10-Attachment FF - Heat Protection Safety Requirements.pdf

PDF 43 KB Posted

Attached to
ITB - Construction of Lauder Stormwater Detention Basin (Compartment 2) for Harris County Flood Control District (CDBG-DR/GLO)
Solicitation number
25/0394
Issued by
Harris County, Texas

About this file

This attachment outlines heat protection safety requirements for the Construction of Lauder Stormwater Detention Basin (Compartment 2) project being executed for the Harris County Flood Control District in Texas under CDBG-DR/GLO funding. The Prime Contractor must incorporate comprehensive weather-related safety provisions into the project Safety Plan to protect workers from heat-related illnesses, cold-related illnesses, and other adverse weather conditions. When temperatures or heat index values exceed 90 degrees Fahrenheit, the contractor must implement a project-specific Heat Awareness Plan that includes provisions for worker acclimatization, water availability, rest periods, and shade.

The contractor's acceptance of these heat protection safety requirements is mandatory, with acknowledgment required at the time of bid submission through signature on the Bid Acknowledgement form. During extended periods of adverse weather conditions, the Prime Contractor has discretion to provide additional accommodations to workers as deemed necessary to ensure safety and welfare on the job site.

View the file

Other files

File Type Posted
6-Attachment K - Payment Bond.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
26-Federal IFB General Conditions and Specifications - Construction.pdf PDF
18-Attachment O - Davis Bacon Current Wage Decision.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
21-Attachment V - Project Sign Plaques.pdf PDF
4-Attachment F - References.pdf PDF
23-Attachment CC - MWBE Utilization Plan Commitment Form.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
13-Attachment G - Contractor Profile.pdf PDF
27-Attachment AA - Geotechnical Report.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
16-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
14-Attachment Q - Section 3 Bid Requirements.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
24-Attachment U - Project Manual.pdf PDF
20-Attachment M - Minimum Insurance Requirements.pdf PDF
15-Attachment A - Bid Addenda Acknowledgement.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
22-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
25-Attachment S - Plans Drawings.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
11-Attachment T - General Conditions.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .