25-Attachment S - Plans Drawings.pdf

PDF 57 MB Posted

Attached to
ITB - Construction of Lauder Stormwater Detention Basin (Compartment 2) for Harris County Flood Control District (CDBG-DR/GLO)
Solicitation number
25/0394
Issued by
Harris County, Texas

About this file

This file contains plans and drawings for the construction of Lauder Stormwater Detention Basin (Compartment 2), a project under the Harris County Flood Control District funded through Community Development Block Grant-Disaster Recovery (CDBG-DR) grants administered by the Texas General Land Office (GLO). The project, identified as P500-06-00-E007, involves the design and construction specifications for stormwater detention infrastructure intended to manage and mitigate flooding impacts in the Harris County area. The attachment provides detailed architectural and engineering drawings that outline the site layout, structural components, drainage systems, and construction methodologies required for the basin compartment. These plans serve as the technical basis for the Invitation to Bid (ITB) and establish the specifications that bidding contractors must follow to ensure compliance with project requirements and engineering standards.

The drawings and plans document engineering specifications, site conditions, and construction requirements that form the foundation for contractor bid submissions and project execution. As part of a CDBG-DR funded initiative, the project is subject to federal funding requirements and oversight by the Texas GLO, which may impose additional compliance, reporting, and performance standards. Qualified bidders must demonstrate the ability to meet the technical specifications outlined in these plans while adhering to applicable federal regulations governing disaster recovery funding and construction standards.

View the file

Other files

File Type Posted
6-Attachment K - Payment Bond.pdf PDF
12-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
26-Federal IFB General Conditions and Specifications - Construction.pdf PDF
18-Attachment O - Davis Bacon Current Wage Decision.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
21-Attachment V - Project Sign Plaques.pdf PDF
4-Attachment F - References.pdf PDF
23-Attachment CC - MWBE Utilization Plan Commitment Form.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
13-Attachment G - Contractor Profile.pdf PDF
27-Attachment AA - Geotechnical Report.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
16-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
14-Attachment Q - Section 3 Bid Requirements.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
24-Attachment U - Project Manual.pdf PDF
20-Attachment M - Minimum Insurance Requirements.pdf PDF
15-Attachment A - Bid Addenda Acknowledgement.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
22-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
11-Attachment T - General Conditions.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .