ITB - Construction of Lauder Stormwater Detention Basin (Compartment 2) for Harris County Flood Control District (CDBG-DR/GLO)

Closed State & local contract opportunity Posted

Solicitation number
25/0394
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from harriscountytx.bonfirehub.com. Updated .

About this opportunity

Harris County Flood Control District is seeking a construction contractor for the Lauder Stormwater Detention Basin (Compartment 2) project, a flood control infrastructure development located in north central Harris County, Texas. The project involves excavating approximately 555,891 cubic yards of material to create a 44-acre detention basin with a maximum depth of 16 feet and 3H:1V side slopes, along with installing a 72-inch diameter, 270-foot-long Reinforced Concrete Pipe (RCP) structure connecting Compartments 1 and 2. The work includes trenchless and open-cut construction methods, concrete channel lining, riprap installation, access road construction, and site stabilization through hydromulch and sodding. The project is funded through the Texas General Land Office's Community Development Block Grant Disaster Recovery (CDBG-DR) Program and has a 270-calendar-day completion period with liquidated damages of $5,000 per day for delays. The bid due date is January 12, 2026, with a pre-bid conference scheduled, and bidders must submit all required documentation through the Bonfire platform, including detailed references, proof of workers' compensation insurance, and compliance with federal and state regulations.

The procurement includes several set-aside and participation requirements for disadvantaged businesses, specifically mandating Minority- and Women-Owned Business Enterprise (M/WBE) participation with detailed compliance guidelines. Contractors must meet Section 3 requirements, with goals of having 25% of total labor hours performed by Section 3 workers and 5% by targeted Section 3 workers. The project has a prevailing wage requirement under Davis-Bacon Act standards, with a minimum wage of $21.65 per hour established by Harris County's Contractor Minimum Wage policy. While no specific incumbent vendors are mentioned, the contract requires contractors to perform a minimum of 25% of work with their own forces. The project manual indicates performance and payment bonds equal to 100% of the contract price are required, with insurance requirements including various liability coverages. Though an exact budget is not specified, the comprehensive requirements and extensive scope suggest a substantial project value, likely in the multi-million dollar range, with potential for contracts exceeding $100,000 subject to additional federal compliance regulations.

Opportunity text

Construction of Lauder Stormwater Detention Basin (Compartment 2) for Harris County Flood Control District (CDBG-DR/GLO) - Project ID P500-06-00-E007

Files

File Type Posted
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
6-Attachment K - Payment Bond.pdf PDF
13-Attachment G - Contractor Profile.pdf PDF
24-Attachment U - Project Manual.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
14-Attachment Q - Section 3 Bid Requirements.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
16-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
25-Attachment S - Plans Drawings.pdf PDF
26-Federal IFB General Conditions and Specifications - Construction.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
21-Attachment V - Project Sign Plaques.pdf PDF
11-Attachment T - General Conditions.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
18-Attachment O - Davis Bacon Current Wage Decision.pdf PDF
20-Attachment M - Minimum Insurance Requirements.pdf PDF
23-Attachment CC - MWBE Utilization Plan Commitment Form.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
27-Attachment AA - Geotechnical Report.pdf PDF
15-Attachment A - Bid Addenda Acknowledgement.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
22-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
4-Attachment F - References.pdf PDF
Show all 27

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors