This is a Statement of Work (SOW) for a City of Des Moines cable relocation project managed by the Iowa Communications Network (ICN). The project involves the supply and installation of 3-inch HDPE conduit, armored single-mode fiber optic cable, and Type 3/Type 4 polymer concrete handholes along SE 14th Street from the Des Moines River to the Viaduct Bridge in Des Moines, Iowa. The contractor is responsible for providing all materials and labor to meet ICN and City of Des Moines standards, with all materials required to comply with the Build America, Buy America Act. The project scope includes installing five Type III handholes (36" × 24" × 30") and three Type IV handholes (48" × 30" × 36"), removing approximately 2,800 feet of old cables, and leaving pull rope and tracer wire in all conduits for future locating and maintenance. Sealed bids must be received by Sheri Stephens, ICN Contracting, no later than 12:00 PM on November 23, 2026, with bids required to include a breakdown of lump sum costs into labor and materials. Work may begin upon award and contract completion, with a completion date no later than March 31, 2027, though the ICN requests completion prior to winter frost conditions to avoid construction delays.
The SOW does not establish pricing terms, set-asides, or incumbent information. The project is federally funded through infrastructure programs requiring BABA compliance. The ICN will manage project oversight, secure Department of Transportation right-of-way permits, and coordinate splicing through its NOC OSP department, while the City of Des Moines is responsible for providing survey stakes and securing city permits. The contractor must secure all locates from Iowa One Call and locate private utilities as needed. Payment will not be issued until all work is completed per contract specifications and passes the ICN's punch list verification process, which includes a two-week initial review period, a two-week contractor correction period, and a one-week verification period. Key ICN points of contact include Chris Harris (Engineering/Design), Paul Damge (Materials), and Jason Akers (Splice Coordination, requiring minimum two weeks' notice).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-032 ITB OSP.docx | DOCX document | |
| Checklist.pdf | ||
| Typicals.pdf | ||
| Engineering Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Iowa Communications Network Statement of Work OSP Log #77244807, Link 2062E (36F) Polk County, SE 14th St from Des Moines River to Viaduct Bridge – Des Moines, IA
GPS coordinates: 41.581307 -93.596898
Project Overview:
OVERVIEW OF PROJECT
This is a City of Des Moines cable relocation project that will be managed by the ICN. The Contractor shall supply 3” HDPE conduit, armored single-mode OSP fiber optic cable, Type 3 / Type 4 polymer concrete handholes, and all material necessary to place per ICN and City of Des Moines standards (per 77244807 – ENGINEERING PLANS). The cable must be Build America, Buy America Act (BABA) compliant which requires that all iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects are produced in the United States.
Please see the CONSTRUCTION DRAWING(S). All work to be completed per the attached STANDARD INSTALLATION REQUIREMENTS and TYPICALS except where noted within this STATEMENT OF WORK (SOW). Upon notification of completion, the ICN will perform a review using the attached PUNCHLIST.
Any corrections will need to be made prior to ICN issuing payment for work completed.
NOTE: With approaching weather conditions expected to introduce frost in the ground, boring will become difficult or impossible. Therefore, the ICN requests that the cable relocation be performed as soon as reasonably possible to avoid encountering frost.
SPLICING EXCLUDED FROM THIS CONSTRUCTION BID / SPLICING SHALL BE COORDINATED WITH NOC OSP ICN Responsibilities:
1. Project Management
2. ICN will secure all necessary DOT ROW permit
3. Arrange splicing
City of Des Moines Responsibilities:
1. Provide Survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work. (Brett Lewis – City of Des Moines Engineer, 515-208-4024)
2. Secure City of Des Moines permit
Contractor Responsibilities:
1. Contractor Provided Materials per materials list:
2. Secure all necessary locates from “Iowa One Call”.
3. Locate all private utilities, as required or necessary.
Duct Installation:
1. Provide 3-IN HDPE, SDR 13.5 duct (See Engineering drawing)
2. It shall be the sole responsibility of the contractor to ensure that the fiber installation is in the public Right-of-Way
3. Ensure that a pull rope (Mule Tape) is left in all duct along with #10 or #12 Tracer Wire.
Handholes:
1. Expose and raise to grade existing handhole at the following locations per ICN Standard Practice/Typical Drawings:
2. Five (5) - Type III Handhole - (Length × Width × Depth): 36" × 24" × 30"
3. Three (3) - Type IV Handhole - (Length × Width × Depth): 48" × 30" × 36"
Fiber Installation:
1. See Engineering plans
2. Coil excess cable evenly in each handhole ensuring no less than 50-ft in each assist handholes and 100-ft in each splice location.
Fiber Removal:
1. Contractor to remove old cables from existing conduits once traffic is spliced over to new cables. Approximately 2800-Ft
Locate Facilities:
1. Station: All Conduits must have tracer wire installed for locating purposes.
NOTE: At the conclusion of the project, ensure that a pull rope is left in ALL pathways, both inside and outside, new and existing.
Contractor Provided Materials:
1. Contractor to supply all materials.
2. See Sheet N.17 on “77244807 - ENGINEERING PLANS”
Contractor shall supply all other materials required for proper installation, including but not limited to: HDPE, Grounding and Tracer Wires, Rock, Wire Mesh, etc.
ICN Point of Contact for this Project:
Engineering/Design:
Chris Harris 515-725-8925 office 515-380-3689 cell
Materials:
Paul Damge 515-725-4749 office 515-491-1429 cell
Splice Coordination: (typically a minimum of 2 weeks notification is required)
NOC OSP
Jason Akers 515-725-7423 Bid/Job Showing: N/A Work Start Date: Work may begin upon award of the bid and completion of the contract.
Completion Date: Not later than 3/31/2027, Due to tight ROW and other utilities relocation we would request the new HDPE work is completed prior to frost/winter (extension may be negotiated based upon weather and/or unforeseen construction problems in the ROW).
Only written modifications to this Scope of Work are binding - Verbal changes to this scope of work by any person or persons are not binding, unless confirmed in writing.
BIDS:
1. Bids must be received sealed by Sheri Stephens, ICN Contracting, NLT 12PM on November 23rd 2026.
2. Contractors must submit a bid for Construction Bid as outlined in the SOW and per the Engineering drawings. ICN requires a breakdown of lump sum bids into labor and materials.
BIDS may be delivered to:
Sheri Stephens ICN Contracting Grimes State Office Building 400 East 14th Street Des Moines, IA 50319 E-Mail: sheri.stephens@iowa.gov
Completion of Work:
1. Upon notification of construction completion, ICN will have 2 weeks to complete the Punch List.
2. Upon initial completion of Punch List, the Contractor will have 2 weeks to correct any issues identified on the Punch List.
3. Upon notification of corrections, the ICN will have 1 week to verify corrections were completed to the ICN’s satisfaction.
4. No payment will be made until all work is completed per the contract unless agreed upon by both parties.
Attachments: The following are included by reference and as provided within Bid Documents.
77244807 - STATEMENT OF WORK, this document 77244807 - ENGINEERING PLANS (includes Materials list)
77244807 - TYPICALS
77244807 - PUNCH LIST