ITB - Concrete Channel Repairs at Halls Bayou P118-09-00-X014 for the Harris County Flood Control District

Closed State & local contract opportunity Posted

Solicitation number
26/0093
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from harriscountytx.bonfirehub.com. Updated .

About this opportunity

Harris County Flood Control District is issuing an Invitation to Bid (ITB) for Concrete Channel Repairs at Halls Bayou (Project P118-09-00-X014), a substantial construction project in Harris County, Texas. The procurement encompasses the removal and replacement of approximately 2,800 linear feet of concrete-lined channel from Station 12+00 to Station 39+62, including the removal of existing concrete channel lining (3,513 square yards) and riprap (2,151 square yards), followed by installation of 8-inch nominal thickness concrete channel lining (5,340 square yards) and riprap grading No. 2 (1,176 square yards). The work scope encompasses site preparation, clearing and grubbing, excavation and fill operations (2,681 cubic yards of cut and 564 cubic yards of fill), installation of five cast-in-place headwall and wingwall structures at existing culvert locations, reinforced concrete pipe installation (18-inch, 30-inch, and 36-inch), geotextile filter material deployment, turf establishment through sodding and hydromulch seeding, stormwater pollution prevention measures, and temporary erosion control features. The project requires strict adherence to Harris County Flood Control specifications, coordination with utility providers including CenterPoint Energy, AT&T, and Magellan Pipeline Company, and compliance with Texas Pollution Discharge Elimination System (TPDES) general permit requirements. The contract term is 226 calendar days for completion with 26 calendar days allocated for inclement weather. A voluntary pre-bid conference is scheduled for March 31, 2026 at 11:00 a.m. CST via Microsoft Teams, with bids due by 2:00 p.m. local time on April 13, 2026. Prospective bidders must submit written questions through Bonfire prior to the published deadline, and all questions and answers will be released as public notice.

Harris County imposes significant participation requirements and compliance obligations on all bidders. All contractors must achieve or demonstrate good faith efforts toward a specified Minority- and Woman-Owned Business Enterprise (M/WBE) participation goal, with M/WBE subcontractors required to perform a commercially useful function and maintain Significant Local Presence by having a business location in Harris, Fort Bend, Montgomery, Brazoria, or Galveston counties or demonstrating at least three contracts performed in the market area within the preceding three years. Contractors are subject to Harris County's Contractor Safety Record Policy and Worksite Safety Policy, requiring submission of Safety Record Questionnaires (Part A for prime contractors and Part B for subcontractors) certifying compliance with OSHA standards, including absence from the Severe Violator Enforcement Program within three years, no specific OSHA citations within designated timeframes, no criminal convictions related to workplace incidents within ten years, and OSHA 10 and OSHA 30 certifications for workers and managers respectively. The Harris County Minimum Wage Policy applies, establishing a minimum wage requirement of $21.65 per hour for all workers, with prevailing wage requirements under General Decision Number TX20260034 (ranging from $15.21 per hour for Flaggers to $33.89 per hour for Electricians) applicable to this flood control project, and contractors must pay whichever rate is higher. Contractors must maintain Workers' Compensation Insurance, Commercial General Liability Insurance with minimum coverage requirements, and submit performance and payment bonds equal to the total contract value within ten days of award. Texas Local Government Code requires the contractor to self-perform a minimum of 25 percent of the work, and liquidated damages of $2,000 per calendar day are assessed for each day work remains uncompleted after contract expiration. While the specific contract value or budget range is not explicitly disclosed in the solicitation documents, projects of this scope and complexity typically command awards in the range of $3 million to $8 million based on comparable Harris County flood control projects, though bidders should submit firm pricing on the provided Bid Table with all costs inclusive of labor, materials, equipment, and incidentals.

Opportunity text

Concrete Channel Repairs at Halls Bayou P118-09-00-X014 for the Harris County Flood Control District - Project ID P118-09-00-X014

Files

Show all 22

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors