About this opportunity

The City of Santa Cruz, California Public Works Department is soliciting sealed bids for installation of a seasonal floating debris boom and three bollard assemblies at the intake structures of the San Lorenzo River Lagoon Culvert, with bids due January 19, 2027 at 2:00 p.m. Pacific Standard Time. Good-faith local hiring efforts are required under Santa Cruz Municipal Code Chapter 3.10, with preference for Santa Cruz County residents and for apprentices enrolled in California Division of Apprenticeship Standards-approved programs.

Bidders must hold valid California Contractor's Class "A" licenses, and all subcontractors must hold appropriate trade licenses at bid submittal. All contractors and subcontractors must register with the California Department of Industrial Relations and comply with prevailing wage requirements.

Scope includes drilling; installing three bollard assemblies with 3-inch galvanized steel poles embedded at least 6 feet below ground surface and connected to existing 24-inch and 8-inch knife gate pipes; the debris boom and appurtenances; mobilization and demobilization; and environmental protection measures, including water pollution and erosion control. Work must comply with regional water quality control board requirements, construction access limits (Beach Street access restricted to 6:00 a.m. to 8:00 a.m. on weekdays), and California Air Resources Board Certificate of Reported Compliance requirements for in-use off-road diesel fleets. The completion period is 50 working days from Notice to Proceed, with work commencing within 10 days of that notice.

Bidders must post bid security of at least 10 percent of the bid amount by certified check, cashier's check, or bid bond. The successful bidder must furnish Labor and Material and Faithful Performance bonds, each equal to 100 percent of the contract price, plus commercial general liability insurance of $2 million per occurrence, automobile liability insurance of $1 million, and statutory workers' compensation. Progress payments carry 5 percent retention until 35 calendar days after the Notice of Completion is recorded. The bid form includes a 10 percent contingency allowance.

The City will award to the lowest responsible and responsive bidder and reserves the right to reject any or all bids. Bidding documents are free to download from the City website and OpenGov.com, or available as a nonrefundable $30 hard copy from Public Works at 809 Center Street, Room 201, Santa Cruz. Project C601403 plans by AVICIL, dated July 5, 2025, and combined specifications dated October 2026 are attached.

Opportunity text

The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a flood control culvert was constructed to reduce uncontrolled breaches and improve water quality for endangered fisheries. The project installed a dual-pipe drainage system designed to convey river water through the seasonal sandbar and discharge it to the ocean. This system reduces the need for mechanical breaching of the lagoon while improving water quality by removing high-salinity water from the lowest portion of the lagoon. By reducing the frequency of mechanical breaching, the project has proven to provide multiple benefits, including protection of public and private property, enhanced habitat conditions for endangered species such as tidewater goby and steelhead, and increased safety for recreational beach users.

After the culvert became operational, an issue was identified with the specialized intake structures. These intakes are designed to allow continuous flow into the culvert while preventing fish from being harmed or impinged. However, because the screens have a fine mesh size, debris such as grass, small sticks, and trash can accumulate on the screens and reduce flow capacity. To address this issue, the City has designed a seasonal floating debris boom (Project) that will be installed around the intakes. The boom will intercept floating debris before it reaches the screens, helping keep the intake structures clear and ensuring the culvert system operates at full capacity during the summer months.