Affidavit_of_Wages_Paid.pdf

PDF 111 KB Posted

Attached to
Morgan Circle & Ford Canyon Park Sewer Line Replacement Project
Solicitation number
ITB-2705
Issued by
Mckinley County, New Mexico

About this file

The Affidavit of Wages Paid is a form required by the State of New Mexico for the Morgan Circle & Ford Canyon Park Sewer Line Replacement Project, a public works initiative involving sewer line installation and rehabilitation at two separate locations. The document must be completed and submitted to the contracting agency upon project completion and serves as certification that all workers employed on the project received no less than the prevailing wage rates established by the Department of Workforce Solutions, Labor Relations Division. The form requires information from general contractors, subcontractors, and any additional tier subcontractors, including company details, project completion dates, and signatures from each party certifying compliance with prevailing wage requirements. The project consists of installing 130 linear feet of 6-inch SDR 35 PVC sewer line at Morgan Circle with associated work including manholes, trenching, backfilling, bypass pumping, and service abandonment, and 470 linear feet of 8-inch SDR 35 PVC sewer line at Ford Canyon Park with similar infrastructure work and sod replacement.

Contractors who fail to comply with New Mexico's Prevailing Wage Laws, including violations such as incorrect job classification, improper payment of prevailing wages, or overtime violations, are subject to debarment procedures and are required to pay any back wages owed to workers under the authority of the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78). A separate signed affidavit form must be submitted for each contractor tier involved in the project, with general contractors providing their signature and state wage decision number, subcontractors providing their completion date and signature, and additional tier subcontractors providing their completion date and signature. The form was last revised on August 23, 2013, and all documentation must be transmitted directly to the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFFIDAVIT OF WAGES PAID

To Be Completed After Construction Is Complete

All FIELDS ARE REQUIRED

FORM MUST BE SENT TO THE CONTRACTING AGENCY

General Contractor Information Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Estimated Completion Date: State Wage Decision Number:

Project Title:

Project Physical Address:

Print Name:

General Contractor Signature:

Sub Contractor Information

Date you completed work on this project:

Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Sub Contractor Signature:

2nd, 3rd, etc. Tier Sub Contractor Information

Date you completed work on this project:

Company Name:

Address:

City: State: Zip:

Phone: Fax: E-Mail:

Tier Signature:

I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).

Contractor’s Signature Date

(Revised 08/23/13)

INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID

GENERAL CONTRACTOR

1. Enter general contractor information and provide signature.

2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)

3. Enter project title - listed in bid documents.

4. Enter project physical address - exact location of project (job site).

5. Enter completion date of project.

6. All Affidavits’ must be sent to the Contracting Agency.

SUB CONTRACTOR

1. Enter general contractor information, but general contractor signature is not needed.

2. Enter sub contractor information as indicated and provide signature.

3. Enter sub contractor completion date.

NOTE: A separate signed form is needed for each contractor.

2ND, 3rd, etc TIER SUB CONTRACTOR

1. Enter sub contractor information, subcontractor signature is not needed.

2. Enter 2nd tier sub contractor information and provide signature.

3. Enter 2nd tier contract completion date.

(Revised 8/23/13)