Milestone_Worksheet.pdf

PDF 131 KB Posted

Attached to
Infrastructure Upgrades and Solar Array Installation for Closed Verona Landfill
Solicitation number
RFP 324018
Issued by
Dane County, Wisconsin

About this file

The document is a Milestone Worksheet (Gantt Chart) for the Verona Solar project by Dane County's Department of Waste & Renewables, detailing a comprehensive two-category project timeline starting on 05/01/2024. The chart outlines project phases for landfill infrastructure upgrades and solar design/construction, including site assessments, permitting, design, bidding assistance, construction oversight, and solar array operations. Key project components include site design, rezoning and interconnection applications, and array construction and commissioning.

The project aims to develop a solar array at the closed Verona Landfill, aligning with Dane County's sustainability goals of reducing greenhouse gas emissions by 50% countywide by 2030 and achieving carbon neutrality by 2050. The solar development will utilize four specific parcels and is motivated by the need to replace declining landfill gas electrical generation with renewable energy sources. The project supports the county's transition to 100% renewable electricity and addresses increasing electrical demand from growing county operations, with the solar array strategically located at a county complex that includes multiple facilities.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Verona Solar Estimated Timeline - Monthly Gantt Chart Example Project Start Date: 05/01/2024

TASK NAME

START

DATE

END

DATE

Category 1: Landfill Infrastructure Upgrades Phase 1: Site Assessment Phase 2: Site Assessment for Beneficial Reuse of LFG Phase 3: Permits Phase 4: Design and Construction Documents Phase 5: Bidding Assistance Phase 6: Construction Oversite and Record Documentation

Category 2: Solar Design, Construction, and Operations Preliminary Sizing Site Design Rezoning Application Interconnection Application Array Construction and Commission Operations

Sheet1

File details come from the government source that posted it. Updated .