Intersection Improvements at SW Alsbury Blvd & NW John Jones Drive.
Closed State & local contract opportunity Posted
- Solicitation number
- RFCSP 2026-019
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91327 Construction, Highway And Road
- 28576 Street And Highway Lighting Luminaires, Accessories And Parts
- 91364 Maintenance And Repair: Airport Roadway, Runway And Taxiway
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 96861 Pavement Marking Services (Including Removal Of Markings)
- UNSPSC codes
- 95111601 Street or avenue or road or boulevard
- 72151306 Pavement marking service
- 72141000 Highway and road construction services
- 72141001 Highway and road new construction service
- 72141105 Sidewalk construction and repair service
- 39111603 Roadway or highway lighting
- 72141103 Highway and road paving service
- 72152705 Sidewalk or ramp construction service
Opportunity details come from burlesontx.bonfirehub.com. Updated .
About this opportunity
The City of Burleson, Texas, located in Johnson County, issued Request for Competitive Sealed Proposals (RFCSP) 2026-019 for intersection improvements at SW Alsbury Boulevard and NW John Jones Drive. The project (Project No. 197409) involves constructing new right-turn lanes with stabilized subgrade and concrete pavement on both roadways, installing pavement striping, new traffic signals and associated conduit infrastructure, adjusting water and sanitary sewer utilities including service modifications and manhole relocations, and upgrading storm drainage systems with curb inlet reconstruction. Qualified contractors must demonstrate comparable experience with similar projects, provide references, possess adequate financial capability, and designate key personnel with relevant project experience. The evaluation criteria allocate 50 points to proposal price, 10 points to firm profile and financial capability, 20 points to prime contractor's comparable experience and references, 15 points to key personnel with similar project experience, and 5 points to compliance with RFCSP requirements. The virtual pre-bid conference occurred on April 15, 2026 at 10:00 AM CST via Microsoft Teams, with final questions due by April 22, 2026 and a final addendum issued on April 24, 2026. Sealed proposals were submitted electronically through the City's Bonfire e-procurement system by April 30, 2026 at 3:00 PM CST, with the virtual bid opening scheduled for the same date and time. The contract term extends until May 28, 2027, with work to be completed within 150 calendar days from the written notice to commence.
All bidders must comply with Texas Local Government Code requirements, including prevailing wage provisions applicable to municipal construction in the project area and non-resident bidder underbidding requirements. Contractors must submit a 5% bid bond based on total bid amount, with performance, payment, and maintenance bonds equaling 100% of the contract price required upon award. All awarded contractors must complete and submit a Form W-9 (Request for Taxpayer Identification Number and Certification) prior to payment, providing accurate federal tax classification and either a Social Security Number or Employer Identification Number for proper tax reporting and federal withholding compliance. The contract includes liquidated damages of $500 per day for project delays, applicable to contracts valued between $100,000 and $1,000,000. No specific set-asides for disadvantaged enterprises, minority-owned businesses, women-owned businesses, or other protected classes are identified in the available documentation. The City of Burleson retains the right to award the contract based on best value, reject any proposal, waive defects, or re-solicit if deemed in the City's interest. No incumbent contractor or specific budget range was identified in the procurement documents.
Opportunity text
The project includes constructing new right-turn lanes on SW Alsbury Blvd and NW John Jones Dr with stabilized subgrade and concrete pavement. Includes striping, new traffic signals and conduit, utility adjustments (water and sewer), and storm drainage upgrades like curb inlet reconstruction.
Files