25-Attachment S - Plans Drawings.pdf
PDF 57 MB Posted
- Solicitation number
- 25/0394
- Issued by
- Harris County, Texas
About this file
This file contains plans and drawings for the construction of Lauder Stormwater Detention Basin (Compartment 2), a project under the Harris County Flood Control District funded through Community Development Block Grant-Disaster Recovery (CDBG-DR) grants administered by the Texas General Land Office (GLO). The project, identified as P500-06-00-E007, involves the design and construction specifications for stormwater detention infrastructure intended to manage and mitigate flooding impacts in the Harris County area. The attachment provides detailed architectural and engineering drawings that outline the site layout, structural components, drainage systems, and construction methodologies required for the basin compartment. These plans serve as the technical basis for the Invitation to Bid (ITB) and establish the specifications that bidding contractors must follow to ensure compliance with project requirements and engineering standards.
The drawings and plans document engineering specifications, site conditions, and construction requirements that form the foundation for contractor bid submissions and project execution. As part of a CDBG-DR funded initiative, the project is subject to federal funding requirements and oversight by the Texas GLO, which may impose additional compliance, reporting, and performance standards. Qualified bidders must demonstrate the ability to meet the technical specifications outlined in these plans while adhering to applicable federal regulations governing disaster recovery funding and construction standards.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .