Gallup_Municipal_ROW-Public_Easement_Work_Permit.pdf
PDF 6 MB Posted
- Solicitation number
- ITB-2705
- Issued by
- Mckinley County, New Mexico
About this file
This is a Right-of-Way Public Easement Work Permit issued by the City of Gallup, New Mexico, related to the Morgan Circle & Ford Canyon Park Sewer Line Replacement Project. The permit authorizes work within public right-of-way and easements necessary to complete sewer line installation and replacement activities. The Morgan Circle phase involves installing 130 linear feet of new 6-inch SDR 35 PVC sewer line with associated manholes, trenching, backfilling, bypass pumping, and service abandonment, along with additional backfill, finished grading, and rip rap installation. The Ford Canyon Park phase consists of installing 470 linear feet of new 8-inch SDR 35 PVC sewer line with manholes, trenching, backfilling, and abandonment of existing lines, with sod replacement required upon completion.
The permit establishes the conditions and requirements for work to proceed within City of Gallup public rights-of-way and easements, including standard provisions for traffic control, restoration, and coordination with municipal utilities and services. The permitting document serves as authorization for the contractor to access and work within designated public areas while maintaining compliance with local municipal codes and regulations governing public easement usage and restoration requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .