ICN OSP Project # 77244807, Polk Co

Open State & local contract opportunity Posted

Solicitation number
26-032
State
Iowa
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidopportunities.iowa.gov. Updated .

About this opportunity

The Iowa Telecommunications and Technology Commission, operating the Iowa Communications Network (ICN), is soliciting sealed lump-sum bids under ITB 26-032 for a City of Des Moines cable relocation, with bids due November 23, 2026 at 12:00 p.m. central time. All materials must be Build America, Buy America Act (BABA) compliant because the project is federally funded through infrastructure programs that require BABA compliance.

Scope covers supply and installation of 3-inch HDPE conduit, armored single-mode outside plant fiber optic cable, and Type III and Type IV polymer concrete handholes along SE 14th Street from the Des Moines River to the Viaduct Bridge in Polk County. The contractor installs five Type III handholes (36" x 24" x 30") and three Type IV handholes (48" x 30" x 36"), removes approximately 2,800 feet of old cable, leaves pull rope and tracer wire in all conduits, and secures all Iowa One Call locates and private utility locates as needed. Insurance requires $3 million general liability aggregate, $1 million per occurrence, and $1 million automobile liability. Bidders must sign the Bid Proposal Compliance Form (Attachment 2) and the Authorization to Release Information Form (Attachment 3) or face automatic rejection.

ICN will award to the lowest-cost vendor meeting all ITB requirements. Bids require a lump-sum price with a labor and materials breakdown. An evaluation committee recommends to the Executive Director, who makes the final selection. Work may begin upon award and must finish no later than March 31, 2027, with extension possible for weather or unforeseen construction problems, and ICN requests completion before winter frost. Payment follows punch list verification, which includes a two-week initial review, a two-week contractor correction period, and a one-week verification period. The selected vendor must execute the contract within 60 days of the Notice of Intent to Award.

No vendor conference or site visit is scheduled. Sealed bids go to Sheri Stephens, ICN Contracting, at the ICN office in Des Moines, where bids open at the same time as the deadline. Technical contacts are Chris Harris (Engineering/Design), Paul Damge (Materials), and Jason Akers (Splice Coordination, requiring two weeks' notice).

Opportunity text

This is a City of Des Moines cable relocation project that will be managed by the ICN.

Files

File Type Posted
Engineering Plans.pdf PDF
Typicals.pdf PDF
SOW.docx DOCX document
Checklist.pdf PDF
26-032 ITB OSP.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors