18-Report File.pdf

PDF 25 MB Posted

Attached to
ITB - Concrete Channel Repairs at Halls Bayou P118-09-00-X014 for the Harris County Flood Control District
Solicitation number
26/0093
Issued by
Harris County, Texas

About this file

Summary

This document set comprises a Letter of No Objection from Magellan Pipeline Company, L.P. and associated construction plans for concrete channel repairs at Halls Bayou (HCFCD Project ID P118-09-00-X014) for the Harris County Flood Control District in Texas. The project involves concrete channel lining repair work extending approximately 28 linear feet from Station 11+50 to Station 39+62, including removal and disposal of existing concrete channel lining and riprap, installation of 8-inch thick concrete channel lining, placement of riprap grading, and restoration of disturbed areas. The scope of work encompasses clearing and grubbing, excavation totaling approximately 2,680 cubic yards of cut and 564 cubic yards of fill, installation of reinforced concrete pipe culverts at multiple crossing locations, and implementation of stormwater pollution prevention measures. The project requires compliance with Harris County Flood Control District specifications and incorporates detailed cross-sections, material specifications, and construction staging plans across 42 drawing sheets.

Magellan Pipeline's conditional consent is granted for a 120-day period beginning at the commencement of construction, with the crossing work required to commence on or before June 3, 2026. The contractor must maintain a minimum clearance of 1.5 times the pipe diameter (minimum 2 feet) from Magellan's 16-inch and 20-inch pipelines, install laminated mats where required, and provide continuous inspection and support of exposed pipeline segments exceeding 20 feet. The contractor must call Magellan's representative (Antonio Domino, Sr. at 281-607-6521) with a minimum 48-hour advance notice before construction activities and comply with all cathodic protection requirements. The contractor assumes full indemnification obligations to Magellan, protecting the company from claims arising from any breach of the crossing agreement or activities related to the pipeline crossing, except for damages caused by Magellan's negligence or willful misconduct.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/3/2026

Attention: Harris County Flood Control District

RE: Letter of No Objection Pipeline Crossing – CORSICANA - E HOUSTON 16IN; COLORADO CITY - EAST

HOUSTON 20IN

Location: LAT: 29.8565 LONG: -95.2923

Dear Harris County Flood Control District:

Magellan Pipeline Company, L.P. (“Magellan”) grants conditional consent to Harris County Flood Control District (the “Company”) for a period of one hundred twenty (120) days beginning at the date of commencement of construction of CONCRETE CHANNEL REPAIR under and perpendicular to MAGELLAN’s 16 & 20 inch pipelines in Harris County, Texas (the “Crossing”) as shown on the drawing attached hereto as Exhibit “A”, named HCFCD PROJECT ID# P118- 09-00-X014 CONCRETE CHANNEL REPAIR HCFCD UNIT# P118-09-00subject to the following conditions:

1. Except as otherwise specifically permitted hereunder, Company agrees not to build, create or construct any permanent obstruction, engineering works or other structures over MAGELLAN’s pipeline, or rights-of-way (ROW”), nor permit same to be done by others. The phrase “engineering works or other structures” shall include, but not be limited to, buildings, sheds, homes, fences, parking areas (shelled or paved), signs, trees, bushes and sidewalks. Company shall comply with the requirements attached as Exhibit B. Unless specifically approved by MAGELLAN, to the extent that any of the requirements set forth in Exhibit B conflict with or are more stringent than the requirements set forth herein, the more stringent requirements shall have priority.

2. More particularly, the Company Facilities will cross at as close to a ninety (90) degree angle as reasonably possible (and in no event at less than a forty-five (45) degree angle) above MAGELLAN’s pipeline as shown in the attached drawing. In the case of a pipeline laid by open cutting, a minimum clearance of one and one-half (1.5) times the diameter of the largest pipe, but with at least two (2) feet of separation from MAGELLAN’s pipeline is required, and both MAGELLAN and Company shall install a CP test station at the crossing. If the pipeline is laid using a bore technique, the minimum clearance shall be four (4) feet from the bottom of MAGELLAN’s pipeline, and a viewing window shall be utilized. If supplying a viewing window is not possible, MAGELLAN shall be notified prior to bore commencement and the parties shall agree upon a reasonable alternative thereto.

Under no circumstances shall dirt or other debris be piled over MAGELLAN’s pipeline, and anytime Company is crossing and/or working over MAGELLAN’s pipeline, Company shall lay laminated mats, where required by MAGELLAN.

Equipment to be used for excavation shall be inspected and approved by MAGELLAN’s Representatives prior to commencement of excavation activities.

3. All exposed portions of MAGELLAN’s pipeline will be visually inspected for damage by MAGELLAN personnel and/or a MAGELLAN contract inspector (collectively, “MAGELLAN’s Representatives”) and any span of exposed pipeline longer than twenty

(20) feet shall be supported. MAGELLAN’s Representatives must be present during excavation, ongoing activities within the ROW, and the back filling process of the site.

4. Where the Company Facilities cross MAGELLAN’s pipeline, said crossing will be constructed under standards and specifications submitted by Company to MAGELLAN for written approval, which approval must be obtained prior to construction. COMPANY

UNDERSTANDS AND AGREES THAT ANY DEVIATIONS FROM SAID

STANDARDS OR SPECIFICATIONS, OR NONCOMPLIANCE WITH ANY

REQUIREMENTS CONTAINED IN THIS LETTER OF NO OBJECTION, WILL

PERMIT MAGELLAN, AT ITS SOLE OPTION, TO NOTIFY COMPANY THAT

COMPANY’S RIGHTS UNDER THIS LETTER OF NO OBJECTION HAVE

BEEN TERMINATED.

5. Company agrees that where the Company Facilities cross MAGELLAN’s pipeline, MAGELLAN will not be liable for repair to Company Facilities, or any loss of service which may occur, due to any repair to, maintenance of, any other activity concerning MAGELLAN’s pipeline or related facilities except to the extent of damage or loss caused by the negligence or willful misconduct of MAGELLAN.

6. MAGELLAN requires that, prior to commencement of Company’s construction activities the appropriate “One Call” notices shall be given and that MAGELLAN shall additionally be directly notified by Company a minimum of forty-eight (48) hours in advance. Each notice shall identify the location and facility to be crossed, and afford MAGELLAN’s Representatives the opportunity to be on site to inspect said activities.

The representative of MAGELLAN who shall be notified is Antonio Domino, Sr.

(or such other individual as MAGELLAN may in the future designate) at phone number 281-607-6521 , or at such other phone number as MAGELLAN may in the future designate.

7. COMPANY COVENANTS AND AGREES TO INDEMNIFY, DEFEND AND

FOREVER HOLD HARMLESS MAGELLAN, ITS PARTNERS, MEMBERS,

OFFICERS, DIRECTORS, AFFILIATES, AGENTS, EMPLOYEES,

REPRESENTATIVES, SUCCESSORS AND ASSIGNS (COLLECTIVELY,

“MAGELLAN INDEMNITEES”), FROM AND AGAINST EACH AND EVERY

CLAIM, JUDGMENT, SUIT, COST (INCLUDING ALL REASONABLE

ATTORNEYS’ FEES, COURT COSTS AND COSTS OF DEFENSE), DEMAND,

AND CAUSE OF ACTION IN ANY WAY ARISING OUT OF ANY ACTIVITY

RELATING TO THE CROSSING FOR WHICH THIS LETTER OF NO

OBJECTION IS GRANTED AND/OR FROM ANY BREACH BY COMPANY

OFANY PROVISION OF THIS LETTER OF NO OBJECTION INCLUDING

BUT NOT LIMITED TO ANY CONCERNING PERSONAL INJURY

(INCLUDING DEATH), PROPERTY DAMAGE AND/OR OTHER DAMAGES,

EXCEPT TO THE EXTENT SUCH CLAIM, JUDGMENT, SUIT, COST,

DEMAND OR CAUSE OF ACTION ARISES OUT OF THE NEGLIGENCE OR

WILLFUL MISCONDUCT OF A MAGELLAN INDEMNITEE.

8. Company agrees that MAGELLAN’s pipeline(s) are or may be cathodically protected and that Company will not operate and maintain its facilities in any manner that would interfere in any way with the cathodic protection of MAGELLAN’s pipeline(s). Company also agrees that MAGELLAN will have no liability to Company or any third party as a result of any damages or other adverse effects which MAGELLAN’s cathodic protection may have on the Company’s facilities or third party properties now or in the future. Cathodic test leads stations must be installed on the Company facilities where required by MAGELLAN.

Additionally, Company shall reimburse MAGELLAN for the reasonable costs of any close interval surveys or similar activities that MAGELLAN may deem (now or in the future) to be necessary due to the presence of the Company facilities. Company, in carrying out its work as described above, shall consult MAGELLAN’s Representatives. Additionally, Company shall (in the course of its excavating) cooperate with MAGELLAN so as to enable MAGELLAN to place any protective device on MAGELLAN’s pipeline that MAGELLAN may deem necessary.

9. Prior to commencing any work relevant hereto, Company agrees to obtain all licenses, permits and approvals required by all third parties, including governmental bodies and that all work shall be conducted in accordance with all applicable laws, rules, regulations and orders of all governmental bodies having or claiming jurisdiction.

10. Company agrees that MAGELLAN’s execution of this Letter of No Objection does not, and will not be deemed to grant approval, as to any matter on behalf of any person or entity other than MAGELLAN. Without limiting the foregoing, Company expressly recognizes that Company is solely responsible for obtaining any necessary easements from the fee owner(s) of the relevant real property.

11. Nothing contained herein shall be deemed to constitute MAGELLAN’s consent to any activities of Company other than those necessary to accomplish the work herein described.

12. If Company does not commence the construction activity subject hereto by on or before

6/3/2026, this Letter of No Objection shall terminate and be of no further force or effect.

13. By acceptance of this Letter of No Objection Company agrees to all of the terms and conditions contained herein. Company’s construction of the Crossing subject hereto shall be deemed for all purposes to constitute Company’s acceptance of this Letter of No Objection.

Any waiver of any specific portion of the above must be in writing and in no way shall waive any other part of this Letter of No Objection.

Sincerely, Magellan Pipeline Company, L.P.

Aaron Blair Real Estate Services Manager

EXHIBIT A

Drawing of Crossing

(including exact location)

VI

C

IN

IT

Y M

A P

PC

T

KE

Y M

AP

P

G . 4

A, W

0 K at y F re ew ay

Su ite

0.4

.10

Ho us to n, T

X

PL

AN

S

ET

P R

EP

AR

ED

B

Y:

LO

C

A

TI

O N

M A

P N

.T .S

P1

-0 9-

-E

C O

U N

TY

J

U D

G E

LI

N

A H

ID

AL

G O

EX

EC

U

TI

VE

D

IR

EC

TO

R

C

H R

IS

TI

N A

(T

IN

A) P

ET

ER

SE

N

, P H

D , P

.E

PC

T.

R

O D

N

EY

E

LL

IS

PC

T.

A D

R

IA

N G

AR

C

IA

PC

T.

T O

M S

. R

AM

SE

Y, P .E

PC

T.

LE

SL

EY

B R

IO

N

ES

PR

O

JE

C

T

LO

C A

TI

O

N

H C

FC

D

P R

O

JE

C T

ID

P

8-

-0 0-

X0

C O

N C

R

ET

E C

H A

N N

EL

R

EP

A

IR

H

C

FC

D U

N

IT

P1

-0

9-

N

N

HALL

S BAYOU

(P11 8-0

0-0 0)

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

DRAWING INDEX AND QUANTITY TABLE

SB

PG

NW

JA

N

. 2

N O

N E

IN

D

EX

O

F

SH

EE

TS

SH

EE

T

TI

TL

E

R

EV

D

A

TE

C

O

VE

R S

H

EE

T

D

R

AW

IN

G

IN

D

EX

A

N D

Q U

AN

TI

TY

T

AB

LE

G

EN

ER

AL

N

O

TE

S (1

O F

2)

G

EN

ER

AL

N

O

TE

S (2

O F

2)

PR

O

JE

C T

LE

G

EN

D

A N

D A

BB

R

EV

IA

TI

O

N S

SU

R

VE

Y C

O N

TR

O

L

LA

YO

U

T

PL

AN

PR

O

JE

C T

LA

YO

U T

PL

AN

C

LE

AR

IN

G

, G R

U

BB

IN

G

D

EM

O

P

LA

N (1

O F

2)

C

LE

AR

IN

G

, G R

U

BB

IN

G

D

EM

O

P

LA

N (2

O F

2)

AC

C

ES

S

PL

AN

ST

O R

M W

AT

ER

P O

LL

U

TI

O

N P

R

EV

EN

TI

O N

P

LA

N (1

O F

2)

ST

O R

M W

AT

ER

P O

LL

U

TI

O

N P

R

EV

EN

TI

O N

P

LA

N (2

O F

2)

TY

PI

C

AL

S

EC

TI

O N

S

PL

AN

P R

O

FI

LE

(1

O F

6)

PL

AN

P R

O

FI

LE

(2

O F

6)

PL

AN

P R

O

FI

LE

(3

O F

6)

PL

AN

P R

O

FI

LE

(4

O F

6)

PL

AN

P R

O

FI

LE

(5

O F

6)

PL

AN

P R

O

FI

LE

(6

O F

6)

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(2 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(3 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(4 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(5 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(6 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(7 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(8 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(9 O

F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1

O F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1

O F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1

O F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1

O F

EA

R

TH

W O

R K

C R

O

SS

S

EC

TI

O

N S

(1

O F

ST

O R

M S

EW

ER

A N

D R

IP

R

AP

D

ET

AI

LS

C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G D

ET

AI

LS

C

H

AN

N

EL

L

IN

IN

G

S

EC

TI

O

N D

ET

AI

L

-0

PR

O

VI

D

E

IN

ST

AL

L

TE

M

PO

R

AR

Y

AC

C

ES

S

M

AT

S

LS

-0

TR

AF

FI

C

C O

N

TR

O L

AN

D

R

EG

U

LA

TI

O

N

LS

-0

C O

N

ST

R U

C

TI

O N

F

EN

C E

LF

-0

D

EB

R

IS

A N

D T

R

AS

H R

EM

O

VA

L

AN

D

D

IS

PO

SA

L

IN

A L

AN

D

FI

LL

C Y

-0

R

EM

O

VE

D

IS

PO

SE

O

F

AL

L

PI

PE

LF

-0

R

EM

O

VE

D

IS

PO

SE

O

F C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

SY

-1

R

EM

O

VE

D

IS

PO

SE

O

F R

IP

R

AP

SY

-6

R

EM

O

VE

A N

D D

IS

PO

SE

O

F C

H

AI

N L

IN

K

FE

N

C E

LF

-1

SI

TE

P R

EP

AR

AT

IO

N

R

ES

TO

R

AT

IO

N , I

N C

LU

D

IN

G

C

LE

AR

IN

G

G R

U

BB

IN

G

, C

AR

E

AN

D C

O N

TR

O

L O

F W

AT

ER

, T R

EE

P

LA

N T

PR

O

TE

C

TI

O

N A

N D

F

AC

IL

IT

Y

FO

R E

N G

IN

EE

R

LS

-0

C U

T

AN

D P

LU

G

W

AT

ER

M

AI

N

EA

-0

EX

C

AV

AT

IO

N

O

FF

-S

IT

E

D

IS

PO

SA

L C

Y

-0

EX

C

AV

AT

IO

N

F

IL

L

(O N

-S

IT

E M

AT

ER

IA

L)

C Y

-0

FL

O

W

AB

LE

C

O N

C R

ET

E

FI

LL

(2 ,5

P

SI

C Y

-0

R

EI

N

FO

R C

ED

S

IL

T

FE

N

C E

LF

-0

C O

N C

R

ET

E

TR

U C

K W

AS

H

O U

T

ST

R U

C

TU

R

ES

EA

-0

FI

LT

ER

D

AM

TY

PE

LF

-0

ST

AB

IL

IZ

ED

C

O N

ST

R

U C

TI

O

N A

C C

ES

S

SY

-0

IN

LE

T

PR

O

TE

C

TI

O N

B

AR

R

IE

R

EA

-0

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

, 8 " N

O M

IN

AL

T H

IC

KN

ES

S

SY

-0

R

IP

R

AP

,G R

AD

AT

IO

N

N O

. 2

SY

-0

G

EO

TE

XT

IL

E

FI

LT

ER

M

AT

ER

IA

L

FO

R

R

IP

R

AP

SY

C O

H

-4

TE

LE

VI

SI

O N

IN

SP

EC

TI

O N

O F

EX

IS

TI

N

G G

R

AV

IT

Y

SA

N

IT

AR

Y

SE

W

ER

LF

-0

-IN

C H

R

EI

N

FO

R C

ED

C

O N

C R

ET

E

PI

PE

LF

-0

-IN

C H

R

EI

N

FO

R C

ED

C

O N

C R

ET

E

PI

PE

LF

-0

-IN

C H

R

EI

N

FO

R C

ED

C

O N

C R

ET

E

PI

PE

LF

-7

H

EA

D W

AL

LS

A N

D W

IN

G

W

AL

LS

(C

AS

T-

IN

-P

LA

C

E)

EA

-0

6' C

H

AI

N L

IN

K

FE

N

C E

LF

-0

TY

PE

II

I T

R

AF

FI

C

B

AR

R

IE

R (T

EM

PO

R

AR

Y)

EA

-0

TU

R

F

ES

TA

BL

IS

H

M

EN

T

- S

O D

D

IN

G

SY

-0

H

YD

R O

M U

LC

H

T U

R

FG

R

AS

S

SE

ED

IN

G

SY

-9

C O

N

TI

N G

EN

C

Y D

O

C U

LV

ER

T

ST

R U

C

TU

R E

D

ET

AI

LS

(1 O

F 5)

C U

LV

ER

T

ST

R U

C

TU

R E

D

ET

AI

LS

(2 O

F 5)

C U

LV

ER

T

ST

R U

C

TU

R E

D

ET

AI

LS

(3 O

F 5)

C U

LV

ER

T

ST

R U

C

TU

R E

D

ET

AI

LS

(4 O

F 5)

C U

LV

ER

T

ST

R U

C

TU

R E

D

ET

AI

LS

(5 O

F 5)

37 38 39 40 41 42

ST

O

R M

W

AT

ER

P

O

LL

U

TI

O N

P R

EV

EN

TI

O

N D

ET

AI

LS

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

GENERAL NOTES (1 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

TX

D

O T

A N

D H

C

TR

A F

A C

IL

IT

IE

S

BR

ID

G

ES

C R

O

SS

IN

G

G R

EE

N

S

BA

YO

U

A T

AL

D

IN

E

BE

N

D

ER

A N

D B

W

FR

O

N

TA

G E

R O

AD

S

AR

E

M

AI

N

TA

IN

ED

B Y

TX

D

O T.

BW

M

AI

N

LA

N

ES

A R

E M

AI

N

TA

IN

ED

B

Y H

C

TR

A.

N

O W

O R

K W

IL

L

BE

P

ER

FO

R M

ED

W

IT

H

IN

0' F

R O

M T

H

ES

E

BR

ID

G

ES

A

N D

C O

N

ST

R U

C

TI

O N

A C

C

ES

S U

N D

ER

N

EA

TH

T H

ES

E

BR

ID

G

ES

A R

E N

O T

AL

LO

W

ED

C U

LV

ER

T N

O

TE

S 1.

C U

LV

ER

T C

O N

ST

R

U C

TI

O

N T

O B

E

IN

A C

C O

R D

AN

C

E W

IT

H

H

AR

R

IS

C O

U N

TY

F

LO

O

D C

O N

TR

O

L

SP

EC

IF

IC

AT

IO

N

S

1, 2, , A N

D

W

IT

H A

LL

A

M

EN

D M

EN

TS

T H

ER

ET

O E

XC

EP

T

AS

M O

D

IF

IE

D

U N

D

ER

T H

IS

C

O N

TR

AC

T.

R

EI

N

FO

R

C

ED

C O

N C

R

ET

E

PI

PE

S

TO

R

M S

EW

ER

S H

AL

L

C O

N

FO

R M

T O

A

ST

M C

-7 6, C

LA

SS

II

I U

SI

N G

R U

BB

ER

G

AS

KE

T

JO

IN

TS

O

N

LY

C O

N

FO

R M

IN

G

T O

A

ST

M

2.

C

O N

TR

AC

TO

R

S H

AL

L

M

AI

N

TA

IN

F

LO

W

S

IN

D

IT

C H

ES

D

U R

IN

G

C O

N

ST

R U

C

TI

O N

A N

D R

ES

TO

R E

D

IT

C H

ES

D

AM

AG

ED

D

U R

IN

G

C O

N

ST

R U

C

TI

O N

T O

O R

IG

IN

AL

C

O N

D

IT

IO

N

O R

B

ET

TE

R

ST

O

R M

W A

TE

R

P O

LL

U

TI

O

N P

R

EV

EN

TI

O N

P

LA

N N

O

TE

S 1.

TH

IS

P R

O

JE

C T

D

IS

TU

R

BS

AC

R

ES

, T

H

ER

EF

O

R E, A C

O N

ST

R

U C

TI

O

N G

EN

ER

AL

P

ER

M

IT

F

O R

S

TO

R M

W

AT

ER

D

IS

C

H

AR

G

ES

IS

R

EQ

U

IR

ED

. T H

E C

O N

TR

AC

TO

R

S H

AL

L

IM

PL

EM

EN

T, IN

SP

EC

T, A

N D

M

AI

N

TA

IN

T

H E

ST

O

R M

W

AT

ER

PO

LL

U

TI

O

N P

R

EV

EN

TI

O N

P

LA

N

2.

TH

E C

O N

TR

AC

TO

R

W

IL

L

TA

KE

A

PP

R

O

PR

IA

TE

M

EA

SU

R

ES

T

O P

R

EV

EN

T, M

IN

IM

IZ

E

AN

D C

O N

TR

O

L

TH

E

SP

IL

L

O F

H

AZ

AR

D

O U

S M

AT

ER

IA

L

IN

T

H E

C O

N

ST

R U

C

TI

O N

S

TA

G

IN

G A

R

EA

. A

LL

M

AT

ER

IA

LS

B

EI

N

G R

EM

O

VE

D

A N

D /O

R D

IS

PO

SE

D

O F

BY

T

H E

C O

N

TR

AC

TO

R W

IL

L

BE

D

O N

E

SO

IN

A

C C

O R

D

AN

C E

W

IT

H S

TA

TE

A N

D F

ED

ER

AL

L

AW

S

AN

D

W

IT

H T

H E

AP

PR

O

VA

L O

F

TH

E

PR

O

JE

C T

EN

G

IN

EE

R

3.

AS

R

EQ

U

IR

ED

O

N T

H E

ST

O

R M

W

AT

ER

P

O

LL

U

TI

O N

P R

EV

EN

TI

O

N P

LA

N

O R

A S

D

IR

EC

TE

D B

Y

TH

E

EN

G

IN

EE

R

, T H

E

TE

M

PO

R

AR

Y

ER

O

SI

O N

A N

D S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L

FE

AT

U

R

ES

S H

AL

L

BE

IN

P

LA

C E

PR

IO

R T

O C

O N

ST

R

U C

TI

O

N

4.

TH

E C

O N

TR

AC

TO

R

S H

AL

L

SC

H

ED

U

LE

T

H E

W O

R K

IN

S

U C

H A

M

AN

N

ER

S O

T H

AT

S

EE

D

IN

G

A N

D /O

R S

O D

D

IN

G M

AY

B

E

PE

R

FO

R M

ED

A

S

SO

O N

A S

PO

SS

IB

LE

5.

TH

E C

O N

TR

AC

TO

R

'S A

TT

EN

TI

O

N

IS

D

IR

EC

TE

D T

O T

H E

FA

C

T

TH

AT

T

EM

PO

R

AR

Y

AN

D P

ER

M

AN

EN

T

ER

O

SI

O N

C O

N

TR

O L

M

EA

SU

R

ES

M

AY

B

E N

EC

ES

SA

R

Y

TO

C O

M

PL

Y W

IT

H

P R

O

VI

SI

O

N S

O F

TH

E

TE

XA

S

PO

LL

U

TI

O

N D

IS

C

H

AR

G E

EL

IM

IN

AT

IO

N

SY

ST

EM

(T

PD

ES

) G

EN

ER

AL

P

ER

M

IT

A S

R

EQ

U

IR

ED

U

N D

ER

T

H E

C

LE

AN

W

AT

ER

A C

T.

6.

PR

IO

R

T O

G R

AD

IN

G O

PE

R

AT

IO

N S

AN

D

D U

R

IN

G P

R O

JE

C

T D

U R

AT

IO

N , T

EM

PO

R

AR

Y O

R P

ER

M

AN

EN

T

ER

O

SI

O N

C O

N

TR

O L

M

EA

SU

R

ES

S

H

AL

L

BE

IN

P

LA

C

E

TO

P R

EV

EN

T

SE

D

IM

EN

T

FR

O

M L

EA

VI

N G

T H

E

PR

O

JE

C T

AR

EA

H C

FC

D

G

EN

ER

A

L N

O

TE

S

1.

FE

N C

ES

A

N D

/O R

O

TH

ER

E

N C

R O

AC

H

M

EN

TS

IN

T H

E H

C

FC

D R

IG

H

T- O

F- W

AY

A

R E

N O

T

TO

B E

R

EM

O

VE

D U

N

LE

SS

O

TH

ER

W

IS

E

ST

AT

ED

O N

T H

E

PL

AN

S.

IN

C

AS

ES

W H

ER

E

FE

N

C E

R

EM

O

VA

L

IS

IN

D

IC

AT

ED

O

N T

H E

PL

AN

S, T

H E

FE

N

C E

SH

AL

L

BE

R

EM

O

VE

D A

N D

P

LA

C

ED

N

EA

TL

Y

O N

T H

E

AD

JA

C

EN

T

PR

O

PE

R

TY

A

T

TH

E

ST

AR

T

O F

C O

N

ST

R U

C

TI

O N

. W H

ER

E

TH

ER

E

IS

N O

T A

S

EP

AR

AT

E

IT

EM

L

IS

TE

D O

N T

H E

U N

IT

P

R

IC

E

SC

H

ED

U

LE

, T H

E

EN

C R

O

AC

H M

EN

T

R

EM

O

VA

L

IS

IN

C

ID

EN

TA

L

TO

S

IT

E

PR

EP

AR

AT

IO

N

A N

D R

ES

TO

R

AT

IO

N

2.

D

O N

O T

EN

TE

R P

R

IV

AT

E

PR

O

PE

R

TY

W

IT

H

O U

T

PR

O

PE

R W

R

IT

TE

N

A U

TH

O

R

IZ

AT

IO

N F

R O

M T

H E

O W

N

ER

. P R

O

VI

D E

C O

PY

O

F W

R

IT

TE

N

P

ER

M

IS

SI

O

N T

O H

C

FC

D

3.

ST

R

IP

V

EG

ET

AT

IO

N

A N

D T

O

PS

O

IL

A N

D S

TO

C

KP

IL

E

FO

R R

EU

SE

O N

SI

TE

. M

AT

ER

IA

L

FO

U N

D U

N

AC

C

EP

TA

BL

E

BY

T H

E

EN

G

IN

EE

R

W

IL

L

BE

R

EM

O

VE

D A

N D

P

AI

D A

S

EX

C

AV

AT

IO

N A

N D

O

FF

SI

TE

D

IS

PO

SA

L.

N

O S

EP

AR

AT

E

M

EA

SU

R

EM

EN

T

AN

D

PA

YM

EN

T W

IL

L

BE

M

AD

E

FO

R

S

TR

IP

PI

N G

, S

TO

C

KP

IL

IN

G A

N D

P

LA

C

IN

G O

N -S

IT

E

TO

PS

O

IL

. T H

E C

O

ST

F O

R T

H

IS

W O

R K

W

IL

L

BE

IN

C

ID

EN

TA

L

TO

R

EL

AT

ED

P

AY

IT

EM

S

U N

D

ER

S

PE

C

IF

IC

AT

IO

N

S

EC

TI

O

N N

U M

BE

R

L

IS

TE

D O

N T

H E

U N

IT

PR

IC

E

SC

H

ED

U

LE

4.

R

IP

R

AP

A

N D

G R

AN

U

LA

R

F

IL

L M

AT

ER

IA

L

R

EM

O

VE

D D

U R

IN

G

E

XC

AV

AT

IO

N

, M

EE

TI

N

G S

PE

C

IF

IC

AT

IO

N S

EC

TI

O N

N U

M

BE

R

8, S H

AL

L

BE

R

EU

SE

D A

S D

IR

EC

TE

D

B Y

TH

E

EN

G

IN

EE

R . R

EU

SE

D M

AT

ER

IA

L

W

IL

L

BE

M

EA

SU

R

ED

A

N D

P

AI

D F

O R

A S

EX

C

AV

AT

IO

N

A N

D O

N -S

IT

E

FI

LL

U N

D

ER

S

PE

C

IF

IC

AT

IO

N

N U

M

BE

R

. N O

S

EP

AR

AT

E M

EA

SU

R

EM

EN

T

O R

P

AY

M

EN

T W

IL

L

BE

M

AD

E

FO

R

P R

O C

ES

SI

N G

, H

AN

D

LI

N G

, S

TO

C

KP

IL

IN

G , A

N D

P

LA

C

IN

G M

AT

ER

IA

L

FO

U

N D

T O

B E

AC

C

EP

TA

BL

E

FO

R

R

EU

SE

. U

PO

N

A

PP

R O

VA

L

O F

TH

E

EN

G

IN

EE

R , D

IS

PO

SA

L

O F

N O

N C

O N

FO

R

M

IN

G R

IP

R

AP

A

N D

G R

AN

U

LA

R

F

IL

L M

AT

ER

IA

L

W

IL

L

BE

M

EA

SU

R

ED

A

N D

P

AI

D F

O R

A S

R

EM

O

VE

A N

D D

IS

PO

SE

O

F C

O N

C R

ET

E

R U

BB

LE

U N

D

ER

S

PE

C

IF

IC

AT

IO

N

S

EC

TI

O

N N

U M

BE

R

, M

AT

ER

IA

L

D

IS

PO

SA

L.

5.

TH

E

LO

C

AT

IO

N

A N

D G

R

AD

E O

F

TH

E

BA

C

KS

LO

PE

IN

TE

R C

EP

TO

R S

TR

U

C

TU

R

ES

A N

D S

W

AL

ES

M

AY

B

E

AD

JU

ST

ED

IN

T H

E

FI

EL

D

B Y

TH

E

EN

G

IN

EE

R A

T

TH

E

TI

M E

O F

C O

N

ST

R U

C

TI

O N

. U N

LE

SS

O

TH

ER

W

IS

E

IN

ST

R U

C

TE

D B

Y

TH

E

EN

G

IN

EE

R

, T H

E

BA

C

KS

LO

PE

IN

TE

R C

EP

TO

R S

TR

U

C

TU

R E

SH

AL

L

BE

S

ET

A T

A M

AX

IM

U M

D

EP

TH

O

F 2.

FE

ET

A

N D

T H

E M

IN

IM

U M

G R

AD

E

FO

R

B

AC

KS

LO

PE

S

W

AL

ES

S

H

AL

L

BE

.2

6.

AD

JU

ST

Y

AR

D D

R

AI

N S

AS

D

IR

EC

TE

D

IN

T

H E

FI

EL

D A

T

TH

E

TI

M E

O F

C O

N

ST

R U

C

TI

O N

. P

AY

M

EN

T W

IL

L

BE

IN

C

ID

EN

TA

L

TO

SI

TE

P R

EP

AR

AT

IO

N A

N D

R

ES

TO

R

AT

IO

N

7.

C

O M

PL

ET

ED

S

EC

TI

O N

S O

F

TH

E C

H

AN

N

EL

W

IL

L

BE

R

EV

EG

ET

AT

ED

B Y

TH

E

C O

N

TR

AC

TO

R

IN

M

AX

IM

U

M

LI

N

EA

R

FO

O

T

SE

G M

EN

TS

. C O

N

TR

AC

TO

R M

AY

N

O T

D

IS

TU

R

B G

R

EA

TE

R

T H

AN

LF

O

F C

H

AN

N

EL

A T

A

TI

M E.

8.

C

LE

AR

A N

D R

EM

O

VE

A

LL

S

IL

T

FR

O

M C

U

LV

ER

TS

, P

IP

ES

A

N D

U N

D

ER

B R

ID

G

ES

T

O T

H E

PR

O

PO

SE

D D

ES

IG

N G

R

AD

ES

T

O

PR

O

VI

D E

PO

SI

TI

VE

F

LO

W

9.

LE

N G

TH

S

AN

D

D

IA

M

ET

ER

S

R

EP

R

ES

EN

TE

D O

N P

LA

N

S

AR

E

AP

PR

O

XI

M

AT

E.

C O

N

TR

AC

TO

R W

IL

L

BE

R

ES

PO

N

SI

BL

E

FO

R

FI

EL

D V

ER

IF

IC

AT

IO

N

P R

IO

R

T O

O R

D

ER

IN

G

M

AT

ER

IA

LS

AC

TI

VI

TI

ES

T

H

AT

D

IS

TU

R

B

BI

R D

H

AB

IT

AT

, I N

C

LU

D

IN

G B

U T

N O

T

LI

M

IT

ED

T

O C

LE

AR

IN

G

, G R

U

BB

IN

G

, A N

D

IM

PA

C

TS

T

O

ST

R U

C

TU

R

ES

W H

ER

E

M

IG

R

AT

O R

Y

BI

R D

S

AN

D B

AL

D

E

AG

LE

S

M

IG

H T

N

ES

T, R

EQ

U

IR

E

A N

ES

T

H

AB

IT

AT

S U

R

VE

Y.

D

O N

O T

PR

O

C

EE

D U

N

TI

L H

AR

R

IS

C

O U

N

TY

F

LO

O D

C O

N

TR

O L

D

IS

TR

IC

T H

AS

C

O N

D U

C

TE

D A

N

ES

T H

AB

IT

AT

S

U R

VE

Y

TO

V

ER

IF

Y

AC

TI

VE

M

IG

R

AT

O R

Y

BI

R D

N

ES

TS

A

N D

B

AL

D E

AG

LE

N

ES

TS

A

R E

N O

T

PR

ES

EN

T.

T

H E

H

AR

R

IS

C O

U N

TY

F

LO

O

D C

O N

TR

O

L D

IS

TR

IC

T

M U

ST

P

R O

VI

D

E W

R

IT

TE

N

A U

TH

O

R

IZ

AT

IO

N T

O P

R O

C

EE

D

W H

EN

B

AN

K

ER

O

SI

O

N R

EP

AI

R S

C

AL

L

FO

R T

H E

PL

AC

EM

EN

T O

F 3" x5 " G

R

AN

U

LA

R F

IL

L

IN

T

H E

C H

AN

N

EL

B

O

TT

O M

T O

ES

TA

BL

IS

H A

B

AS

E

FO

R R

EB

U

IL

D

IN

G

T H

E

SL

O

PE

. T H

E 3" x5 " G

R

AN

U

LA

R F

IL

L

SH

AL

L

BE

L

IM

IT

ED

T O

A N

E

LE

VA

TI

O N

6-

IN

C H

ES

A

BO

VE

T H

E N

O R

M

AL

W

AT

ER

S

U R

FA

C

E

EL

EV

AT

IO

N

L

EV

EL

TH

E

C O

N

TR

AC

T

C O

N

TA

IN

S

U N

IT

IT

EM

S

FO

R

T H

E

ES

TA

BL

IS

H

M

EN

T O

F

BE

ST

M

AN

AG

EM

EN

T

PR

AC

TI

C

ES

F O

R S

TO

R

M W

AT

ER

Q U

AL

IT

Y

PU

R

PO

SE

S.

W H

EN

N

O T

C

AL

LE

D

F O

R

IN

T H

E

PR

O

JE

C T

PL

AN

S, C

O O

R D

IN

AT

E

TH

E N

EE

D

A N

D L

O C

AT

IO

N O

F

TH

ES

E

U N

IT

IT

EM

S

W

IT

H T

H E

D

IS

TR

IC

T R

EP

R

ES

EN

TA

TI

VE

O

N S

IT

E

PR

IO

R T

O P

LA

C

EM

EN

T.

T

H

ES

E U

N

IT

IT

EM

S

IN

C

LU

D E, B U

T

AR

E N

O T

LI

M

IT

ED

T O

, R

EI

N

FO

R C

ED

S

IL

T

FE

N

C E

FO

R

M

AT

ER

IA

L

ST

O C

KP

IL

ES

, A

N C

H O

R

ED

S O

D D

IN

G

F O

R D

IS

TU

R

BE

D E

AR

TH

EN

A

R

EA

S O

R A

R O

U N

D C

O N

C R

ET

E

AN

D

C O

N C

R

ET

E

IN

TE

R

C

EP

TO

R

, A N

D S

TA

BI

LI

ZE

D C

O N

ST

R

U C

TI

O

N A

C C

ES

S

FO

R

P R

O

JE

C T

SI

TE

IN

G

R

ES

S/

EG

R

ES

S.

W H

EN

IN

C

LU

D

ED

IN

T

H E

SC

O

PE

O

F W

O R

K, T

H E

PU

R

PO

SE

O F

D

EE

P

PL

O W

IN

G

T H

E

SL

O

PE

O R

B

ER

M O

F A

C H

AN

N

EL

IS

TO

B

R

EA

K U

P

TH

E D

ES

IC

C

AT

ED

S

O

IL

S

AN

D T

O E

LI

M

IN

AT

E

AN

Y

VO

ID

S, O R

R

IL

LI

N

G C

LO

SE

T O

T H

E

SU

R

FA

C E

O F

TH

E

SL

O

PE

O

R B

ER

M

. T H

E C

O N

TR

AC

TO

R

W

IL

L D

EE

P

PL

O

W T

H E

SL

O

PE

O

R B

ER

M

T O

A M

IN

IM

U M

D

EP

TH

O

F

FE

ET

IN

AR

EA

S

C O

N

TA

IN

IN

G V

O

ID

S

AN

D /O

R R

IL

LI

N G

. I N

A R

EA

S

O F

VO

ID

S O

N

LY

, T H

E

SU

R

FA

C E

FR

O

M W

H

IC

H T

H E

FE

ET

D

EP

TH

IS

M

EA

SU

R

ED

W

IL

L

BE

T H

E

LE

VE

L

O F

TH

E

S U

R R

O U

N D

IN

G

U N

D

IS

TU

R

BE

D

S O

IL

. I

N A

R

EA

S O

F R

IL

LI

N G

, T H

E R

IL

LS

W

IL

L

FI

R

ST

B E

KN

O

C

KE

D D

O W

N A

N D

L

EV

EL

ED

O

FF

. T H

E

FE

ET

D

EP

TH

W

IL

L

TH

EN

B E

M

EA

SU

R

ED

F

R O

M T

H

IS

N

EW

SU

R

FA

C

E.

T

H E

C O

N

TR

AC

TO

R W

IL

L

D

ET

ER

M

IN

E

TH

E

M

EA

N S

AN

D

M

ET

H O

D S

FO

R

D

EE

P

PL

O W

IN

G

TR

EE

S

AN

D P

LA

N

TS

L

O C

AT

ED

W

IT

H

IN

A D

ES

IG

N

AT

ED

T

R

EE

P R

O

TE

C

TI

O N

Z O

N E

(T

PZ

) S H

AL

L

BE

P

R

ES

ER

VE

D . R

EF

ER

TO

S

PE

C

IF

IC

AT

IO

N S

EC

TI

O N

TR

EE

A N

D P

LA

N

T

PR

O

TE

C

TI

O N

, F O

R D

ET

AI

LE

D

IN

FO

R M

AT

IO

N O

N T

R

EE

A N

D

PL

AN

T

PR

ES

ER

VA

TI

O

N P

R

AC

TI

C

ES

A

N D

P R

O C

ED

U

R

ES

IN

C

LU

D

IN

G

, B U

T N

O T

LI

M

IT

ED

T O

, R O

O T

PR

U

N

IN

G , V

EG

ET

AT

IO

N

TR

IM

M

IN

G

, F

EN

C

IN

G A

N D

O

TH

ER

P

R

ES

ER

VA

TI

O

N O

PE

R

AT

IO

N S.

IF

A

PP

LI

C

AB

LE

, C

O N

TR

AC

TO

R

S H

AL

L

AV

O

ID

A

N Y

W

ET

LA

N

D A

R

EA

S

BE

YO

N

D T

H E

LI

M

IT

S

O F

EX

C

AV

AT

IO

N

A N

D C

LE

AR

IN

G

AS

T H

E

FI

R

ST

W O

R K

IT

EM

C O

N

TR

AC

TO

R W

IL

L

BE

R

ES

PO

N

SI

BL

E

FO

R

IN

ST

AL

LI

N G

F

EN

C

IN

G O

R O

TH

ER

M

AT

ER

IA

L

TO

ID

EN

TI

FY

A N

D P

R O

TE

C

T

TH

E

ID

EN

TI

FI

ED

W

ET

LA

N

D A

R

EA

S, U

N

LE

SS

W

ET

LA

N D

S H

AV

E

BE

EN

ID

EN

TI

FI

ED

AN

D F

EN

C

ED

B

Y H

C

FC

D P

R

IO

R T

O C

O N

ST

R

U C

TI

O

N A

N D

C O

N

TR

AC

TO

R H

AS

W

R

IT

TE

N

E

VI

D

EN

C E

O F

SU

C

H

TH

E

G

EO

TE

C

H N

IC

AL

R

EP

O R

T C

O N

TA

IN

IN

G

G

EO

TE

C

H N

IC

AL

R

EC

O M

M

EN

D

AT

IO

N

O N

T H

E

PR

O

JE

C T

IS

T

IT

LE

D 'A

D D

EN

D

U M

G

EO

TE

C

H N

IC

AL

R

EC

O M

M

EN

D

AT

IO

N

S (M

EM

O

R

AN

D U

M -2

) C O

N C

R

ET

E-

LI

N

ED

C H

AN

N

EL

A

LO

N

G S

TA

TI

O N

+5

TO

S

TA

TI

O

N

0+

H C

FC

D

P R

O

JE

C T

N O

. P

8-

-0 0-

E0

PR

EP

AR

ED

B

Y C

IB

O

R G

EO

C

O N

SU

LT

AN

TS

, D

AT

ED

SE

PT

5, . T

H E

R

EP

O R

T

IS

A

PP

R O

VE

D

B Y

H C

FC

D

M A

IN

TE

N A

N C

E

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

N O

TE

S

1.

TH

E

PR

O

JE

C T

PL

AN

S

AR

E

IN

TE

N

D

ED

A S

A G

U

ID

E.

T

H E

R

EP

AI

R

A R

EA

L

IM

IT

S W

IL

L

BE

D

ET

ER

M

IN

ED

IN

T H

E

FI

EL

D

B Y

TH

E

H C

FC

D

R

EP

R

ES

EN

TA

TI

VE

. D U

E

TO

T H

E D

YN

AM

IC

C

O N

D

IT

IO

N

S

IN

T H

E

FI

EL

D

, P R

O

JE

C T

SC

O

PE

A

N D

Q U

AN

TI

TI

ES

M

AY

V

AR

Y

FR

O M

T H

E

PL

AN

S

AN

D

/O R

C R

O

SS

S

EC

TI

O

N S.

H C

FC

D

R

ES

ER

VE

S

TH

E R

IG

H

T

TO

A D

JU

ST

P

LA

N S

AN

D

Q U

AN

TI

TI

ES

A S

N

EC

ES

SA

R Y.

P R

O

JE

C T

SC

O

PE

M

AY

B

E

AD

JU

ST

ED

A

S

PR

IO

R

IT

IE

S C

H

AN

G E.

2.

TH

E

PU

R

PO

SE

O

F

TH

E C

H

AN

N

EL

D

ES

IL

T

IS

T

O R

ES

TO

R E

PO

SI

TI

VE

D R

AI

N

AG

E

D U

R

IN

G L

O W

F

LO

W C

O N

D

IT

IO

N

S.

U

N

LE

SS

S

PE

C

IF

IC

AL

LY

ST

AT

ED

O

TH

ER

W

IS

E, IT

IS

N

O T

TH

E

IN

TE

N T

O F

TH

E

PR

O

JE

C

T

TO

D

EE

PE

N

T H

E C

H

AN

N

EL

B

EY

O N

D

IT

S O

R

IG

IN

AL

D

ES

IG

N

C O

N

FI

G U

R

AT

IO

N

EX

C

AV

AT

IO

N O

F

SI

LT

S

H O

U

LD

N O

T U

N D

ER

M

IN

E

TH

E

TO

E

O F

TH

E

SL

O

PE

R

ET

AI

N

ED

O

N S

EI

VE

3"

- 1

B Y

W

EI

G H

T 5" 4"

ST

R

EA

M

B

ED

F

IL

L N

O

TE

S 1.

ST

R

EA

M

ED

F

IL

L

SH

AL

L C

O N

SI

ST

O F

A W

EL

L

G R

AD

ED

M

IX

TU

R

E O

F M

AT

ER

IA

L

O F

R

EC

YC

LE

D C

O N

C R

ET

E

TO

"X 5"

G R

AN

U

LA

R

F

IL

L.

T

H E

M

IX

TU

R

E

SH

AL

L

C O

N

SI

ST

O

F

AP

PR

O

XI

M

AT

EL

Y

G

R

AN

U

LA

R F

IL

L

AN

D

0%

C R

U

SH

ED

C

O N

C R

ET

E.

T H

E C

R U

SH

ED

C O

N C

R

ET

E

SH

AL

L

M

EE

T C

R

IT

ER

IA

S H

O W

N

IN

T H

E

TA

BL

E

BE

LO

W , A

N D

W H

EN

T

ES

TE

D

IN

AC

C

O R

D

AN

C E

W

IT

H A

ST

M

C

B Y

W

EI

G H

T.

7/ 8"

2" 1 3/

4"

3/ 8"

#4 #4

#2

W

EL

L G

R A

D

ED

M

IX

N O

TE

S

1.

PA

YM

EN

T

FO

R T

H E

W

EL

L G

R

AD

ED

M

IX

TU

R E

W

IL

L

BE

M

AD

E

BY

TH

E

U N

IT

IT

EM

8-

, G

R

AN

U

LA

R F

IL

L, G R

AV

EL

T O

R

IP

R

AP

G R

AD

AT

IO

N

N O

. 2 , A

S D

IR

EC

TE

D

B Y

TH

E

EN

G

IN

EE

R

2.

IN

ST

AL

LA

TI

O N

O F

W

EL

L G

R

AD

ED

M

IX

TU

R E

IN

T

H E

SC

O

U R

ED

C

H

AN

N

EL

B O

TT

O

M S

H

AL

L C

O N

SI

ST

O F

A W

EL

L

G R

AD

ED

M

IX

TU

R

E O

F M

AT

ER

IA

L

FR

O

M G

R

AV

EL

T

O G

R

AD

E #1

R

IP

R

AP

, T O

M

IN

IM

IZ

E

VO

ID

S.

T H

E M

IX

TU

R E

SH

AL

L C

O N

SI

ST

O F

AP

PR

O

XI

M

AT

EL

Y

G R

AD

E

#1 R

IP

R

AP

, 5

5%

"X 5"

C R

U

SH

ED

R

O C

K

AN

D

5% R

EC

YC

LE

D

C R

U

SH

ED

C

O N

C R

ET

E

BA

SE

M

AT

ER

IA

L( G

R

AV

EL

TH

E

C R

U

SH

ED

BA

SE

M

AT

ER

IA

L

SH

AL

L M

EE

T

C R

IT

ER

IA

S

H O

W N

IN

T

H E

TA

BL

E

BE

LO

W

, W H

EN

T

ES

TE

D

IN

A C

C O

R D

AN

C

E W

IT

H

A

ST

M C

R

ET

AI

N

ED

O

N S

Q U

AR

E

SE

IV

E

3/ 8"

B Y

W

EI

G H

T

3/ 4"

7/ 8"

N O

. 4

N O

. 4

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

GENERAL NOTES (2 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

N O

TI

C

E

FO

R

Y O

U R

S

AF

ET

Y, Y O

U A

R E

R

EQ

U

IR

ED

B

Y

TE

XA

S

LA

W

T O

C

AL

L

AT

LE

AS

T

H O

U R

S

BE

FO

R

E

YO

U D

IG

S

O T

H

AT

U N

D

ER

G R

O U

N D

L

IN

ES

C

AN

B

E M

AR

KE

D

TH

IS

S

IG

N

AT

U R

E D

O

ES

N O

T

FU

LF

IL

L

YO

U R

O

BL

IG

AT

IO

N

T O

C

AL

L

1.

VE

R

IF

IC

A

TI

O N

O F

PR

IV

A

TE

U

TI

LI

TY

L

IN

ES

D at e

C

EN

TE

R

PO

IN

T

EN

ER

G

Y N

AT

U

R

AL

G

AS

U

TI

LI

TI

ES

S

H O

W N

(G

AS

S

ER

VI

C E

LI

N

ES

A

R E

N O

T

SH

O W

N

T H

IS

S

IG

N

AT

U

R E

N O

T

TO

B E

U

SE

D F

O R

C O

N

FL

IC

T

VE

R

IF

IC

AT

IO

N S

IG

N

AT

U

R E

VA

LI

D F

O R

S

IX

M O

N

TH

S. D at e

C

EN

TE

R

PO

IN

T

EN

ER

G

Y/ U

N D

ER

G

R O

U N

D E

LE

C

TR

IC

AL

F

AC

IL

IT

IE

S

VE

R

IF

IC

AT

IO

N

O N

LY

(T H

IS

S

IG

N

AT

U

R E

VE

R

IF

IE

S

EX

IS

TI

N G

U N

D

ER

G R

O U

N D

FA

C

IL

IT

IE

S

- N O

T

TO

B E

U

SE

D F

O R

C O

N

FL

IC

T

VE

R

IF

IC

AT

IO

N

SI

G

N

AT

U R

E

VA

LI

D

F O

R S

IX

M

O N

TH

S.

D at e

AT

&T

A

PP

R O

VE

D

F O

R A

T& T

TE

XA

S/

SW

BT

F

AC

IL

IT

IE

S U

N D

ER

G

R O

U N

D C

O N

D U

IT

O

N

LY

U

TI

LI

TY

N O

TE

S:

C

EN

TE

R

PO

IN

T

EN

ER

G

Y R

ES

O

U R

C

ES

C O

R P.

(G A

S) C

A U

TI

O

N U

N D

ER

G

R O

U N

D G

A S

FA

C

IL

IT

IE

S

TH

E

C O

N

TR

AC

TO

R S

H

AL

L C

O N

TA

C

T

TH

E U

TI

LI

TY

C

O O

R D

IN

AT

IN

G

C O

M M

IT

TE

E

AT

-8

-5

-6

O R

A M

IN

IM

U M

O F

H

O U

R S

PR

IO

R T

O C

O N

ST

R

U C

TI

O

N T

O H

AV

E

M

AI

N A

N D

S

ER

VI

C

E

LI

N

ES

F

IE

LD

L

O C

AT

ED

W H

EN

C

EN

TE

R

PO

IN

T

EN

ER

G Y

PI

PE

L

IN

E M

AR

KI

N G

S

AR

E N

O T

VI

SI

BL

E, C

AL

L (7

) 2

-5

O R

(7

) 9

-8

(7

:0

A.

M

. T O

:3

P.

M

FO

R

S

TA

TU

S

O F

LI

N

E

LO

C

AT

IO

N

R

EQ

U

ES

T

BE

FO

R

E

EX

C

AV

AT

IO

N B

EG

IN

S.

W H

EN

E

XC

AV

AT

IN

G W

IT

H

IN

E

IG

H

TE

EN

IN

C

H

ES

(1 8”

) O F

TH

E

IN

D

IC

AT

ED

L

O C

AT

IO

N O

F C

EN

TE

R

PO

IN

T

EN

ER

G Y

FA

C

IL

IT

IE

S, A

LL

E

XC

AV

AT

IO

N

M U

ST

B

E

AC

C O

M

PL

IS

H

ED

U

SI

N

G N

O N

-M

EC

H

AN

IZ

ED

E

XC

AV

AT

IO

N

P R

O C

ED

U

R

ES

W H

EN

C

EN

TE

R

PO

IN

T

EN

ER

G Y

FA

C

IL

IT

IE

S

AR

E

EX

PO

SE

D

, S U

FF

IC

IE

N

T

SU

PP

O

R T

M U

ST

B

E

PR

O

VI

D

ED

T O

T H

E

FA

C

IL

IT

IE

S

TO

P R

EV

EN

T

EX

C

ES

SI

VE

S

TR

ES

S

O N

T H

E

PI

PI

N

G

FO

R

E M

ER

G

EN

C

IE

S

R

EG

AR

D

IN

G

G

AS

L

IN

ES

C

AL

L

(7

) 6

-2

O

R (7

) 2

-4

0.

TH

E

C O

N

TR

AC

TO

R

IS

F U

LL

Y

R

ES

PO

N

SI

BL

E

FO

R A

N Y

D

AM

AG

ES

C

AU

SE

D

B Y

H

IS

F

AI

LU

R

E

TO

E

XA

C

TL

Y

LO

C

AT

E

AN

D

PR

ES

ER

VE

T

H

ES

E U

N D

ER

G

R O

U N

D F

AC

IL

IT

IE

S.

C

EN

TE

R

PO

IN

T

EN

ER

G

Y H

O U

ST

O

N E

LE

C

TR

IC

L

LC

W A

R N

IN

G

O

VE

R H

EA

D

E

LE

C

TR

IC

A

L

FA

C

IL

IT

IE

S O

VE

R

H

EA

D L

IN

ES

M

AY

E

XI

ST

O

N T

H E

PR

O

PE

R

TY

. T

H E

LO

C

AT

IO

N O

F O

VE

R

H

EA

D L

IN

ES

H

AS

N O

T

BE

EN

S

H O

W N

O N

TH

ES

E D

R

AW

IN

G

S

AS

T H

E

LI

N

ES

A R

E C

LE

AR

LY

V

IS

IB

LE

, B

U T

YO

U

S H

O U

LD

L

O C

AT

E

TH

EM

P R

IO

R

T O

B

EG

IN

N

IN

G

A N

Y C

O N

ST

R

U C

TI

O

N . T

EX

AS

L

AW

, S

EC

TI

O

N

, H

EA

LT

H

S

AF

ET

Y

C O

D E

FO

R

BI

D

S

AC

TI

VI

TI

ES

T H

AT

O

C C

U R

IN

C

LO

SE

PR

O

XI

M

IT

Y

TO

H

IG

H

V O

LT

AG

E

LI

N

ES

, S

PE

C

IF

IC

AL

LY

AN

Y

AC

TI

VI

TY

W H

ER

E

PE

R

SO

N

O R

T H

IN

G

S M

AY

C

O M

E W

IT

H

IN

S

IX

(6

) F

EE

T O

F

LI

VE

O

VE

R

H

EA

D H

IG

H

V O

LT

AG

E

LI

N

ES

AN

D

O

PE

R

AT

IN

G

A C

R

AN

E, D

ER

R

IC

K, P O

W

ER

S H

O

VE

L, D

R

IL

LI

N

G R

IG

, P

IL

E

D R

IV

ER

, H O

IS

TI

N G

E Q

U

IP

M

EN

T, O

R S

IM

IL

AR

AP

PA

R

AT

U

S W

IT

H

IN

FE

ET

O

F

LI

VE

O

VE

R

H

EA

D H

IG

H

V O

LT

AG

E

LI

N

ES

PA

R

TI

ES

R

ES

PO

N

SI

BL

E

FO

R T

H E

W O

R K, IN

C

LU

D

IN

G

C O

N

TR

AC

TO

R S

AR

E

LE

G

AL

LY

R

ES

PO

N

SI

BL

E

FO

R T

H E

SA

FE

TY

O

F C

O N

ST

R

U C

TI

O

N W

O R

KE

R

S U

N D

ER

T

H

IS

L

AW

. T H

IS

L

AW

C

AR

R

IE

S

BO

TH

C R

IM

IN

AL

A

N D

C

IV

IL

L

IA

BI

LI

TY

. T O

A R

R

AN

G E

FO

R

L

IN

ES

T

O B

E

TU

R N

ED

O

FF

O

R R

EM

O

VE

D

C

AL

L C

EN

TE

R

PO

IN

T

EN

ER

G Y

AT

(7

) 2

-2

2.

A C

TI

VI

TI

ES

O N

/O R

A C

R O

SS

C

EN

TE

R

PO

IN

T

EN

ER

G Y

FE

E

O R

E A

SE

M

EN

T

PR

O

PE

R

TY

N

O A

PP

R

O

VA

L

TO

U

SE

, C R

O

SS

O R

O C

C U

PY

C

EN

TE

R

PO

IN

T

FE

E

O R

E

AS

EM

EN

T

PR

O

PE

R

TY

IS

G

IV

EN

. I F

YO

U

N

EE

D T

O U

SE

C

EN

TE

R

PO

IN

T

PR

O

PE

R

TY

, P

LE

AS

E C

O N

TA

C

T O

U R

S U

R

VE

YI

N

G

R

IG

H T

O F

W

AY

D

IV

IS

IO

N A

T (7

) 2

-6

O R

(7

) 2

-5

9.

A T&

T

TE

XA

S/

SW

B

T

FA

C

IL

IT

IE

S:

1.

TH

E

LO

C

AT

IO

N S

O F

AT

&T

T

EX

AS

/S

W

BT

F

AC

IL

IT

IE

S

AR

E

SH

O

W N

IN

A

N A

PP

R

O

XI

M

AT

E W

AY

O

N

LY

. T H

E C

O N

TR

AC

TO

R

S H

AL

L

D

ET

ER

M

IN

E

TH

E

EX

AC

T

LO

C

AT

IO

N

B

EF

O R

E C

O M

M

EN

C

IN

G W

O R

K.

H

E

AG

R

EE

S

TO

B E

FU

LL

Y R

ES

PO

N

SI

BL

E

FO

R

A

LL

D

AM

AG

ES

W H

IC

H

M

IG

H T

BE

O

C C

AS

IO

N

ED

B Y

TH

IS

F

AI

LU

R

E

TO

E

XA

C

TL

Y

LO

C

AT

E

AN

D P

R

ES

ER

VE

T H

ES

E

U N

D

ER

G R

O U

N D

U

TI

LI

TI

ES

2.

TH

E C

O N

TR

AC

TO

R

S H

AL

L

C

AL

L 1-

0-

4-

(T

EX

AS

) A

M

IN

IM

U

M O

F

H O

U R

S

PR

IO

R

T O

C O

N

ST

R U

C

TI

O N

T O

H

AV

E U

N D

ER

G

R O

U N

D

LI

N

ES

F

IE

LD

L

O C

AT

ED

3.

W

H

EN

E

XC

AV

AT

IN

G

W

IT

H

IN

E

IG

H

TE

EN

IN

C H

ES

(1

8” ) O

F

TH

E

IN

D

IC

AT

ED

L O

C

AT

IO

N

O F

AT

&T

T

EX

AS

/S

W

BT

F

AC

IL

IT

IE

S, A

LL

E

XC

AV

AT

IO

N

S M

U

ST

B E

AC

C

O M

PL

IS

H

ED

U

SI

N G

N O

N -M

EC

H

AN

IZ

ED

E

XC

AV

AT

IO

N P

R O

C

ED

U R

ES

. W

H

EN

B O

R

IN

G , T

H E

C O

N

TR

AC

TO

R S

H

AL

L

EX

PO

SE

T H

E

AT

&T T

EX

AS

/S W

BT

F

AC

IL

IT

IE

S.

4.

W

H

EN

A T&

T

TE

XA

S/

SW

BT

F

AC

IL

IT

IE

S

AR

E

EX

PO

SE

D

, T H

E C

O N

TR

AC

TO

R

W

IL

L

PR

O

VI

D E

SU

PP

O R

T

TO

P R

EV

EN

T D

AM

AG

E

TO

T H

E C

O N

D U

IT

D

U C

TS

O

R C

AB

LE

S.

W

H

EN

E

XC

AV

AT

IN

G

N

EA

R T

EL

EP

H O

N E

PO

LE

S

TH

E C

O N

TR

AC

TO

R

S H

AL

L

BR

AC

E

TH

E

PO

LE

F

O R

S U

PP

O

R T.

5.

TH

E

PR

ES

EN

C E

O R

A

BS

EN

C

E O

F

AT

&T T

EX

AS

/S W

BT

U

N D

ER

G

R O

U N

D C

O N

D U

IT

F

AC

IL

IT

IE

S O

R B

U R

IE

D

C

AB

LE

F

AC

IL

IT

IE

S

SH

O W

N O

N T

H

ES

E

PL

AN

S

D O

ES

N

O T

M

EA

N T

H

AT

T H

ER

E

AR

E

N O

D

IR

EC

T

BU

R

IE

D

C

AB

LE

S

O R

O

TH

ER

C

AB

LE

S

IN

C O

N D

U

IT

IN

T

H E

AR

EA

6.

PL

EA

SE

C O

N

TA

C T

TH

E

AT

&T

T

EX

AS

D

AM

AG

E

PR

EV

EN

TI

O

N M

AN

AG

ER

K

EV

IN

R

AY

(7

) 6

-1

O

R E

-M

AI

L H

IM

k r7

6@ at t.c om

IF

C

AB

LE

LO

C

AT

E R

EQ

U

ES

TS

A R

E N

O T

C O

M

PL

ET

ED

F O

R O

U R

A T&

T

TE

XA

S/

SW

BT

F

AC

IL

IT

IE

S.

D

IR

EC

T

B U

R

IE

D C

A B

LE

L

O C

A

TE

S:

1.

TO

D

ET

ER

M

IN

E

TH

E

LO

C

AT

IO

N

O F

AT

&T

D

IR

EC

T

BU

R

IE

D

C

AB

LE

P

LA

N

T D

U R

IN

G

T H

E D

ES

IG

N P

H

AS

E O

F

YO

U R

P R

O

JE

C T, F O

LL

O

W T

H E

PR

O

C

ED

U R

E O

U

TL

IN

ED

B

EL

O W

2.

C

AL

L

1-

0-

4-

(T

EX

AS

) A N

D A

D

VI

SE

Y

O U

N

EE

D T

H E

EX

IS

TI

N

G A

T& T

TE

XA

S/

SW

BT

F

AC

IL

IT

IE

S

LO

C

AT

ED

F

O R

T H

E D

ES

IG

N P

H

AS

E O

F

YO

U R

P R

O

JE

C T.

P

LE

AS

E

AL

LO

W A

T

LE

AS

T

H

O U

R S

FO

R

T H

E C

AB

LE

S

TO

G

ET

M

AR

KE

D

B

EF

O R

E

SE

N D

IN

G

Y O

U R

F

IE

LD

C

R

EW

F O

R B

AS

E

LI

N

E

SU

R

VE

Y

FO

R L

O C

AT

ES

O F.

B E

SP

EC

IF

IC

O N

T H

E

PR

O

JE

C T

LO

C

AT

IO

N . T

H E

U

TI

LI

TY

L O

C

AT

O R

W

IL

L

FI

EL

D

L O

C

AT

E

TH

E

EX

IS

TI

N G

A T&

T

TE

XA

S/

SW

BT

F

AC

IL

IT

IE

S

W

IT

H O

R

AN

G E

PA

IN

T

AN

D /O

R F

LA

G

S.

3.

YO

U R

F

IE

LD

P

AR

TY

C

AN

S U

R

VE

Y

TH

E

BU

R

IE

D C

AB

LE

L O

C

AT

IO

N

U

SI

N G

T H

E O

R

AN

G E

M

AR

KS

O

N T

H E

G R

O U

N D

. I F

TH

E

C

AB

LE

S

AR

E

N O

T M

AR

KE

D , P

LE

AS

E C

O N

TA

C

T

TH

E

AT

&T T

EX

AS

D

AM

AG

E

PR

EV

EN

TI

O N

M

AN

AG

ER

K

EV

IN

R

AY

(7

) 6

-1

O R

E -M

AI

L k r7

6@ at t.c om

4.

D

EP

IC

T

TH

E

EX

AC

T

LO

C

AT

IO

N O

F

TH

E

AT

&T T

EX

AS

/S W

BT

D

IR

EC

T

BU

R

IE

D C

AB

LE

F

AC

IL

IT

IE

S

O N

T H

E

PL

AN

A

N D

P R

O

FI

LE

S

H

EE

TS

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

PROJECT LEGEND AND ABBREVIATIONS

SB

PG

NW

JA

N

. 2

N O

N E

A B

B R

EV

IA

TI

O

N S

AC

AC

R E

AP

PR

O X

AP

PR

O

XI

M

AT

E

BC

BA

C K

O F

C U

R B

B/ S

BA

C

KS

LO

PE

S

W

AL

E

BO

P

BE

G

IN

N

IN

G

O F

PR

O

JE

C

T

BM

P

BE

ST

M

AN

AG

EM

EN

T

PR

AC

TI

C

ES

C /L

C

EN

TE

R

LI

N

E

C J

C O

N

ST

R U

C

TI

O N

J O

IN

T

C N

P C

EN

TE

R

PO

IN

T

C O

H C

IT

Y

O F

H O

U

ST

O N

C O

N C

C O

N C

R

ET

E

C O

N

ST

C O

N

ST

R U

C

TI

O N

D

ET

D

ET

AI

L

D W

G D

R

AW

IN

G

E

EA

ST

IN

G

EA

EA

C H

EW

EA

C H

W

AY

EL

EV

EL

EV

AT

IO

N

EP

ED

G E

O F

PA

VE

M

EN

T

EO

P

EN

D

O F

PR

O

JE

C

T

ES

M

T

EA

SE

M

EN

T

EX

IS

T

EX

IS

TI

N G

EJ

EX

PA

N

SI

O

N J

O

IN

T

FG

FI

N

IS

H

ED

G R

AD

E

FL

FL

O W

LI

N

E

FM

FO

R C

EM

AI

N

FN

C

FE

N

C E

H C

FC

D

H

AR

R

IS

C O

U N

TY

F

LO

O

D C

O N

TR

O

L D

IS

TR

IC

T

H P

H

IG

H P

O

IN

T

JB

JU

N C

TI

O

N B

O X

LF

LI

N

EA

R F

EE

T

M

AI

N T

M

AI

N

TE

N

AN

C E

M

AX

M

AX

IM

U

M

M

IN

M

IN

IM

U

M

M

IS

C M

IS

C

EL

LA

N

EO

U S

N N

O R

TH

IN

G

N

TS

N O

T

TO

S C

AL

E

O C

O N

C

EN

TE

R

O H

O

VE

R H

EA

D

U

TI

LI

TY

L

IN

E

O H

W M

O R

D

IN

AR

Y

H

IG

H W

AT

ER

M

AR

K

PC

PO

IN

T

O F

C U

R

VA

TU

R

E

PI

PO

IN

T

O F

IN

TE

R

SE

C

TI

O N

PR

C

PO

IN

T O

F R

EV

ER

SE

C

U R

VA

TU

R E

PT

PO

IN

T

O F

TA

N

G

EN

C Y

P/ L

PR

O

PE

R

TY

L

IN

E

PE

R

M

PE

R

M

AN

EN

T

PR

O

P

PR

O

PO

SE

D

PT

PO

IN

T

PV

M

T

PA

VE

M

EN

T

R R

AD

IU

S

R

EI

N F

R

EI

N

FO

R C

IN

G

R O

W R

IG

H

T O

F W

AY

SA

N

SA

N

IT

AR

Y

SF

SQ

U

AR

E

FO

O T

ST

L

ST

EE

L

TB

M

TE

M

PO

R

AR

Y

BE

N

C H

M

AR

K

TE

M

P

TE

M

PO

R

AR

Y

TO

B

TO

P

O F

BA

N

K

TO

E

TO

E

O F

SL

O

PE

TY

P

TY

PI

C

AL

U N

O U

N

LE

SS

N

O

TE

D O

TH

ER

W

IS

E

W

W

IT

H

LE

G

EN

D

EX

IS

TI

N

G B

O R

EH

O

LE

L

O C

AT

IO

N

EX

IS

TI

N

G S

TR

U

C

TU

R E

PR

O

JE

C

T

BA

SE

LI

N E

EX

IS

TI

N

G R

IG

H

T- O

F- W

AY

EX

IS

TI

N

G L

O T

LI

N

E

EX

IS

TI

N

G E

AS

EM

EN

T

EX

IS

TI

N

G C

U

LV

ER

T

EX

IS

TI

N

G S

EW

ER

M

AN

H O

LE

EX

IS

TI

N

G S

TO

R

M M

AN

H

O

LE

EX

IS

TI

N

G S

TO

R

M

IN

LE

T

EX

IS

TI

N

G S

TO

R

M S

EW

ER

L

IN

E

EX

IS

TI

N

G S

AN

IT

AR

Y

SE

W

ER

EX

IS

TI

N

G F

O R

C

EM

AI

N

EX

IS

TI

N

G F

IR

E

H

YD

R

AN

T

EX

IS

TI

N

G W

AT

ER

V

AL

VE

EX

IS

TI

N

G W

AT

ER

M

ET

ER

EX

IS

TI

N

G W

AT

ER

L

IN

E

EX

IS

TI

N

G G

U Y

W

IR

E

EX

IS

TI

N

G P

O W

ER

P

O

LE

EX

IS

TI

N

G P

O W

ER

P

O

LE

W /R

IS

ER

EX

IS

TI

N

G O

VE

R

H

EA

D U

TI

LI

TY

L

IN

E

EX

IS

TI

N

G B

U R

IE

D

P O

W

ER

L

IN

E

EX

IS

TI

N

G T

EL

EC

O M

EX

IS

TI

N

G T

EL

EC

O M

M

AN

H O

LE

EX

IS

TI

N

G T

EL

EC

O M

H

AN

D H

O

LE

EX

IS

TI

N

G T

EL

EC

O M

P

ED

ES

TA

L

EX

IS

TI

N

G G

AS

L

IN

E

EX

IS

TI

N

G U

N

KN

O W

N U

TI

LI

TY

EX

IS

TI

N

G Q

L- C

Q

L- D

EX

IS

TI

N

G W

O O

D

EN

F

EN

C E

EX

IS

TI

N

G C

H

AI

N

LI

N K

FE

N

C E

EX

IS

TI

N

G P

IP

E

LI

N

E (M

AG

EL

LA

N

EX

IS

TI

N

G P

IP

E

LI

N

E (C

H

EV

R O

N

EX

IS

TI

N

G C

O N

C R

ET

E

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

IN

G

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D G

R

AS

S

LI

N

ED

A R

EA

EX

IS

TI

N

G T

O P

O F

SL

O

PE

EX

IS

TI

N

G T

O E

O F

SL

O

PE

PR

O

PO

SE

D T

O P

O F

SL

O

PE

PR

O

PO

SE

D T

O E

O F

SL

O

PE

EX

IS

TI

N

G C

H

AN

N

EL

F

LO

W D

IR

EC

TI

O

N

EX

IS

TI

N

G W

ET

LA

N D

S

SS G

AS

B O

R E

ST

AB

IL

IZ

ED

C O

N

ST

R U

C

TI

O N

A C

C

ES

S

R

EI

N

FO

R C

ED

S

IL

T

FE

N

C E

W

AT

ER

L

EV

EL

E

LE

VA

TI

O N

IN

LE

T

PR

O

TE

C

TI

O N

B

AR

R

IE

R

C O

N C

R

ET

E

TR

U C

K W

AS

H

O U

T

TY

PE

R

EI

N

FO

R

C

ED

R O

C K

FI

LT

ER

D

AM

H

YD

R O

M U

LC

H

D

ET

AI

L

N U

M

BE

R

SH

EE

T

N U

M

BE

R

VI

EW

D

IR

EC

TI

O N

SE

C

TI

O

N L

ET

TE

R

SH

EE

T

N U

M

BE

R

IP 1 10 A 10

SA

N

C

TW

FL

O

W

PI

PE

-1FM

PI

PE

-2

O

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

SS

PP

(S H

EE

T

N O

. 1 4)

PP

(S H

EE

T

N O

. 1 5)

PP

(S H

EE

T

N O

. 1 6)

BIGWOOD STREET

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

BE

G

IN

P

R O

JE

C

T

ST

A.

2+

.0 0 X

O H

O H

OH

OH

O H

O H

O H

O H

O H

O H

O H

SS SS

SSSS

U

O H

O H

O H

O H

O H

O H

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

SS

GAS

PP

(S H

EE

T

N O

. 1 7)

PP

(S H

EE

T

N O

. 1 8)

PP

(S H

EE

T

N O

. 1 9)

PARKER ROAD

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

GLEASON ROAD

EN

D

P R

O

JE

C T

ST

A.

9+

.0

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

PROJECT LAYOUT PLAN

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

BEGIN PROJECT STA. 11+50

MATCH LINE STA. 25+50

(THIS SHEET)

0'

END PROJECT STA. 40+00

MATCH LINE STA. 25+50

(THIS SHEET)

' H

C

FC

D D

R

AI

N

AG

E

EA

SE

M

EN

T

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

.O .W

' U

TI

LI

TY

E

AS

EM

EN

T

' U

TI

LI

TY

E

AS

EM

EN

T

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

.O .W

' U

TI

LI

TY

E

AS

EM

EN

T

' H

C

FC

D D

R

AI

N

AG

E

EA

SE

M

EN

T

' U

TI

LI

TY

E

AS

EM

EN

T

PR

O

P

LE

FT

H

IG

H

B A

N K

PR

O

P R

IG

H

T H

IG

H

B A

N K

PR

O

P R

IG

H

T H

IG

H

B A

N K

PR

O

P

LE

FT

H

IG

H

B A

N K

H C

FC

D

R O

W

H C

FC

D

R O

W

H C

FC

D

R O

W

H C

FC

D

R O

W

LE

G

EN

D

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

IN

G

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D G

R

AS

S

LI

N

ED

AR

EA

PR

O

PO

SE

D T

O P

O F

SL

O

PE

PR

O

PO

SE

D T

O E

O F

SL

PE

OH

H

O H

O H

O H

O H

O H

O H

O H

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

SS

BIGWOOD STREET

H C

FC

D

R O

W

H C

FC

D

R O

W

H C

FC

D

R O

W

C H

EV

R

O N

P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

GR

EM

O

VE

C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E

BO

TT

O

M

+0

+0

+0

+0

+0

+0

+0

EX

IS

T

TR

EE

L

IN

E

C N

P O

VE

R

H

EA

D E

LE

C

EX

IS

T

" R C

P

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T

FI

BE

R

O

PT

IC

B

O X

8" C

O H

W

AT

ER

LI

N E

(P

ER

S U

E

G

IM

S)

EX

IS

T

PI

PE

F

EN

C

E

EX

IS

T G

U

AR

D R

AI

L

EX

IS

T O

VE

R

H

EA

D E

LE

C

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T

" R C

P

H C

FC

D

R O

W

EX

IS

T

TO

E

O F

SL

O

PE

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

PR

O

PE

R

TY

L

IN

E

ST

A:

2+

ST

A:

2+

ST

A:

3+

ST

A:

4+

ST

A:

7+

ST

A:

2+

ST

A:

5+

ST

A:

6+

ST

A:

7+

ST

A:

7+

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

P1

-0

9-

R

EM

O

VE

D

IS

PO

SE

W

AT

ER

LI

N

E

(IN

C

ID

EN

TA

L

TO

C H

AN

N

EL

W

O R

K)

O H

O H

O H

O H

O H

O H

H G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

H C

FC

D

R O

W

H C

FC

D

R O

W

M

AG

EL

LA

N P

IP

EL

IN

E

C O

L P

C H

EV

R

O N

P

IP

EL

IN

E

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

-0

9-

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E

BO

TT

O

M

+0

+0

+0

+0

+0

+0

+0

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T

SA

N . S

W R

. M H

EX

IS

T

" R C

P

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T O

VE

R

H

EA

D E

LE

C

EX

IS

T W

O O

D F

EN

C

E

PR

O

PE

R

TY

L

IN

E

ST

A:

9+

ST

A:

9+

ST

A:

9+

ST

A:

0+

ST

A:

0+

ST

A:

1+

ST

A:

4+

ST

A:

1+

ST

A:

1+

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

CLEARING, GRUBBING & DEMO PLAN (1 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

BEGIN PROJECT STA. 11+50

MATCH LINE STA. 18+50

(SEE THIS SHEET)

MATCH LINE STA. 25+50

(SEE SHEET NO. 9)

MATCH LINE STA. 18+50

(SEE THIS SHEET)

N O

TE

S

1.

AL

L M

AT

ER

IA

L

TO

B

E R

EM

O

VE

D

SH

AL

L

BE

D

IS

C

AR

D

ED

O

FF

-S

IT

E.

1 2

LI

M

IT

S

O F

C

LE

AR

IN

G A

N D

G R

U

BB

IN

G

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

C O

N C

R

ET

E C

H

AN

N

EL

LI

N

IN

G

EX

IS

TI

N

G C

O N

C R

ET

E

EX

IS

TI

N

G R

IP

R

AP

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

R

IP

R

AP

R

EM

O

VE

A N

D D

IS

PO

SE

O

F C

O N

C R

ET

E

BO

TT

O M

C H

AN

N

EL

F

LO

W

EX

IS

TI

N

G C

U

LV

ER

T

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

C O

N C

R

ET

E O

R M

ET

AL

P

IP

E (A

LL

S

IZ

E)

PR

ES

ER

VE

A N

D P

R O

TE

C

T

EX

IS

TI

N G

T R

EE

S

LE

G

EN

D

X O

O H

O H

OH

OH

O H

O H

O H

O H

O H

O H

SS SS

SSSS

G

AS

G

AS

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

P

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1 P

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

P

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

H C

FC

D

R O

W

H C

FC

D

R O

W

C H

EV

R

O N

P

IP

EL

IN

E M

AG

EL

LA

N

P

IP

EL

IN

E C

O . L

P

C H

EV

R

O N

P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

E

-0

9-

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E

BO

TT

O

M

+0

+0

+0

+0

+0

+0

+0

PARKER ROAD

EX

IS

T C

H

AI

N

LI

N K

F

EN

C E

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T W

O O

D

FE

N C

E

C N

P O

VE

R

H

EA

D E

LE

C

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T

SA

N . S

W R

. M H

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

EX

IS

T

" R C

P

ST

A:

6+

ST

A:

6+

ST

A:

7+

ST

A:

7+

ST

A:

8+

ST

A:

8+

ST

A:

9+

32ST

A:

9+

ST

A:

1+

ST

A:

0+

ST

A:

1+

C O

H W

AT

ER

(P

ER

S U

E) C

O H

W

AT

ER

(P

ER

S

U E)

C N

P O

VE

R

H

EA

D

EL

EC

EX

IS

T

SA

N . S

W R

H C

FC

D

U N

IT

N

O P1

-0

9-

' D

R

AI

N

AG

E

ES

M T

VO

L

, P

G

, H C

M R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R 10

' U

TI

LI

TY

E

SM

T

VO

L

, P G

H

C M

R

ST

A:

5+

R

EM

O

VE

D

IS

PO

SE

W

AT

ER

LI

N

E

(IN

C

ID

EN

TA

L

TO

C H

AN

N

EL

W

O R

K)

O H

O H

O H

O H

O H

O H

O H

OH

O H

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

SS

GLEASON ROAD

C H

EV

R

O N

P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

H C

FC

D

R O

W H

C

FC

D R

O W

H C

FC

D

R O

W

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

H C

FC

D

R O

W

H C

FC

D

R

W

-0

9-

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

R

IP

R

AP

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E C

H

AN

N

EL

L

IN

IN

G

R

EM

O

VE

C O

N C

R

ET

E

BO

TT

O

M

+0

+0

+0

+0

+0

+0

+0

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

C N

P O

VE

R

H

EA

D E

LE

C

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T

" R C

P

C O

H W

AT

ER

(P

ER

S U

E)

EX

IS

T G

U

AR

D R

AI

L

M C

I F

IB

ER

O

PT

IC

L

IN

E

EX

IS

T

W O

O D

F

EN

C E

C N

P 2"

IP

S

TL

G

AL

L

IN

E

EX

IS

T G

U

AR

D R

AI

L

C O

H W

AT

ER

(P

ER

S U

E)

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T

" R C

P

EX

IS

T

" R C

P

EX

IS

T

" R

C P

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R 10

' U

TI

LI

TY

E

SM

T

VO

L

, P G

H

C M

R R

EM

O

VE

C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

ST

A:

2+

ST

A:

2+

96ST

A:

3+

ST

A:

7+

ST

A:

7+

ST

A:

8+

ST

A:

8+

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

R

EM

O

VE

D

IS

PO

SE

W

AT

ER

LI

N

E

(IN

C

ID

EN

TA

L

TO

C H

AN

N

EL

W

O R

K)

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

CLEARING, GRUBBING & DEMO PLAN (2 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

(SEE THIS SHEET)

MATCH LINE STA. 32+50

MATCH LINE STA. 32+50

(SEE THIS SHEET)

END PROJECT STA. 39+44.12

(SEE SHEET NO. 8)

MATCH LINE STA. 25+50

N O

TE

S

1.

AL

L M

AT

ER

IA

L

TO

B

E R

EM

O

VE

D

SH

AL

L

BE

D

IS

C

AR

D

ED

O

FF

-S

IT

E.

1 2

LI

M

IT

S

O F

C

LE

AR

IN

G A

N D

G R

U

BB

IN

G

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

C O

N C

R

ET

E C

H

AN

N

EL

LI

N

IN

G

EX

IS

TI

N

G C

O N

C R

ET

E

EX

IS

TI

N

G R

IP

R

AP

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

R

IP

R

AP

R

EM

O

VE

A N

D D

IS

PO

SE

O

F C

O N

C R

ET

E

BO

TT

O M

C H

AN

N

EL

F

LO

W

EX

IS

TI

N

G C

U

LV

ER

T

R

EM

O

VE

A N

D D

IS

PO

SE

O

F

EX

IS

TI

N G

C O

N C

R

ET

E O

R M

ET

AL

P

IP

E (A

LL

S

IZ

E)

PR

ES

ER

VE

A N

D P

R O

TE

C

T

EX

IS

TI

N G

T R

EE

S

LE

G

OHOH

X

O H

O H

O H

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

SS

SS SS

H

+0

+0

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

SC

A

C

TW

O H

O H

O H

O H

O H

O H

O H

OH

OH

O H

O H

GAS

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

IP

E-

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

IP

E-

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

IP

E-

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SS

SS

SA

N

G

AS

GAS

+0

+0

+0

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

SC

ASC

A

C

TW

SC

A

C

TW

SC

A

X

X

X

O H

O H

O H

OH

OH

OH

O H

O H

O H

O H

O H

O H

SS

SS SS

SS

SS

SSSS

SS

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

A

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

+0

+0

+0

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T

TO

P O

F

BA

N K

SC

A

SC

A

SC

A

SC

A

C

TW

C

TW

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

ACCESS PLAN

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

SC

AL

E:

B

IG

W O

O D

S

TR

EE

T

A C

C

ES

S H

O R

IZ

: 1

0'

SC

AL

E:

G

LE

A

SO

N R

O A

D A

C C

ES

S

H O

R

IZ

: 1

0'

SC

AL

E:

PA

R

K

ER

R O

A D

A C

C

ES

S H

O R

IZ

: 1

0'

BIGWOOD STREET

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

PARKER ROAD

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

GLEASON ROAD

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

' T

EM

PO

R A

R Y

A C

C

ES

S

ES

M T

ST

AB

IL

IZ

ED

C

O N

ST

R

U C

TI

O

N A

C C

ES

S

C O

N C

R

ET

E

TR

U C

K W

AS

H

O U

T (A

S D

IR

EC

TE

D

B Y

TH

E

EN

G

IN

EE

R

TE

M

PO

R

AR

Y

AC

C

ES

S

EA

SE

M

EN

T

SC

A

LE

G

EN

D

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

G

OH

O H

O H

O H

O H

O H

O H

O H

O H

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

P

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

P

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

SS

+0

+0

+0

+0

+0

+0

+0

+0

BIGWOOD STREET

H C

FC

D

R O

W

H C

FC

D

R O

W C

H

EV

R O

N P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

+0

+0

+0

+0

+0

+0

+0

+0

FD-2

PR

O

P H

IG

H

B

AN

K

PR

O

P H

IG

H

B

AN

K

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M

T

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M T

SC

A

C

TW

FDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFDFD

+0

++0

+0

+0

+0

3+

3+

3+

+0

4+

4+

4+

+0

5+

5+

5+

+0

6+

6+

6+

+0

7+

7+

7+

+0

8+

8+

8+

+0

9+

9+

9+

222222222222222222222222222222

O H

O H

O H

OH

O H

O H

O H

O H

O H

O H

O H

O H

SS SS

SSSS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

+0

+0

+0

+0

+0

+0

+0

+0

+0

PARKER ROAD

H C

FC

D

R O

W

M

AG

EL

LA

N P

IP

EL

IN

E

C O

L P

C H

EV

R

O N

P

IP

EL

IN

E C

O L

P

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E H

C

FC

D R

O W

H C

FC

D

R O

W

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

+0

+0

+0

+0

+0

+0

+0

+0

+0

PR

O

P H

IG

H

B

AN

K

PR

O

P H

IG

H

B

AN

K H

C

FC

D U

N

IT

N O

P

8-

-0

' D

R

AI

N

AG

E

ES

M T

VO

L

, P

G

, H C

M R

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M

T

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M T

SC

A

SC

A

SC

A

SC

A

C

TW

C

TW

+0

+0

+0

+0 000+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

26626

+0

+0

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

STORMWATER POLLUTION PREVENTION PLAN (1 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

BEGIN PROJECT STA. 11+50

MATCH LINE STA. 20+00

(SEE THIS SHEET) MATCH LINE STA. 28+50

(SEE SHEET 12)

MATCH LINE STA. 20+00

(SEE THIS SHEET)

R

EI

N

FO

R C

ED

S

IL

T

FE

N

C E

ST

AB

IL

IZ

ED

C

O N

ST

R

IC

TI

O N

A C

C

ES

S

TY

PE

(R

EI

N

FO

R C

ED

FI

LT

ER

D

AM

H

YD

R

O M

U

LC

H

TU

R

FG

R

AS

S

SE

ED

IN

G C

O N

C R

ET

E

TR

U

C K

W

AS

H O

U T

(A S

D

IR

EC

TE

D B

Y

TH

E

EN

G

IN

EE

R

TE

M

PO

R

AR

Y

AC

C

ES

S

EA

SE

M

EN

T

R

SF

SC

A

LE

G

EN

D

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

G

O H

O H

O H

O H

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1 P

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1 P

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2 P

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

+0

+0

+0

+0

+0

+0

C H

EV

R

O N

P

IP

EL

IN

E M

AG

EL

LA

N

P

IP

EL

IN

E C

O . L

P

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

+0

+0

+0

+0

+0

+0

PR

O

P H

IG

H

B

AN

K

PR

O P

H

IG

H B

AN

K

H C

FC

D

U N

IT

N

O P1

-0

9-

' D

R

AI

N

AG

E

ES

M T

VO

L

, P

G

, H C

M R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R 10

' U

TI

LI

TY

E

SM

T

VO

L

, P G

H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M

T

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M T

PR

O

P H

IG

H

B

AN

K

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

+0

3535355535

O H

O H

O H

O H

O H

OH

O H

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SS

GAS

+0

+0

+0

+0

+0

GLEASON ROAD

C H

EV

R

O N

P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

H C

FC

D

R O

W

H C

FC

D

R O

W

+0

+0

+0

+0

+0

PR

O

P H

IG

H

B

AN

K

' U

TI

LI

TY

E

SM

T

VO

L

, P G

H

C M

R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

0, H C

D R 10

' U

TI

LI

TY

E

SM

T

VO

L

, P G

H

C M

R

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

SC

EN

IC

W

O O

D S

VO

L.

6, P G

, H

C M

R

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M T

AS

++0+

PR

O

P H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

' T

EM

PO

R

AR

Y

AC

C

ES

S

ES

M T

SC

ASC

A

SC

A

C

TW

C

TW

SC

A

+0

00+0

+0

+0

+0

+0

+0

+0

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

STORMWATER POLLUTION PREVENTION PLAN (2 OF 2)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

(SEE THIS SHEET)

MATCH LINE STA. 35+00

MATCH LINE STA. 35+00

(SEE THIS SHEET)

END PROJECT STA. 40+00

(SEE SHEET NO. 8)

MATCH LINE STA. 29+50

R

EI

N

FO

R C

ED

S

IL

T

FE

N

C E

ST

AB

IL

IZ

ED

C

O N

ST

R

IC

TI

O N

A C

C

ES

S

H

YD

R O

M U

LC

H

TU

R

FG

R

AS

S

SE

ED

IN

G

C O

N C

R

ET

E

TR

U C

K W

AS

H

O U

T (A

S D

IR

EC

TE

D

B Y

TH

E

EN

G

IN

EE

R

TE

M

PO

R

AR

Y

AC

C

ES

S

EA

SE

M

EN

T

R

SF

SC

A

LE

G

EN

D

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

IN

G

TY

PE

(R

EI

N

FO

R

C

ED

FI

LT

ER

AM

3035404550556065

3035404550556065

0+

0+

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

1+

1+

1+

H C

FC

D

U N

IT

N

O . P

8-

-0

EX

IS

T

' D

R

AI

N

AG

E

EA

SE

M

EN

T

VO

L

, P

G

H C

M R

EX

IS

T

' T

EX

AS

P

IP

EL

IN

E

C O

M

PA

N Y

R .O

.W

VO

L

, P G

S

H C

M R

8" T

H

IC

K C

H

AN

N

EL

L

IN

IN

G

EX

IS

T G

R O

U N

D

TO

E

W

AL

L

M

AT

C H

EX

IS

TI

N

G

1:1

1:1

8" T

H

IC

K C

H

AN

N

EL

L

IN

IN

G

1'

TO

E W

AL

L

3'

1' 2'

3:

4:

1M

AT

C H

EX

IS

TI

N

G

4'

R

IP

R

AP

G R

AD

AT

IO

N

N O

. 2 (2

4" T

H

IC

K)

G R

AS

S-

LI

N

E G

R

AS

S-

LI

N E

2'

HCFCD ROW/

PROPERTY LINE

PROPERTY LINE

' U

TI

LI

TY

E

AS

EM

EN

T

VO

L

, P

G

H C

M R

HCFCD ROW/ ESMT LINE10

' U

TI

LI

TY

E

AS

EM

EN

T

VO

L

, P

G

H C

M R

UTILITY ESMT LINE

UTILITY EASEMENT LINE

1'

2'

2'

D

TL 36

D

TL 36

303540455055606570

303540455055606570

0+

0+

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

1+

1+

1+

M

AT

C H

EX

IS

TI

N

G

1:1

1:1

8" T

H

IC

K C

H

AN

N

EL

L

IN

IN

G

EX

IS

T G

R O

U N

D

TO

E

W

AL

L

8" T

H

IC

K C

H

AN

N

EL

L

IN

IN

G

1'

TO

E W

AL

L

3'

1' 2'

M

AT

C H

EX

IS

TI

N

G

2:

3:

R

IP

R

AP

G R

AD

AT

IO

N

N O

. 2 (2

4" T

H

IC

K)

G R

AS

S-

LI

N

E G

R

AS

S-

LI

N E

4'

2'

EX

IS

T.

0' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

.O .W

VO

L

, P

G S

H

C M

R

H C

FC

D

U N

IT

N

O . P

8-

-0

EX

IS

T

' D

R

AI

N

AG

E

EA

SE

M

EN

T

VO

L

, P

G

H C

M R

HCFCD ROW/

PROPERTY LINE

PROPERTY LINE

HCFCD ROW/ ESMT LINE10

' U

TI

LI

TY

E

AS

EM

EN

T

VO

L

, P

G

H C

M R

' U

TI

LI

TY

E

AS

EM

EN

T

VO

L

, P

G

H C

M R

UTILITY ESMT LINE

UTILITY ESMT LINE

1'

2'

2'

D

TL 36

D

TL 36

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

TYPICAL SECTIONS

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

SC

AL

E:

TY

PI

C A

L

SE

C

TI

O N

(S

TA

. 1 1+

T

O S

TA

. 2

6+

H

O R

IZ

: 1

0'

VE

T:

0'

SC

AL

E:

TY

PI

C A

L

SE

C

TI

O N

(S

TA

. 2 7+

T

O S

TA

. 3

7+

H

O R

IZ

: 1

0'

VE

T:

0'

N O

TE

S

1.

R

EF

ER

T O

S H

EE

T

N O

FO

R

IN

FO

R M

AT

IO

N O

N

TH

E C

H

AN

N

EL

L

IN

IN

G

SE

C

TI

O

N D

ET

AI

L.

2.

C

O N

TR

AC

TO

R

S H

AL

L

G R

AD

E

EX

IS

TI

N

G G

R O

U N

D T

O D

R

AI

N

IN

TH

E

-F

T

EA

SE

M

0.

3%

EX

IS

T G

R O

U N

D

EX

IS

T R

T H

IG

H

B

AN

K

EX

IS

T

LT

H

IG

H B

AN

K

EX

IS

T D

U

AL

" R

C P

BI

G

W O

O D

S

TR

EE

T

P1

-0 9-

C

EN

TE

R

LI

N E

363840424446485052

363840424446485052

+5

+0

+0

+0

+0

+8

EL

EV

=3 8.

EX

IS

T

" R C

P

EX

IS

T 8"

W L

TO

P

O F

C H

AN

N

EL

L

IN

IN

G

EL

EV

=4

5.

TO

P

O F

C H

AN

N

EL

LI

N

IN

G

EL

EV

=4

4.

EX

IS

T 8"

W L

6" M

IN

C

LE

AR

AN

C

E

FR

O M

E

XI

ST

0" R

C P

(P

ER

C O

H D

W G

7)

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

O . 2

PR

O

P C

H

AN

N

EL

F

LO

W L

IN

E

PR

O

P

LT

H

IG

H B

AN

K

PR

O

P R

T H

IG

H

B

AN

K

PR

O

P C

H

AN

N

EL

L

IN

IN

G

PR

O

P C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

PR

O

P H

EA

D

W

AL

L

SE

E

SH

EE

T

N O

O H

OHOH

X

O H

O H

O H

O H

O H

O H

O H

O H

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

SS

SS SS

H

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

H C

M R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T

TO

P O

F

BA

N K

EX

IS

T

TO

P O

F

BA

N K

EX

IS

T

TO

E O

F

SL

O

PE

' C

H

AN

N

EL

W

ID

TH

C H

EV

R

O N

P

IP

EL

IN

E

M

AG

EL

LA

N P

IP

EL

IN

E

C O

. L P

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T O

VE

R

H

EA

D E

LE

C

EX

IS

T

" R C

P

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T O

VE

R

H

EA

D E

LE

C

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T

FI

BE

R

O

PT

IC

B

O X

AB

AN

D O

N

ED

" C

I W L

(P

ER

S U

E

EX

IS

T

PI

PE

F

EN

C

E

EX

IS

T 6'

W O

O D

F

EN

C E

EX

IS

T G

U

AR

D R

AI

L

EX

IS

T

" R C

P

EX

IS

T

" R C

P

EX

IS

T

" E

XP

O

SE

D P

IP

E

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

BIGWOOD

STREET

+0

+0

+0

+0

EX

IS

T

SA

N

SW

R M

H

AB

AN

D O

N

ED

6"

F M

AB

AN

D O

N

ED

6"

F M

AB

AN

D O

N

ED

F M

M H

EX

IS

T 8"

W L

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T 8"

S

AN

S W

-0

9-

PR

O

P

TO

E O

F

SL

O

PE

PR

O

P H

IG

H

B

AN

K

PR

O P

TO

E

O F

SL

O

PE

PR

O

P H

IG

H

B

AN

K

PR

O

P

TO

P O

F C

H

AN

N

EL

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P

TO

P O

F C

H

AN

N

EL

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

O

(2

4" T

H

IC

K)

BE

G

IN

P R

O

JE

C T

ST

A

+0

N

: 1

3.

E:

.4

PR

O

P H

EA

D

W

AL

L

SE

E

SH

EE

T

N O

- 8

" C U

T

PL

U G

A N

D

AB

AN

D

O N

ED

- 8

" C U

T

PL

U G

A N

D

AB

AN

D

O N

ED

PR

O

P

LF

O F

8-

FT

W

ID

E

TE

M

PO

R

AR

Y

AC

C

ES

S M

AT

TI

N G

EX

IS

T

TO

E O

F

SL

O

PE

MATCH LINE STA 15+80

(SEE SHEET 15)

0' SC

AL

E:

H

O R

Z:

VE

R T:

1"

1"

0'

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

PLAN & PROFILE (1 OF 6)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

LE

G

EN

D

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

IN

G

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D G

R

AS

S

LI

N

ED

AR

EA

PR

O

PO

SE

D T

O P

O F

SL

O

PE

PR

O

PO

SE

D T

O E

O F

SL

O

PE

N O

TE

S

1.

C

O N

TR

AC

TO

R

S H

AL

L

G R

AD

E

IN

SI

D E

TH

E

-F

T

EA

SE

M

EN

T

TO

P

R O

VI

D

E

PO

SI

TI

VE

D

R

AI

N

AG

E

TO

W

AR

D S

TH

E

C H

AN

N

EL

W

H

EN

A

PP

LI

C

AB

LE

2.

C

O N

TR

AC

TO

R

S H

AL

L

M O

BI

LI

ZE

T

H E

C O

N

ST

R U

C

TI

O N

V

EH

IC

LE

S / E

Q U

IP

M

EN

T

W

IT

H

IN

TH

E

FI

R

ST

0-

FE

ET

O

F

TH

E M

AG

EL

LA

N

A C

C

ES

S

EA

SE

M

EN

T.

TE

M

PO

R

AR

Y

AC

C

ES

S

M

AT

S

O H

O H

O H

O H

O H

O H

O H

O H

O H

C P-

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

C

CC

CCC

6666EX

IS

T

TR

EE

L

IN

E

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

H C

M R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

H C

FC

D

R O

W

EX

IS

T

TO

E O

F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

H C

FC

D

R O

W

' C

H

AN

N

EL

W

ID

TH

C H

EV

R

O N

P

IP

EL

IN

E M

AG

EL

LA

N

P

IP

EL

IN

E C

O . L

P

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

LE

C

EX

IS

T O

VE

R

H

EA

D E

LE

C

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

C

EX

IS

T

SA

N

SW

R

M H

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T

W O

O D

F

EN

C E

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

+0

+0

+0

+0

+0

N

ED

6"

F M

EX

IS

T 8"

S

AN

S W

R

AB

AN

D O

N

ED

6"

F M

EX

IS

T 8"

S

AN

S W

R

PR

O P

H

IG

H B

AN

K

PR

O

P H

IG

H

B

AN

K

PR

O

P

TO

E O

F

SL

O

PE

PR

O

P

TO

E O

F

SL

O

PE

PR

O

P

TO

P O

F C

H

AN

N

EL

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P

TO

P O

F C

H

AN

N

EL

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

. 2

-0

9-

PR

O

P

LF

O F

8-

FT

W

ID

E

TE

M

PO

R

AR

Y

AC

C

ES

S M

AT

TI

N G

MATCH LINE STA 15+80

(SEE SHEET 14)

MATCH LINE STA 20+40

(SEE SHEET 16)

P1

-0 9-

C

EN

TE

R

LI

N E

363840424446485052

363840424446485052

+8

+0

+0

+0

+0

+0

+4

0.

3%

EX

IS

T G

R O

U N

D

EX

IS

T R

T H

IG

H

B

AN

K

EX

IS

T

LT

H

IG

H B

AN

K

EX

IS

T

" R C

P

PR

O

P R

T H

IG

H

B

AN

K

PR

O

P

LT

H

IG

H B

AN

K

PR

O

P C

H

AN

N

EL

F

LO

W L

IN

E

PR

O

P C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

O . 2

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re ew ay

, S ui te

Ho us to n, T

X

0.4

.10

SC

AL

E:

PLAN & PROFILE (2 OF 6)

SB

PG

NW

JA

N

. 2

AS

S

H O

W N

0' SC

AL

E:

H

O R

Z:

VE

R T:

1"

1"

0'

LE

G

EN

D

PR

O

PO

SE

D R

IP

R

AP

G

R

AD

AT

IO

N N

O

PR

O

PO

SE

D G

R

AS

S

LI

N

ED

AR

EA

PR

O

PO

SE

D T

O P

O F

SL

O

PE

PR

O

PO

SE

D T

O E

O F

SL

O

PE

PR

O

PO

SE

D

" T H

IC

K

C O

N C

C H

AN

N

EL

L

IN

IN

G

N O

TE

S

1.

C

O N

TR

AC

TO

R

S H

AL

L

G R

AD

E

IN

SI

D E

TH

E

-F

T

EA

SE

M

EN

T

TO

P

R O

VI

D

E

PO

SI

TI

VE

D

R

AI

N

AG

E

TO

W

AR

D S

TH

E

C H

AN

N

EL

W

H

EN

A

PP

LI

C

AB

LE

2.

C

O N

TR

AC

TO

R

S H

AL

L

M O

BI

LI

ZE

T

H E

C O

N

ST

R U

C

TI

O N

V

EH

IC

LE

S / E

Q U

IP

M

EN

T

W

IT

H

IN

TH

E

FI

R

ST

0-

FE

ET

O

F

TH

E M

AG

EL

LA

N

A C

C

ES

S

EA

SE

M

EN

T.

TE

M

PO

R

AR

Y

AC

C

ES

S

M

AT

S

O H

O H

O H

O H

O H

O H

O H

O H

C P-

G

AS

G

AS

G

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-1

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

PI

PE

-2

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

' T

EX

AS

P

IP

EL

IN

E C

O M

PA

N

Y R

O W

VO

L

, P G

S

H C

M R

' U

TI

LI

TY

E

SM

T

VO

L

, P

G

H C

M R

H C

FC

D

R O

W

H C

FC

D

R O

W

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

EX

IS

T H

IG

H

B

AN

K

EX

IS

T

TO

E

O F

SL

O

PE

M

AG

EL

LA

N P

IP

EL

IN

E

C O

L P

C H

EV

R

O N

P

IP

EL

IN

E

' C

H

AN

N

EL

W

ID

TH

C

AU

TI

O

N

U N

D

ER

G R

O U

N D

G

AS

L

IN

E

C N

P 2"

IP

S

TL

G

AS

L

IN

E

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T W

O O

D F

EN

C

E

EX

IS

T

SA

N

S W

R M

H

EX

IS

T

" R C

P

EX

IS

T C

H

AI

N

LI

N K

FE

N

C E

EX

IS

T O

VE

R

H

EA

D E

LE

C

O D

F

EN

C E

H C

FC

D

U N

IT

N

O P

8-

-0

' D R

AI

N

AG

E

ES

M

T

VO

L

, P G

, H

C M

R

+0

+0

+0

+0

+0

EX

IS

T 8"

S

AN

S W

R

AB

AN

D O

N

ED

6"

F M

EX

IS

T 8"

S

AN

S W

R

EX

IS

T

SW

R

PR

O

P H

IG

H

B

AN

K

PR

O

P H

IG

H

B

AN

K

PR

O

P

TO

E O

F

SL

O

PE

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

O . 2

PR

O

P

TO

E O

F

SL

O

PE

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P

TO

P O

F C

H

AN

N

EL

PR

O

P

BO

TT

O

M O

F C

H

AN

N

EL

PR

O

P

TO

P O

F C

H

AN

N

EL

P

PR

O

PR

O

P

PR

O

P T

-0

9-

MATCH LINE STA 20+40

(SEE SHEET 15)

MATCH LINE STA 25+00

(SEE SHEET 17)

0.

3%

EX

IS

T G

R O

U N

D

EX

IS

T R

T H

IG

H

B

AN

K

EX

IS

T

LT

H

IG

H B

AN

K

EX

IS

T

" R C

P

P1

-0 9-

C

EN

TE

R

LI

N E

384042444648505254

384042444648505254

+4

+0

+0

+0

+0

+0

PR

O

P R

T H

IG

H

B

AN

K

PR

O

P

LT

H

IG

H B

AN

K

PR

O

P C

H

AN

N

EL

F

LO

W L

IN

E

PR

O

P R

IP

R

AP

G

R

AD

AT

IO

N N

O . 2

PR

O

P C

O N

C R

ET

E

C H

AN

N

EL

L

IN

IN

G

SH

EE

T N

U M

BE

R

D

AT

E:PREPARED:

CHECKED:

APPROVED:

O

FCHECKED:

APPROVED:

REVDESCRIPTIONDATEAPPR

HCFCD PROJECT ID# P118-09-00-X014

CONCRETE CHANNEL REPAIR HCFCD

UNIT# P118-09-00

0 K at y F re…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .