Checklist.pdf

PDF 134 KB Posted

Attached to
ICN OSP Project # 77244807, Polk Co
Solicitation number
26-032
Issued by
Polk County, Iowa

About this file

This is a Construction Site Inspection Checklist for the Iowa Communications Network (ICN) OSP Project #77244807 in Polk County, a City of Des Moines cable relocation project managed by the ICN. The checklist provides a comprehensive quality assurance framework for inspecting fiber optic cable installation and related infrastructure work. The document outlines required inspections across six major categories: excavated areas (backfill, restoration, debris removal), installation-related items (cable/conduit depth and positioning, marker installation), handhole installation (grade setting, base preparation, conduit clearance, and sealing), cable installation (damage assessment, bend radius verification, coiling, and snap-around placement), locate facilities (ground rod installation, bonding, tracer wire routing, and facility testing), and building entrance/terminations (conduit securing, penetration sealing, grounding, fiber panel installation, and proper labeling). Each category contains specific checkpoints that must be verified during construction site inspections to ensure compliance with project standards.

The checklist serves as a quality control and compliance verification document without addressing pricing terms, set-asides, funding sources, or contractual pricing arrangements. The document functions as an operational tool for project management and inspection protocols rather than as a solicitation or award document containing procurement-specific information such as cost, incumbent status, or funding details.

View the file

Other files

File Type Posted
26-032 ITB OSP.docx DOCX document
SOW.docx DOCX document
Typicals.pdf PDF
Engineering Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Iowa Communications Network

Construction Site Inspection Checklist

Excavated Areas

• backfilled, restored, & tamped

• lawn restored

• concreted restored

• trash/debris removed

Installation Related Items

• cable/conduit at proper depth

• located within row

• markers installed

Handhole(s) Installation

• set at grade or provide depth

• crushed rock in base

• wire mesh on top of rock

• conduit(s) min. 6-in above rock

• conduit(s) plugged

• pull rope installed

• tracer wire conduit plugged

• backfilled / compacted

Cable Installation

• any visible damage to cable

• bend radius maintained

• cable properly coiled

• snap arounds installed

Locate Facilities

• ground rod installed per standards

• #6 bare copper bonded with ground clamp

• tracer wire routed into closure

• directions labeled

• locate facility tested and verified

Building Entrance/Terminations

• exterior conduit secured

• penetrations sealed

• locate facility installed (if appl)

• #10 ground to ground bar

• #10 grounded properly (lug)

• fiber panel installed correctly

• bulkhead installed correctly

• panel(s) labeled

• cable routed correctly