Morgan Circle & Ford Canyon Park Sewer Line Replacement Project

Open State & local contract opportunity Posted

Solicitation number
ITB-2705
State
New Mexico
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 12
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

McKinley County, New Mexico is seeking construction contractors for the Morgan Circle & Ford Canyon Park Sewer Line Replacement Project, with responses due December 16, 2026. The project is subject to New Mexico prevailing wage requirements under the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78). Contractors must pay the rates in Wage Decision MC-26-3998-A, posted November 25, 2026, and must sign a Statement of Intent to Pay Prevailing Wages. A separate Affidavit of Wages Paid is required for each contractor tier upon completion. Noncompliance, including incorrect job classification or improper wage payment, triggers debarment procedures and back-wage liability.

The scope comprises two sewer line realignments. At Morgan Circle, the work installs 130 linear feet of new 6-inch SDR 35 PVC sewer line with manholes, trenching, backfilling, bypass pumping, and abandonment of services, followed by additional backfill, finished grading, and rip rap installation. At Ford Canyon Park, the work installs 470 linear feet of new 8-inch SDR 35 PVC sewer line with manholes, trenching, backfilling, and abandonment of existing lines, and requires sod replacement.

The package includes a City of Gallup right-of-way public easement work permit, an NMDOT traffic control roadway work permit, an NMDOT indemnification and hold harmless agreement, and EPA Form 3510-9, the construction stormwater Notice of Intent under the NPDES Construction General Permit, which requires an original signed submission. A Gallup sample contract is also attached.

The project documents were updated on November 25, 2026, with a revised project file and the wage decision. The opportunity was posted November 20, 2026.

Opportunity text

This project consists of sewer line realignments in two locations. The Morgan circle project consists of installing 130 linear feet of new 6 inch SDR 35 PVC sewer line. Work will include manholes, trenching, backfilling, bypass pumping, and abandonment of services. Additional backfill, finished grading and rip rap installation is also required. The Ford Canyon Park project consists of installing 470 linear feet of new 8 inch SDR 35 PVC sewer line. Work will include manholes, trenching, backfilling, and abandonment of existing lines. Sod replacement shall be required.

Files

Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors