Wage_Decision_MC-26-3998-A.pdf

PDF 370 KB Posted

Attached to
Morgan Circle & Ford Canyon Park Sewer Line Replacement Project
Solicitation number
ITB-2705
Issued by
Mckinley County, New Mexico

About this file

This is a Wage Decision Approval Summary document issued by the New Mexico Department of Workforce Solutions for the Morgan Circle & Ford Canyon Park Sewer Line Replacement Project, involving the City of Gallup as the contracting agency. The project consists of installing 130 linear feet of new 6-inch SDR 35 PVC sewer line at Morgan Circle, Ford Canyon Park, located at 908 E Buena Vista in Gallup, McKinley County, New Mexico. Work includes manholes, trenching, backfilling, bypass pumping, and abandonment of services, with additional backfill, finished grading, and rip rap installation required. The estimated contract award date is January 15, 2027, with the Notice of Completion and Disposition (NOCD) due by March 25, 2027. The total estimated project cost is $542,365.69, classified as Highway/Utilities (Type A) construction.

The wage decision (MC-26-3998-A) became effective July 1, 2026, and establishes prevailing wage rates for all trade classifications applicable to this public works project. No federal funds are involved in this project. Contractors are required to pay applicable base rates, fringe rates, and apprenticeship rates according to specific trade classifications, including Plumber/Pipefitter ($44.32 base rate plus $18.00 fringe), Equipment Operator ($40.94 base rate plus $17.73 fringe), Carpenter/Lather ($32.12 base rate plus $14.28 fringe), and various Laborer classifications ranging from $18.41 to $20.41 in base rates. All contractors must also comply with subsistence, zone, and incentive pay requirements as specified by the New Mexico Department of Workforce Solutions Labor Relations Division.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wage Decision Approval Summary

1) Project Title: Morgan Circle & Ford Canyon Park Sewer Line Replacement Project Requested Date: 11/25/2026 Approved Date: 11/25/2026 Approved Wage Decision Number: MC-26-3998-A

NOCD Due Date: 03/25/2027

Failure to submit the NOCD by the due date may cause the project to be non-compliant.

2) Physical Location of Jobsite for Project:

Job Site Address: Morgan Circle, Ford Canyon Park, 908 E Buena Vista Job Site City: Gallup Job Site County: McKinley

3) Contracting Agency Name (Department or Bureau): City of Gallup Contracting Agency Contact's Name: Frances Rodriguez Contracting Agency Contact's Phone: (505) 863-1334 Ext.

4) Estimated Contract Award Date: 01/15/2027

5) Estimated total project cost: $542,365.69

a. Are any federal funds involved?: No

b. Does this project involve a building?: No

c. Is this part of a larger plan for construction on or appurtenant to the property that is subject to this project?: No

d. Are there any other Public Works Wage Decisions related to this project?: No

e. What is the ultimate purpose or functional use of the construction once it is completed?: Replace sewer line to improve utility infrastructure and mitigate continued sewer line breaks and leaks. Project consists of installing 130 linear feet of new 6 inch SDR 35 PVC sewer line. Work will include manholes, trenching, backfilling, bypass pumping, and abandonment of services. Additional backfill, finished grading and rip rap installation is also required.

6) Classifications of Construction:

Classification Type and Cost Total

Description

Highway/Utilities (A) Cost: $542,365.69

Replace sewer line to improve utility infrastructure and mitigate continued sewer line breaks and leaks Project consists of installing 130 linear feet of new 6 inch SDR 35 PVC sewer line Work will include manholes trenching backfilling bypass pumping and abandonment of services Additional backfill finished grading and rip rap installation is also required

LABOR RELATIONS DIVISION WWW.DWS.STATE.NM.US

401 Broadway NE Albuquerque, NM 87102 Phone: 505-841-4400 Fax: 505-841-4424

226 South Alameda Blvd Las Cruces, NM 88005 Phone: 575-524-6195 Fax: 575-524-6194

An Equal Opportunity Employer Page 1 of 1

Page | 1

Trade Classification

Base Rate

Fringe Rate

Apprenticeship

Cement Mason 21.75 7.43 0.60

Drywall Finisher/Taper 31.60 9.58 0.60

Drywall Finisher/Taper – Los Alamos County

35.85 12.82 0.60

Glazier/Fabricator 22.75 7.70 0.60

Glazier/Fabricator – Los Alamos County

22.75 7.70 0.60

Painter 21.00 5.75 0.60

Painter – Los Alamos County 35.85 12.82 0.60

Paper Hanger 21.00 5.75 0.60

Paper Hanger – Los Alamos County 36.85 12.82 0.60

Plumber/Pipefitter 44.32 18.00 0.60

Soft Floor Layers 21.52 9.40 0.60

Soft Floor Layers – Los Alamos County

35.87 12.92 0.60

Bricklayer/Block Layer/Stonemason

Bricklayer/Block layer/Stonemason 33.41 12.04 0.60

Bricklayer/ Block layer/Stonemason

– Curry, DeBaca, Quay and Roosevelt counties

23.10 8.98 0.60

Bricklayer/ Block layer/Stonemason

– Doña Ana, Otero, Eddie, and Lea counties

29.56 14.10 0.60

Carpenter

Carpenter/Lather 32.12 14.28 0.60

Carpenter- Los Alamos County 38.56 14.70 0.60

TYPE “A” –

STREET, HIGHWAY, UTILITY & LIGHT ENGINEERING

Effective July 1, 2026

Page | 2

TYPE “A” – STREET, HIGHWAY, UTILITY &

LIGHT ENGEINERRING

Electricians – Outside Classifications: Zone 1

Ground man 28.54 13.36 0.60

Equipment Operator 40.94 17.73 0.60

Lineman 51.71 21.43 0.60

Journeyman technician 48.15 20.53 0.60

Journeyman substation technician 48.15 20.53 0.60

Journeyman transmission technician 47.58 20.40 0.60

Cable Splicer 52.98 21.75 0.60

Electricians-Outside Classifications: Zone 2

Ground man 28.54 13.36 0.60

Equipment Operator 40.94 17.73 0.60

Lineman 51.71 21.43 0.60

Journeyman technician 48.15 20.53 0.60

Journeyman substation technician 48.15 20.53 0.60

Journeyman transmission technician 47.58 20.40 0.60

Cable Splicer 52.98 21.75 0.60

Electricians-Outside Classifications: Los Alamos County

Ground man 29.35 13.38 0.60

Equipment Operator 42.12 17.76 0.60

Lineman 53.07 21.77 0.60

Journeyman technician 49.55 20.89 0.60

Cable Splicer 58.28 23.07 0.60

Ironworker

Ironworker Journeyman 29.45 19.51 0.60

Probationary Ironworker 23.56 19.51 0.60

Page | 3

TYPE “A” – STREET, HIGHWAY, UTILITY &

LIGHT ENGEINERRING

Laborers

Group I – unskilled 18.41 7.74 0.60

Group II – semiskilled 19.41 7.74 0.60

Group III – skilled 19.91 7.74 0.60

Group IV – specialty 20.41 7.74 0.60

Operators

Group I 23.69 6.95 0.60

Group II 24.72 6.95 0.60

Group III 27.03 6.95 0.60

Group IV 28.65 6.95 0.60

Group V 28.79 6.95 0.60

Group VI 29.05 6.95 0.60

Group VII 29.28 6.95 0.60

Group VIII 30.27 6.95 0.60

Group IX 40.08 6.95 0.60

Group X 44.72 6.95 0.60

Roofers

Roofer Journeyman 31.20 9.36 0.60

Roofer Helper 18.72 9.36 0.60

Truck Drivers

Group I-IX 21.70 9.65 0.60

NOTE: All contractors are required to pay SUBSISTENCE, ZONE, AND INCENTIVE PAY according to the particular trade. More information available at https://www.dws.state.nm.us/public-works.

For more information about the Subsistence, Zone, and Incentive Pay rates, or to file a wage claim, contact the New

Mexico Department of Workforce Solutions Labor Relations Division at (505) 841-4400 or visit us online at www.dws.state.nm.us.

https://www.dws.state.nm.us/public-works http://www.dws.state.nm.us/

File details come from the government source that posted it. Updated .