Main street streetscape improvements

Closed State & local contract opportunity Posted

Solicitation number
PE-66061-NONST-2027-000000099
State
Georgia
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 26
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Fulton County, Georgia is soliciting bids under Invitation to Bid ITB 27-70 for the Main Street Streetscape Improvements project, a pavement rehabilitation effort within the project limits, with bids due November 10, 2026. The construction plans were prepared by MetroCorp Development Enterprises, Inc. for the City of College Park and related agencies.

The work addresses pavement deterioration, repairs damaged areas, improves surface conditions, and extends the service life of existing pavement. The plans include demolition of a raised-floor parklet with 750 square feet of asphalt milling, concrete sidewalk flumes, header curbs, catch basin casting adjustments, and surface-mounted delineators. Civil sheets cover demolition, grading and drainage, utilities, site construction standard details, and erosion and sediment control across sheets C0.0 through C6.6. The total site is 12,000 square feet (0.275 acres), with 1,135 square feet (0.03 acres) disturbed. The contractor must furnish and install two 12-foot by 7-foot FOD mats at construction exits and return them to the City at completion.

Materials and methods must conform to Georgia Department of Transportation Standard Specifications and City of College Park standards and specifications. The contractor performs utility location verification and notifies utility companies, and must provide an environmentally approved debris disposal site at no additional cost to the City or Department. All borrow and waste sites require environmental approval before construction. Erosion and sediment control must be maintained throughout the project, and disturbed areas left exposed for more than 14 days require stabilization with mulch or temporary seeding. The engineer renders decisions on unforeseen complications or construction changes within 48 hours. Re-permitting coordination is provided at no cost to the owner or engineer, unless compensation is required for design changes.

The plans list an approximate start date of July 1, 2026, an approximate completion date of September 30, 2026, and a three-month construction timeline. The solicitation was posted October 28, 2026.

Opportunity text

The purpose of this project is to improve the condition, safety, and appearance of existing pavement within the project limits. The work will address pavement deterioration, repair damaged areas, improve surface conditions, and extend the service life of existing pavement, enhancing the overall functionality and appearance of the surrounding area.