This is a stamped engineering drawing and specification document prepared by DePauli Engineering & Surveying LLC for the City of Gallup, McKinley County, New Mexico, for the Morgan Circle & Ford Canyon Park Sewer Line Replacement Project under Formal Bid No. ITB-2705. The project consists of two distinct sewer line installation locations: the Morgan Circle project requires installation of 130 linear feet of new 6-inch SDR 35 PVC sewer line with associated manholes, trenching, backfilling, bypass pumping, and service abandonment, along with additional backfill, finished grading, and rip-rap installation; the Ford Canyon Park project requires installation of 470 linear feet of new 8-inch SDR 35 PVC sewer line with manholes, trenching, backfilling, abandonment of existing lines, and sod replacement. The project is funded by SAP 23-H2441-GF. The document includes comprehensive general notes, survey notes, utility construction notes, and a partial list of incidental work items covering construction staking, storm water pollution prevention, traffic control, landscape restoration, emergency response, and proper disposal of materials. Construction specifications address concrete requirements (4000 PSI at 28 days with 4.5-7.5% entrained air), pipe bedding and backfill gradation requirements, payment terms based on linear footage installed, and deflection specifications (3-degree maximum per joint).
The document establishes detailed contractor requirements including provision and maintenance of traffic control devices in accordance with USDOT/FHWA Manual on Uniform Traffic Control Devices throughout the seven-day-per-week project duration, adherence to New Mexico One Call 811 notification procedures prior to excavation, and coordination with multiple utility companies and municipal departments listed with specific contact information. Contractor responsibilities include quality control testing through an independent testing laboratory, 24-hour notification to the engineer before concrete placements, protection of control monuments and benchmarks with contractor-borne costs for replacement due to negligence, development and implementation of a stamped traffic control plan, environmental protection measures, and coordination with the City of Gallup Water Department for potable water access from designated pump stations. The contract specifies that the engineer will provide construction staking for sewer lines, site grading, and control benchmarks, with the contractor responsible for blue-top staking for subgrade and base course work. All submittals for materials and equipment require City approval, and schedules for precast units including manhole components must be provided by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DePAULI ENGINEERING & SURVEYING LLC
- CIVIL ENGINEERS AND LAND SURVEYORS -
TEL: (505)863-5440 WWW.DEPAULIENGINEERING.COM
for the
CITY OF GALLUP
McKINLEY COUNTY, NEW MEXICO
DATEBYNO.
TITLE SHEET
C A U T I O N
CALL NEW MEXICO ONE CALL
BEFORE YOU DIG!
CITY OF GALLUP, NEW MEXICO
TITLE SHEET 1-1
INDEX
SHEET NO.ITEM
GENERAL NOTES
APPROXIMATE
SCALE: 1"=2000'
US HIGHWAY 491
FUNDED BY: SAP 23-H2441-GF
FORMAL BID NO. ITB-2705
CITY OF GALLUP
WATER
LOADING
STATION
1-2
MORGAN CIRCLE
SEWER LINE
SHEET 2-1
SHEET
1 - 1
2-1
4 - 2 TO 4 - 4MISCELLANEOUS DETAILS
FORD CANYON PARK
SEWER LINE
SHEET 3-1
TO ALBUQUERQUE
6" PLAN & PROFILE STA 0+00 TO STA 1+30.0
MORGAN CIRCLE SEWER LINE
307 SOUTH 4th STREET GALLUP, NM 87301
BID LOT NO.
8" PLAN & PROFILE - STA 0+00 TO STA 4+71.0 3-12
I-40
EXIT 21
MORGAN CIRCLE & FORD CANYON PARK
SEWER LINE REPLACEMENT PROJECT
FORD CANYON PARK SEWER LINE
I-40
EXIT 22
CITY OF GALLUP
MORGAN CIRCLE & FORD CANYON PARK
SEWER LINE REPLACEMENT PROJECT
FORMAL BID NO. ITB-2705
4 - 5FENCING, GABION BOX & RIP-RAP DDETAILS -
4 - 1ADDITIONAL SEWER LINE DETAILS -
MORGAN CIRCLE
SCALE: 1"=50'
FORD CANYON
SCALE: 1"=100'
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
MKR
AutoCAD SHX Text
SHOWN
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text V:\ACTIVE DESIGN\MORGAN CIRCLE & FORD CANYON SEWER (2025)\CADD\MORGAN CIRCLE & FORD CANYON SEWERR1.1.DWG
AutoCAD SHX Text
EG KS
AutoCAD SHX Text
NOV. 2026
mrodriguez Stamp
DePAULI ENGINEERING & SURVEYING LLC
- CIVIL ENGINEERS AND LAND SURVEYORS -
for the
CITY OF GALLUP
McKINLEY COUNTY, NEW MEXICO
DATEBYNO.
GENERAL NOTES
C A U T I O N
CALL NEW MEXICO ONE CALL
BEFORE YOU DIG!
SHEET
1 - 2
23.
CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL DEVICES AS DESCRIBED IN USDOT/FHWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES ON ALL PARTS OF THE PROJECT UNDER CONSTRUCTION. THE DEVICES SHALL INCLUDE, BUT NOT BE LIMITED TO, TYPE 1 BARRICADES TYPE 2 BARRICADES, CONES, DRUMS, WARNING SIGNS, DETOUR SIGNS, NIGHT TIME FLASHERS AND PORTABLE FLASHERS. THE DEVICES SHALL BE MAINTAINED SEVEN (7) DAYS A WEEK FOR THE DURATION OF THE PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL MAINTAIN THE TRAFFIC CONTROL PLAN CONTAINED IN THE DRAWINGS AT ALL TIMES. CONTRACTOR SHALL MAKE ADJUSTMENTS TO THE TRAFFIC CONTROL PLAN DURING THE PROGRESSION OF WORK, TO ENSURE THAT LIFE AND PROPERTY ARE PROTECTED AT ALL TIMES.
PROPERTY CORNERS, BENCHMARKS AND CONTROL POINTS TO BE PROTECTED AT ALL TIMES. LOST OR DAMAGED POINTS DUE TO NEGLIGENCE
SHALL BE REPLACED AT THE CONTRACTORS EXPENSE.
SEWER LINE TIE-INS TO BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE PROJECT DRAWINGS AND SHALL INCLUDE ALL PIPE, SLEEVES, SPECIALS AND APPURTENANCES REQUIRED TO COMPLETE THE TIE-IN.
SEWER LINES AND MANHOLES SHALL BE TESTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND PROCEDURES ON SHEET 4-4.
ALL PIPING SHALL BE CLOSED AT WORK DAYS END TO PREVENT THE ENTRANCE OF INSECTS, MAMMALS AND REPTILES. CLOSURE SHALL ALSO BE SUCH AS TO PREVENT VANDALISM AND FLOOD DAMAGE. CLOSURE TO BE COVERED WITH EXCAVATED MATERIAL SO THAT THE END OF PIPE AND METHOD OF CLOSURE IS NOT VISIBLE. CLOSURE EFFORTS TO BE ESPECIALLY INTENSE ON WEEK ENDS.
CONTRACTOR SHALL TAKE PRECAUTIONS AS REQUIRED TO PREVENT DAMAGE TO THE ENVIRONMENT ADJACENT TO CONSTRUCTION.
CONTRACTOR TO REMOVE ONLY THE TREES, SHRUBS, GROUND COVER AND ROCK AS ABSOLUTELY NECESSARY TO COMPLETE THE PROJECT.
TREES, EXCESS ROCK AND SPOIL SHALL BE REMOVED AND PROPERLY DISPOSED OF, PROVIDED HOWEVER, THAT EXCAVATED ROCK MAY BE USED AS EROSION CONTROL AS DIRECTED. STAGING AREAS TO BE LIMITED TO AREAS WHERE CONSTRUCTION IS PLANNED, CONSTRUCTION R/WS OR AREAS PROPERLY SECURED FROM LANDOWNERS. ALL AREAS AFFECTED BY CONSTRUCTION TO BE PROPERLY CLEANED, GRADED AND DRESSED UPON COMPLETION. RE-SEEDING WILL BE REQUIRED IN SOME AREAS AS DIRECTED. CONTOUR DITCHES WILL BE REQUIRED AS DIRECTED TO PREVENT RUNOFF FROM TRAVELING ALONG PIPELINE TRENCH. CONTRACTOR SHALL CONTAIN CONSTRUCTION ACTIVITIES TO EXISTING CITY OF GALLUP, BUREAU RECLAMATION, OR PERMITTED NMDOT RIGHTS OF WAY AS SHOWN ON PROJECT DRAWINGS.
PIPELINE SHALL BE INSTALLED AT GRADES SHOWN. ADJUSTMENTS MAY BE REQUIRED TO MEET MINIMUM CLEARANCES AT UTILITY
CROSSINGS.
SOME EXCAVATED ROCK SPOIL MAY BE UTILIZED IN AREAS OF FILL (EXCEPT OVER PIPELINE) AS DETAILED ON PROJECT DRAWINGS AND/OR AS APPROVED BY THE ENGINEER. ROCK SPOIL TO BE "WALKED IN" PLACE WITH HEAVY SITE EQUIPMENT AND COVERED WITH SITE SURFACE
MATERIAL CALLED FOR.
CONTRACTOR SHALL OBTAIN A WORK PERMIT FOR ACTIVITIES WITHIN CITY RIGHT OF WAY. THE WORK PERMIT INCLUDES THE FOLLOWING:
1. CONTRACTOR PROVIDE INSURANCE CERTIFICATE NAMING THE CITY AS INSURED IN THE OF $1,000,000 PER OCCURRENCE FOR WORK
WITHIN CITY RIGHT OF WAY.
2. CONTRACTOR SHALL DEVELOP, SECURE APPROVAL OF, IMPLEMENT AND MAINTAIN A TRAFFIC CONTROL PLAN FOR WORK WITHIN' CITY
RIGHT OF WAY STAMPED BY A TRAFFIC CONTROL ENGINEER
COORDINATES SHOWN ARE REFERENCED TO CITY OF GALLUP
CONTROL SYSTEM WHICH IS BASED ON NMSP NAD 83, WEST ZONE
GROUND COORDS. WITH A COMBINED FACTOR OF 0.99968672.
BEARINGS SHOWN ARE GRID.
ELEVATIONS ARE BASED 1929 NGVD (VERTICAL DATUM)
WORKMANSHIP AND MATERIALS FOR ASPHALTIC PAVEMENT PATCH SECTION AND CONCRETE SHALL CONFORM TO THE LATEST EDITION OF THE NMDOT SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION, PROVIDED HOWEVER THAT
CITY SPECIFICATIONS CONTAINED HEREIN SHALL APPLY.
REMOVAL OF STRUCTURES AND OBSTRUCTIONS INCLUDING ASPHALT PAVEMENT, CONCRETE PAVEMENT, CULVERTS, TREES, SHRUBS, SIDEWALK, CURB & GUTTER, ROCK AND OTHER MISC. ITEMS THAT NEED TO BE REMOVED OR DISPOSED OF SHALL BE TAKEN TO DESIGNATED AREAS AND/OR AN APPROVED LANDFILL IN ACCORDANCE WITH PROVISIONS OF THE NEW MEXICO SOLID WASTE ACT PROVIDED HOWEVER, THAT RECYCLABLE MATERIAL MAY BE TAKEN TO APPROPRIATE COMPANIES.
WATER FOR CONSTRUCTION SHALL BE POTABLE WATER AND MAY BE TAKEN FROM THE CITY OF GALLUP EAST PUMP STATION LOCATED IMMEDIATELY NORTH OF INTERSTATE 40 AND APPROX. 1/2 MILE EAST OF FORD DRIVE IN THE CITY OF GALLUP.
WATER FOR SEWER LINE TESTING MAY BE TAKEN FROM A 2" HYDRANT AT THE YAH-TA-HEY PUMP STATION OR A HYDRANT DESIGNATED BY THE CITY WATER DEPT. WATER HAULING SHALL BE IN CLEAN, POTABLE WATER TANKERS. CONTRACTOR TO
COORDINATE WITH CITY WATER DEPARTMENT AS REQUIRED TO ACCESS WATER FACILITIES.
QUALITY CONTROL TESTING FOR PROJECT MATERIALS SHALL BE PERFORMED BY AN INDEPENDENT TESTING LAB AS HIRED BY THE CONTRACTOR. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 24 HOURS IN ADVANCE WHEN CONCRETE PLACEMENTS ARE SCHEDULED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE TESTING LAB WHEN COMPACTION TESTS ARE NEEDED AND WHEN CONCRETE PLACEMENTS ARE GOING TO BE MADE. THE CONTRACTOR SHALL PROVIDE THE TESTING LAB ACCESS AT ANY TIME FOR TESTING AT THE CONSTRUCTION SITE. THE CONTRACTOR SHALL
ASSIST THE TESTING LAB AS REQUIRED TO OBTAIN MATERIAL SAMPLES.
CONCRETE FOR THIS PROJECT SHALL BE 4000 PSI (28 DAY) CONCRETE WITH 4 1/2 - 7 1/2% ENTRAINED AIR. CONCRETE TO BE PLACED WITH NO MORE THAN 4" SLUMP WITH LIMITED WATER TO BE USED TO FACILITATE FINISHING. ALL REINFORCEMENT
FOR CAST IN PLACE CONCRETE SHALL BE GRADE 40 OR 60 DEFORMED BARS PER ASTM A615.
PROXIMITY DETAIL REQUIREMENTS AS SHOWN ON MISC. DETAIL SHEETS SHALL BE ADHERED TO. WATERLINES SHALL PASS OVER SEWER LINES, WHEN POSSIBLE. PIPE CUTS REQUIRED TO CENTER PIPE AT SEWER LINE CROSSINGS SHALL BE
CONSIDERED INCIDENTAL TO CONSTRUCTION.
THE CONTRACTOR SHOULD BE AWARE THAT NO CONSTRUCTION STAKING WILL BE CARRIED OUT UNTIL ALL UTILITY LOCATIONS ARE MARKED. THE CONTRACTOR SHOULD EXPECT THAT SOME SHIFTS IN ALIGNMENT WILL BE MADE TO AVOID EXISTING UTILITIES AND MEET PROXIMITY REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE EXPLORATORY EXCAVATION AT LOCATIONS SHOWN ON THE PROJECT DRAWINGS OR AS REQUIRED FOR ALIGNMENT CHANGES. WATER LINE STAKES SHALL BE PROVIDED BY THE OWNER ON A ONE TIME BASIS WITH CHECKS AS WORK PROGRESSES. ADDITIONAL OFFSETS AND REFERENCES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE WATERLINE STAKES WILL CONSIST OF CENTERLINE
OR OFFSET STAKES AS WELL AS STAKES AT SPECIAL FITTINGS AND FH LOCATIONS.
CONSTRUCTION STAKING: THE ENGINEER WILL PROVIDE THE FOLLOWING CONSTRUCTION STAKING:
A. SEWER LINES - CENTERLINE OR OFFSET STAKES AT APPROX. 50 FT., P.I.S AND APPURTENANCES, CONTROL FOR GRADE
STAKES WHERE GRADE IS CALLED FOR.
B. SITE GRADING - STAKES FOR MAJOR STRUCTURES W/ CUTS AND FILLS . BASIC SITE CONTROL AND BENCH MARK.
OCCASIONAL STAKE REPLACEMENT REQUIRED WHEN STAKES ARE UNAVOIDABLE LOST DUE TO CONSTRUCTION WILL BE REPLACED BY THE ENGINEER, PROVIDED HOWEVER, THAT THE COST OF STAKE REPLACEMENT DUE TO CARELESSNESS OR INATTENTIVE CONSTRUCTION AROUND SURVEY CONTROL WILL BE DEDUCTED FROM PAYMENT TO THE CONTRACTOR.
RANDOM BENCH MARKS WILL BE ESTABLISHED FOR USE BY THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR BLUETOP STAKING FOR SUBGRADE AND BASE COURSE. DETAILED MEASUREMENTS AND ELEVATIONS FOR STRUCTURES, DRAINAGE FLOW LINES AND PIPELINES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR WITH OCCASIONAL CHECKS BY THE ENGINEER. MEASUREMENT FOR DETERMINATION OF QUANTITIES SHALL BE ACCOMPLISHED
MUTUALLY BY THE ENGINEER AND CONTRACTOR.
BASE COURSE FOR STREET CONSTRUCTION SHALL BE NMDOT TYPE I. GRAVEL (BASE COURSE) FOR DETOURS OR DRIVEWAYS TO BE TYPE I OR TYPE II. (NOTE: TYPE II IS DEFINED IN OLDER NMDOT SPECS)
ALL ABANDONED LINES SHALL BE PLUGGED W/ CONCRETE AT TIE-IN LOCATIONS UNLESS OTHERWISE NOTED. REMOVE OLD VALVES WHERE CALLED FOR, OTHERWISE REMOVE VALVE CANS & COMPACT BACKFILL OR INSTALL FLOWABLE FILL WITH OLD VALVE TO BE CLOSED AND REMAIN IN PLACE. PROVIDE 10' MINIMUM HORIZONTAL SEPARATION OF WATER AND SEWER LINES.
PROVIDE 10' MINIMUM HORIZONTAL SEPARATION ON WATER AND SEWER LINES.
SUBMITTALS ARE REQUIRED FOR ALL MATERIALS AND EQUIPMENT PROPOSED FOR THE PROJECT WITH APPROVAL REQUIRED BY THE CITY. SCHEDULES FOR PRECAST UNITS INCLUDING MANHOLE BARRELS, CONES AND RIMS SHALL BE PROVIDED.
3.
SURVEY NOTES:
1.
2.
5.
4.
12.
16.
15.
13.
7.
6.
3.
2.
1.
GENERAL UTILITY CONSTRUCTION NOTES:
8.
9.
10.
11.
21.
22.
PARTIAL LIST OF INCIDENTALS:
14.
17.
18.
19.
20.
1. CONSTRUCTION STAKING - BLUE TOP STAKING FOR SUBGRADE AND BASE COURSE. CONTROL STAKES AS REQUIRED TO PLACE SAW CUTS IN CONCRETE PAVEMENT. MISC. STAKES AND MEASUREMENT FOR DETAILED CONSTRUCTION
OF STRUCTURES AND APPURTENANCES.
2. STORM WATER POLLUTION PREVENTION - PERMITS, NOTICES, PLANS, IMPLEMENTATION AND MAINTENANCE OF PLANS UTILIZING EROSION AND SEDIMENT CONTROL DEVICES PROVIDED SHALL BE CARRIED OUT FOR ALL PORTIONS
OF THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR S.W.P.P.P. DURING CONSTRUCTION.
3. PRIVATE LANDSCAPE - REPLACE SHRUBS, TREES, RAILROAD TIES AND RELOCATE DECORATIVE GRAVEL AS REQ'D.
4. TRAFFIC CONTROL - IMPLEMENTATION OF TRAFFIC CONTROL (BOTH PEDESTRIAN AND VEHICULAR) ACROSS ROADS OR PEDESTRIAN ACCESS ROUTES. THIS SHALL INCLUDE PEDESTRIAN FENCING AS NEEDED AROUND PARK
CONSTRUCTION.
5. BASE COURSE RAISED TO PAVEMENT LEVEL IN DRIVEWAYS AND STREETS FOR PUBLIC TRAVEL PRIOR TO PLACEMENT
OF PMBP.
6. LOCAL STANDBY PERSONNEL TO HANDLE 24 HOUR (INCLUDING WEEKENDS) EMERGENCIES.
7. PROPER DISPOSAL OF ALL TRASH, DEBRIS, AND WASTE INCLUDING HAULS TO DISPOSAL SITES AND GRADING. TREES AND SHRUB REMOVAL AS NEEDED FOR CONSTRUCTION INSTALLATION SHALL ALSO BE INCLUDED IN THIS INCIDENTAL
8. ROCK & OTHER EXCAVATION & LATERAL BACKFILL FOR REINFORCED CONCRETE STRUCTURES.
9. PRESSURE TESTING, DISINFECTION, BACTERIOLOGICAL TESTING, FLUSHING, COORDINATION WITH THE CITY AND NOTIFICATION OF THE PUBLIC FOR WATER LINE WORK. ALL WATER TO MEET NEW MEXICO WATER QUALITY CONTROL
COMMISSION (NMWQCC) REGULATIONS BEFORE DISCHARGE.
10. WATER HAULING AS REQUIRED FOR CONSTRUCTION AND DUST CONTROL.
11. EXCAVATION FOR UTILITIES & STRUCTURES FOR LOCATION & GRADE CHECKS AT PROPOSED UTILITY CROSSINGS AS
SHOWN ON PROJECT DRAWINGS.
12. PROTECTION & MAINTENANCE OF PRIVATE & PUBLIC PROPERTY DURING STORMS & RUNOFF THAT MAY BE MORE
VULNERABLE TO DAMAGE BECAUSE OF CONSTRUCTION.
13. MEASUREMENTS FOR PAY WILL BE BASED ON DESCRIPTION WITHIN THE CONTRACT SPECIFICATIONS
14. REMOVE AND RE-INSTALL EXISTING TRAFFIC SIGNS, GUARD RAILS AND MAIL BOXES
16. ADJUSTMENTS DUE TO EXISTING UTILITIES AND STRUCTURES OR TO MAINTAIN POSITIVE SLOPE WITH MINIMUM
BURY DEPTH.
17. PROTECTION OF HORIZONTAL AND VERTICAL CONTROL MONUMENTS.
18. MOBILIZATION FOR ALL PROJECT LOTS UNLESS OTHERWISE NOTED.
19. HAULING FOR PIPE BEDDING AND BACKFILL.
20. THE REMOVAL, REPLACEMENT AND/OR REPAIR OF DRAINAGE CULVERTS DAMAGED OR DISTURBED DURING
CONSTRUCTION ACTIVITIES.
21. THE REPLACEMENT AND/OR REPAIR OF IRRIGATION LINES DAMAGED OR DISTURBED DURING CONSTRUCTION
ACTIVITIES.
22. PROTECTION OF EXISTING GRASS TURF WITHIN THE PROJECT AREA TO THE GREATEST EXTENT POSSIBLE.
23. SECURING OF PROJECT SITES TO PREVENT UNAUTHORIZED PERSONNEL FROM ENTERING
PLAN SET LEGEND:
NO. DESCRIPTION NORTHING EASTING ELEV.
CONTROL POINTS
12" ROD W/ 13606 ALUM. CAP 1647070.77 2454490.68 6608.21
12" ROD W/ 13606 ALUM. CAP 1647008.63 2458037.01 6633.56
EXISTING PROPOSED
TREE
PROPERTY CORNER OR R/W MARKER
WATERLINE
SEWER LINE
MANHOLE
POWER POLE
DOWN GUY
SIGN
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC
GAS LINE
STORM DRAIN
WIRE FENCING
CHAIN LINK FENCING
WATERLINE GATE VALVE
MAIL BOX
WATER METER
TELEPHONE RISER
UNDERGROUND TELEPHONE
CONTROL POINT/ BENCH MARK
FORCE MAIN
CONTOURS
DRAINAGE FLOW LINE
AIR RELEASE VALVE
LIFT STATION
WATERLINE PLUG/CROSS/TEE
CULVERT AND END FLARE
INDIAN HEALTH SERVICE LINE (BY OTHERS)
307 SOUTH 4th STREET GALLUP, NM 87301
TEL: (505)863-5440 WWW.DEPAULIENGINEERING.COM
NM GAS COMPANY
IRMA BUSTAMANTE, SUPERINTENDENT
P.O. BOX 1369 (505-863-3857)
GALLUP, NEW MEXICO 87305
CITY OF GALLUP
TRANSWESTERN PIPELINE
PAT TRONCOSO (870-9419)
21 SPEEDWAY DR.
GALLUP, NM 87301
PUBLIC WORKS AND UTILITY OFFICIALS:
LAURENCE JOE, ENGINEER II DIANE WILLETO, ENGINEER
P.O. BOX 1270
GALLUP, NEW MEXICO 87305
(505) 409 8042 laurence.joe@centurylink.com diane.willeto@centurylink.com
(505) 573 1311
(505-863-3857) irma.bustamante@nmgco.com
RANDY FITZPATRICK, REGIONAL DIRECTOR
randy.fitzpatrick@nmgco.com
LUMEN (CENTURY LINK)
1907 BARBARA DRIVE (505-722-9232)
GALLUP, NEW MEXICO 87301
joy.francis@nmgco.com
JOY BABER, NW DISTRICT ENGINEER
(505-324-3737)
NMDOT, DISTRICT 6
1919 PINON DR. (505-290-8340)
MILAN, NEW MEXICO 87021
JAYSON GROVER, TRAFFIC ENGINEER
Jayson.Grover@state.nm.us
LISA VEGA, DISTRICT 6 ENGINEER
lisa.vega@state.nm.us 505-240-0531
STREET AND DRAINAGE
JOHN LASTYONA, INTERIM DIRECTOR
SATHYA GANESAN
(505-966-9781)
ELECTRIC DEPARTMENT
CHARLES NOURSE, ELECTRIC DIRECTOR
(505-863-1289)
UTILITIES ENGINEER
jlastyona@GallupNM.gov
PUBLIC WORKS
CHANCE PETERSON, CONSTRUCTION PROJECT MANAGER
(505-863-1283) cpeterson@GallupNM.gov sganesan@GallupNM.gov
FIRE DEPARTMENT
JOHN PAIRETT, FIRE MARSHALL
(505-726-5448) jpairett@gallupnm.gov
JERRY VARGAS
(505-966-9781)
WWTP CHIEF OPERATOR
jvargas@GallupNM.gov cnourse@GallupNM.gov
MARITA JOE, SENIOR ELECTRIC ENGINEERING TECH.
(505-863-1287) mjoe@GallupNM.gov
ABBREVIATIONS
GATE VALVE
MANHOLE
FIRE HYDRANT
STANDARD PROCTOR
AIR RELEASE STATION (TYPE 1 OR 2)
BUTTERFLY VALVE
MECHANICAL JOINT
RIGHTS-OF-WAY
RAILROAD
POINT-OF-INTERSECTION
AIR RELEASE VALVE
HORIZONTAL
POINT-OF-VERTICAL-INTERSECTION
NOT TO SCALE
AMERICAN WITH DISABILITIES ACT
POINT OF CURVATURE
POINT OF TANGENCY
CHAIN LINK FENCE
FLOW LINE
BACK OF CURB
DRIVEPAD
CUBIC YARD
EACH
POINT OF COMPOUND CURVE
ON CENTER
TYPICAL
DIAMETER
OUTER DIAMETER
INNER DIAMETER
CENTERLINE
ON CENTER EACH WAY
RADIUS
CURB AND GUTTER
SIDEWALK
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
EXISTING
FINISH GRADE, PROFILE GRADE
CITY OF GALLUP
DETECTABLE WARNING SURFACE
DUCTILE IRON
CURB DRAIN INLET
OVERHEAD ELECTRIC
STORM DRAIN
EFFLUENT
POLYVINYL CHLORIDE
CONCRETE
VALLEY GUTTER
HEADER CURB
PLANT MIX BITUMINOUS PAVEMENT
MODIFIED PROCTORAGGREGATE BASE COURSE
SEWER LINE
WATERLINE
TOP OF SIDEWALK
VOLATILE ORGANIC COMPOUND
PETROLEUM STORAGE TANK BUREAU
GRADE BREAK
LEFT
RIGHT
LENGTH
TOP OF WALL
SCHEDULE
TOP OF CURB
STATION
ASBESTOS CONCRETE
VITRIFIED CLAY
ALL PIPE BEDDING, BACKFILL (WHERE CALLED FOR SEE NOTE ), AND AS CALLED FOR IN THESE SPECIFICATIONS SHALL BE AN SELECT GRANULAR MATERIAL. THIS MATERIAL MAY BE TAKEN FROM ANY SUITABLE SOURCE. THE MATERIAL SHALL BE SANDY IN NATURE, FRIABLE WITH NO CLODS OR CLAY BALLS AND EXHIBIT MINIMAL "PUMPING" CHARACTERISTICS WHEN COMPACTED AT MOISTURE CONTENT SLIGHTLY BELOW OPTIMUM. IN ADDITION, MATERIAL SHALL MEET THE FOLLOWING REQUIREMENTS:
ACCEPTABLE SOURCES ON PAST PROJECTS INCLUDE THE FOLLOWING:
1. CRUSHER FINES FROM LOCAL AGGREGATE COMPANIES.
2. PUERCO RIVER, FROM LOCATIONS APPROVED BY THE CITY PUBLIC WORKS DIRECTOR.
3. LOCAL QUARRY OR STOCK PILE
4. ON-SITE MATERIAL MEETING THE GRADATION ABOVE
EXISTING UTILITIES: EXISTING UTILITIES SHOWN ARE FROM UTILITY COMPANY MAPS, EVIDENCE ON THE GROUND AND CONVERSATION WITH UTILITY COMPANY OFFICIALS. THE EXACT LOCATION AND SIZE OF SOME OF THE LINES ARE UNKNOWN.
CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION (HORIZONTAL AND VERTICAL) OF ALL UTILITIES BY CAREFUL EXCAVATION PRIOR TO TRENCHING. UTILITIES THAT ARE DAMAGED OR CUT SHALL BE REPAIRED BY THE CONTRACTOR AT HIS COST. THE CONTRACTOR SHALL CALL 811 FOR "LOCATES" ON ALL UTILITIES PRIOR TO CONSTRUCTION.
LINE MEASUREMENT AND BASIS OF PAYMENT - THESE ITEMS OF WORK CONSIST OF FURNISHING ALL MATERIALS, PLANT, EQUIPMENT AND LABOR IN INSTALLING PIPE OF THE DIAMETER AND MATERIAL SPECIFIED, COMPLETE WITH MAIN LINE FITTINGS CALLED FOR, APPURTENANCES AND TRENCHING, BEDDING AND BACKFILL, BUT DOES NOT INCLUDE PAVEMENT REMOVAL AND REPLACEMENT OR ROCK EXCAVATION. THE CONTRACTOR SHALL DEFLECT JOINTS VERTICAL AND HORIZONTAL AS REQUIRED (3° MAX DEFLECTION PER JOINT) TO MAINTAIN PIPE ALIGNMENT AND GRADES SHOWN. MEASUREMENT WILL BE BY THE LINEAR FOOT ALONG THE CENTERLINE OF THE PIPE THROUGH VALVES, MANHOLES, FITTINGS WITHOUT CORRECTION FOR SLOPE. PAYMENT WILL BE FOR THE ACTUAL LINEAR FEET OF PIPE INSTALLED AND IN PLACE AT THE CONTRACT UNIT PRICE BID FOR THE ITEM. THE REQUIRED CUTTING OF PIPE TO PROVIDE REQUIRED JOINT DISTANCE FROM WATER LINES AND DRAINAGE CULVERTS SHALL BE CONSIDERED INCIDENTAL TO THESE ITEMS. REQUIRED PRESSURE TESTING SHALL ALSO BE INCLUDED IN THESE ITEMS.
40 - 100
LESS THAN 35
1"
NO. 4
NO. 200
SIEVE SIZE PERCENT PASSING PI
LESS THAN 12
CITY OF GALLUP
MORGAN CIRCLE & FORD CANYON PARK
MORGAN CIRCLE
FORD CANYON PARK
KEEGAN MACKENZIE-CHAVEZ
(505-726-6104)
CITY PROJECT MANAGER
kmackenzie@GallupNM.gov
SEWER LINE REPLACEMENT PROJECT
STORM DRAIN MANHOLE
FORMAL BID NO. ITB-2705
24.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DRAWING FILE:
AutoCAD SHX Text
MKR
AutoCAD SHX Text
SHOWN
AutoCAD SHX Text
AutoCAD SHX Text mh
AutoCAD SHX Text ls
AutoCAD SHX Text
AutoCAD SHX Text tel
AutoCAD SHX Text
EVERGREEN
AutoCAD SHX Text
DECIDUOUS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GV
AutoCAD SHX Text
MH
AutoCAD SHX Text
FH
AutoCAD SHX Text S.P.
AutoCAD SHX Text
ARS
AutoCAD SHX Text
BF
AutoCAD SHX Text
MJ
AutoCAD SHX Text
R/W, ROW
AutoCAD SHX Text
RR
AutoCAD SHX Text
PI
AutoCAD SHX Text
ARV
AutoCAD SHX Text
HOR
AutoCAD SHX Text
PVI
AutoCAD SHX Text
NTS
AutoCAD SHX Text F.G., AutoCAD SHX Text P.G.
AutoCAD SHX Text
COG
AutoCAD SHX Text
ADA
AutoCAD SHX Text
PC
AutoCAD SHX Text
PT
AutoCAD SHX Text
CLF
AutoCAD SHX Text
FL
AutoCAD SHX Text
BC
AutoCAD SHX Text
DP
AutoCAD SHX Text
CY
AutoCAD SHX Text
EA
AutoCAD SHX Text
PCC
AutoCAD SHX Text
OC
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
DIA
AutoCAD SHX Text
OD
AutoCAD SHX Text
ID
AutoCAD SHX Text
AutoCAD SHX Text
OCEW
AutoCAD SHX Text R
AutoCAD SHX Text C&G
AutoCAD SHX Text
SW
AutoCAD SHX Text
MUTCD
AutoCAD SHX Text
EX.
AutoCAD SHX Text
DWS
AutoCAD SHX Text
DI
AutoCAD SHX Text
CDI
AutoCAD SHX Text
OE
AutoCAD SHX Text
SD
AutoCAD SHX Text
EFF.
AutoCAD SHX Text
PVC
AutoCAD SHX Text
CC
AutoCAD SHX Text
VG
AutoCAD SHX Text
HC
AutoCAD SHX Text
PMBP
AutoCAD SHX Text M.P.
AutoCAD SHX Text
ABC
AutoCAD SHX Text
SL
AutoCAD SHX Text
WL
AutoCAD SHX Text
TSW
AutoCAD SHX Text
VOC
AutoCAD SHX Text
PTSB
AutoCAD SHX Text
GB
AutoCAD SHX Text
LT
AutoCAD SHX Text
RT
AutoCAD SHX Text L
AutoCAD SHX Text
TOW
AutoCAD SHX Text
SCH.
AutoCAD SHX Text
TOC
AutoCAD SHX Text
STA.
AutoCAD SHX Text
AC
AutoCAD SHX Text
VC
AutoCAD SHX Text V:\ACTIVE DESIGN\MORGAN CIRCLE & FORD CANYON SEWER (2025)\CADD\MORGAN CIRCLE & FORD CANYON SEWERR1.1.DWG
AutoCAD SHX Text
SD
AutoCAD SHX Text
EG KS
AutoCAD SHX Text
NOV. 2026
File details come from the government source that posted it. Updated .