 200 Diamond Bar, CA 91765

TEL 909.860.7777 FAX 909.860.8017

Q :\S an ta

C ru z\ S

C

LF

\A er ia l P ip e

D es ig n\

C A

D \S he et

Fi le s\ C

-1

S ite

P la n A nd In de x

M ap

.d w g 5/

/2

:4

A

M D R

A F

T

N O

T F

O R

C O

N S

T R

U C

T

IO

N

LEGEND

SURVEY NOTES:

1. AERIAL PHOTOGRAPHY ACQUIRED ON FEBRUARY 28, 2024 BY EO&A PROFESSIONAL LAND SURVEYORS USING

A DJI M3E RTK DRONE FLYING AT AN AVERAGE ALTITUDE OF 266' ABOVE GROUND LEVEL (AGL), RESULTING IN

A GROUND SAMPLING DISTANCE (GSD) OF 2.2 CM PER PIXEL.

2. HORIZONTAL AND VERTICAL ACCURACY OF THE PHOTOGRAMMETRIC MODEL WAS CALCULATED USING NINE (9)

RANDOM CHECK POINTS AS 0.10' AND 0.10' RESPECTIVELY.

3. GROUND CONTROL SET AND SURVEYED USING A CARLSON BRx7 CENTIMETER-LEVEL GPS SYSTEM.

4. HORIZONTAL DATUM IS NORTH AMERICAN DATUM OF 1927 (NAD27), CALIFORNIA ZONE 3 GRID BASED ON

CONTROL PROVIDED BY THE CLIENT.

5. VERTICAL DATUM IS REFERENCED TO CONTROL PROVIDED BY THE CLIENT.

6. DASHED LINES MAY NOT MEET MAP ACCURACY STANDARDS.

7. BUILDING OUTLINES INDICATE DRIP LINE BUT MAY ALSO INCLUDE STAIRS AND ATTACHMENTS.

8. FEATURES IN SHADOWS AND VEGETATION MAY BE OBSCURED, FEATURES NEAR TALL OBJECTS MAY BE

OBSCURED DUE TO PHOTOGRAPHIC ANGLE.

9. SMALL SHADOW AND VEGETATION AREAS NOT SHOWN FOR CLARITY.

10. MAPPING OUTSIDE OF SURVEY CONTROL PERIMETER MAY NOT MEET MAP ACCURACY STANDARDS.

11. PLANIMETRY AND TOPOGRAPHY IN OBSCURED AREAS MAY NOT MEET MAP ACCURACY STANDARDS.

12. SHOWN CONTROL POINT ELEVATIONS ARE AT GROUND LEVEL UNLESS OTHERWISE INDICATED.

GRAPHIC SCALE:1''=

100'

100 200

SITE PLAN AND

INDEX MAP

C-100

SHEET C-101

LIMIT OF CLOSURE AREA

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED LINER LIMIT

APPROXIMATE LIMIT OF PROPERTY LINE

EXISTING LINER LIMIT

LIMIT OF GRADING / DAYLIGHT

PAVED ROAD

GRADE BREAK

UNPAVED ROAD / BENCH

EASEMENT RIGHT-OF-WAY

LIMIT OF CONSTRUCTION / DISTURBANCE

APPROXIMATE PERMIT LIMIT

SURVEY CONTROL POINT

SURVEY MONUMENT

AERIAL CHECK POINT

EXISTING LINER LIMIT

GRADE BREAK

LIMIT OF REFUSE / FINAL COVER

AutoCAD SHX Text W

AutoCAD SHX Text

MONITORING WELL #3

AutoCAD SHX Text

LEAK DETECTION

AutoCAD SHX Text

4" LPG

AutoCAD SHX Text

8" LPG

AutoCAD SHX Text

6" LPG BYPASS

AutoCAD SHX Text

8" LPG

AutoCAD SHX Text

6" LPG BYPASS

AutoCAD SHX Text

SUBDRAIN

AutoCAD SHX Text

6" LPP

AutoCAD SHX Text

LEAK DETECTION

AutoCAD SHX Text

8" LPG

AutoCAD SHX Text

4" LPG

AutoCAD SHX Text

4" LPG

AutoCAD SHX Text

12" STD

AutoCAD SHX Text

OH ELEC

AutoCAD SHX Text

PP

2:

2:

2:1

RP-1

W-10D

EL:215.97

EL:216.00

N:176545.17 E:1530917.07

EL:214.92

EL:215.68

EL:214.70

EL:215.38

EL:214.46

EL:215.76

N:176543.48 E:1530925.98

EL:215.00

N:176528.68 E:1530950.90

EL:214.19

N:176506.23 E:1530971.65

EL:211.51

N:176486.12 E:1531005.19

EL:212.46

N:176490.83 E:1530993.96

EL:213.39

N:176496.74 E:1530983.59

EL:211.91

N:176471.88 E:1531055.83

EL:208.58

N:176464.65 E:1531037.22

EL:210.69

N:176471.79 E:1531011.82

EL:212.18

N:176473.31

E:1530992.37

EL:214.00

N:176470.47

E:1530968.52

EL:214.00

N:176470.67 E:1530912.41

EL:214.00

N:176488.27

E:1530849.83

EL:214.52

N:176511.04

E:1530856.24

R

R50

R

'-0

65'-0" PIPE BRIDGE

(TYP OF 3)

8%

8%

280.90

219.3

City of Santa Cruz Department of Public Works

Engineering Division

DATEDESCRIPTIONZONE REV. BY APP.

SHEET NUMBER

DRAWING NUMBER

SCALE

C-101 TANK PAD GRADING

(IF NOT 2"-SCALE ACCORDINGLY)

CHMCHECKED

LINE IS 2 INCHES

DRAWN

DESIGNED

CHECKED

FILE

GRB

ADL

ADL

AT FULL SIZE

DATE:APPROVED:

809 Center Street, Room 201 Santa Cruz, CA 95060

P U B L I C W O R K S D E P A R T M E N T

CRUZATNAS

C I T Y O F

REVISIONS CITY OF SANTA CRUZ

AERIAL PIPE DESIGN

of 4

21700 Copley Drive, Suite 200 Diamond Bar, CA 91765

TEL 909.860.7777 FAX 909.860.8017

Q :\S an ta

C ru z\ S

C

LF

\A er ia l P ip e

D es ig n\

C A

D \S he et

Fi le s\ C

-1

T an k P ad G ra di ng .d w g

5/

/2

:5

A M

D R

A F

T

N O

T F

O R

C O

N S

T R

U C

T

IO

N

GRAPHIC SCALE:1''=

20'

20 40

CONSTRUCTION NOTES

LEGEND

TANK PAD GRADING C-101

C-501

C-501

AC PAD AND RAMP WITH THICKENED EDGE PER

6" HDPE STORM DRAIN, MAINTAIN MINIMUM 2%

SLOPE TOWARD STORMWATER TANK PAD

6" ELEVATED STEEL STORM DRAIN, PIPE WALL

THICKNESS, SUPPORTS, AND FOUNDATIONS BY

OTHERS

TRANSITION FROM 6" ON-GRADE HDPE STORM

DRAIN TO 6" ELEVATED STEEL STORM DRAIN

STORMWATER RUNOFF TANK BY OTHERS

EARTH FILL

RECONSTRUCT EXISTING SD INLET STRUCTURE

WITH TRAFFIC-RATED BOX AND GRATE,

CONSTRUCT RIM TO BE FLUSH WITH ROAD

ELEVATION

CONNECT 6" HDPE STORM DRAIN TO EXISTING 6"

HDPE STORM DRAIN, POINT OF CONNECTION TO

BE FIELD VERIFIED

ANCHOR 6" STORM DRAIN ON GRADE WITH

MINIMUM 1 CY SOIL PILE AT 20-FT ON CENTER

SPACING ALONG LENGTH OF ON-GRADE STORM

DRAIN

LIMIT OF CLOSURE AREA

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED LINER LIMIT

APPROXIMATE LIMIT OF PROPERTY LINE

EXISTING LINER LIMIT

LIMIT OF GRADING / DAYLIGHT

PAVED ROAD

GRADE BREAK

UNPAVED ROAD / BENCH

EASEMENT RIGHT-OF-WAY

LIMIT OF CONSTRUCTION / DISTURBANCE

APPROXIMATE PERMIT LIMIT

EXISTING LINER LIMIT

GRADE BREAK

LIMIT OF REFUSE / FINAL COVER

SURVEY CONTROL POINT

SURVEY MONUMENT

AERIAL CHECK POINT

City of Santa Cruz Department of Public Works

Engineering Division

DATEDESCRIPTIONZONE REV. BY APP.

SHEET NUMBER

DRAWING NUMBER

SCALE

C-501 DETAILS

(IF NOT 2"-SCALE ACCORDINGLY)

CHMCHECKED

LINE IS 2 INCHES

DRAWN

DESIGNED

CHECKED

FILE

GRB

ADL

ADL

AT FULL SIZE

DATE:APPROVED:

809 Center Street, Room 201 Santa Cruz, CA 95060

P U B L I C W O R K S D E P A R T M E N T

CRUZATNAS

C I T Y O F

REVISIONS CITY OF SANTA CRUZ

AERIAL PIPE DESIGN

of 4

21700 Copley Drive, Suite 200 Diamond Bar, CA 91765

TEL 909.860.7777 FAX 909.860.8017

Q :\S an ta

C ru z\ S

C

LF

\A er ia l P ip e

D es ig n\

C A

D \S he et

Fi le s\ C

-5

D et ai ls

.d w g 5/

/2

:0

A

M

D R

A F

T

N O

T F

O R

C O

N S

T R

U C

T

IO

N

DETAILS C-501

DETAIL - PAVEMENT STRUCTURAL SECTION

REFERENCE SHEET: C-101 NTS

DETAIL - PAVEMENT THICKENED EDGE2

REFERENCE SHEET: C-101 NTS

DETAIL3

REFERENCE SHEET:

NTS

DETAIL4

REFERENCE SHEET: NTS

DETAIL5

REFERENCE SHEET: NTS

DETAIL6

REFERENCE SHEET:

NTS

6" BASE COURSE

THICKNESS

TOTAL PAVEMENT SECTION THICKNESS:

(ASPHALT CONCRETE � BASE COURSE)6" ASPHALTIC CONCRETE PAVING

WITH PETROMAT GEOTE;TILE

FABRIC REINFORCEMENT AT

CENTER OF SECTION

8" AGGREGATE BASE COURSE

(COMPACTED TO �5� ASTM D-155�)

SUBGRADE (UPPER 12" SCARIFIED AND

RECOMPACTED TO �5� ASTM D-155�)

ASPHALTIC CONCRETE PAVING

AGGREGATE

BASE COURSE

SUBGRADE

(�5� COMPACTION)

Santa Cruz Aerial Pipe Draft Design
C-001 Cover Sheet
C-001 Cover Sheet
PLOT
C-100 Site Plan and Index Map
C-100 Site Plan and Index Map
PLOT
C-101 Tank Pad Grading
C-101 Tank Pad Grading
PLOT
C-501 Details
C-501 Details
PLOT
S-100
Sheets and Views
S-1
S-001
Sheets and Views
S-1

File details come from the government source that posted it. Updated .