Infrastructure Upgrades and Solar Array Installation for Closed Verona Landfill

Closed State & local contract opportunity

Solicitation number
RFP 324018
State
Wisconsin
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Dane County's Department of Waste & Renewables is seeking proposals for a comprehensive infrastructure upgrade and solar array installation project at the closed Verona Landfill. The procurement opportunity is divided into two distinct categories: Category 1 focuses on Landfill Infrastructure Upgrades, which includes site assessments, permitting, and construction oversight, while Category 2 centers on Solar Design, Construction, and Operations. The project aims to develop a 3.0 MW solar array system on approximately 50 acres of the landfill, utilizing four specific parcels (062/0608-141-8501-0, 062/0608-141-8021-1, 062/0608-141-9002-0, and 062/0608-141-9521-4). Key objectives include supporting Dane County's goals of reducing greenhouse gas emissions by 50% countywide by 2030 and achieving carbon neutrality by 2050, with a specific focus on transitioning to renewable electricity sources. The Request for Proposal (RFP) was released on December 18, 2024, with a deadline for questions on February 4, 2025, and proposal submissions due on February 18, 2025, at 2:00 pm. Proposers may choose to respond to one or both categories, with the county seeking creative business plans that minimize capital and operating costs while maximizing return.

The solicitation does not explicitly mention specific set-aside designations or restrictions on responding organizations. The project is open to various ownership models, including third-party ownership, and aims to leverage funding sources such as the Inflation Reduction Act's clean electricity production credits, with a particular emphasis on brownfield development bonuses. While no incumbent vendors are specified, the project will require integration with existing landfill infrastructure, including a leachate collection system and landfill gas collection system. The contract term is proposed for a maximum of five years, with a land lease minimum of 20 years and options to extend. Although a specific budget range is not provided, the project will require careful design to maintain the landfill's environmental integrity, including using ballast-design array anchors and obtaining Wisconsin Department of Natural Resources (WDNR) approvals. The solar array will replace declining landfill gas electrical generation and support the increasing electrical demand from growing county operations, with all renewable energy credits (RECs) assigned directly to Dane County.

Opportunity text

The Dane County (County) Department of Waste & Renewables (W & R) is inviting proposals for the design, permitting, construction, and operation of a solar array development to be located at the closed Verona Landfill (4654 Maple Grove Drive, Verona, WI). The scope of work will include two categories:

Category 1: Landfill Infrastructure Upgrades
Phase 1: Site Assessment
Phase 2: Site Assessment for Beneficial Use of Landfill Gas
Phase 3: Permits
Phase 4: Construction Documents
Phase 5: Construction Oversight

Category 2: Solar Design, Construction, and Operations

Each category is detailed in the Scope of Work. Proposers may choose to respond to one or both of the categories.

W & R is responsible for the management and operation of Dane County owned landfills, a renewable natural gas (RNG) facility, Clean Sweep (a household hazardous waste and electronics recycling program), a construction and demolition (C & D) recycling facility, and various other recycling programs for materials like tires and shingles. W & R's mission is to provide environmentally sound and sustainable waste management and renewable energy solutions for current Dane County residents and future generations.

The closed Verona Landfill is managed by W & R. The closed landfill is a part of a larger County complex which includes the Badger Prairie Needs Network, the Badger Prairie Health Care Center, Dane County Consolidated Food Service, and Badger Prairie County Park. The four parcels being considered for solar array development are:

062/0608-141-8501-0
062/0608-141-8021-1
062/0608-141-9002-0
062/0608-141-9521-4

The landfill contains both a leachate collection system and landfill gas collection system (GCS). Until recently, the landfill gas was used in two combustion engines that had been producing 175 kW of power. The electricity was used to offset the electricity consumption of the Badger Prairie Health Care Center, Badger Prairie Needs Network, and Dane County Consolidated Food Service. The gas generated from the landfill will eventually decrease to a non-viable level for electrical generation. Dane County will maintain gas collection and electrical generation as long as it is environmentally and fiscally responsible.

Dane County has the goals of reducing greenhouse gas emissions by 50% countywide by 2030 and becoming carbon neutral by 2050. Dane County has the goal to be carbon neutral for county operations by 2030. A key objective in achieving these goals is transitioning Dane County's electrical consumption to renewable energy sources. This transition to 100% renewable electricity was achieved by the County in 2024. The transition was accomplished through regional utility grid portfolio upgrades and Dane County renewable energy projects, such as the Yahara Solar Project and the Dane County Regional Airport Solar project.

An increase in electrical demand from growing County operations will require additional renewable electricity and is the primary motivation for this project.