Engineering Plans.pdf

PDF 3 MB Posted

Attached to
ICN OSP Project # 77244807, Polk Co
Solicitation number
26-032
Issued by
Polk County, Iowa

About this file

This Engineering Plans document outlines a fiber optic cable relocation project for the City of Des Moines, managed by the ICN in Polk County, Iowa. The project involves the installation and relocation of fiber optic infrastructure along SE 14th Street and Maury Street, including the installation of multiple handholes (HH 1F through HH 8F) and approximately 3,350 linear feet of 3-inch diameter PVC conduit. The work includes pulling back and reinstalling existing MetroNet and T&T fiber cables, installing new 96 SM MetroNet fiber, 48 SM T&T fiber, and 72 SM DSM IT fiber across various routes. The project specifications detail critical crossings where conduit installation depths range from 5 to 8 feet minimum, and the plans contain six sheets of engineering drawings with specific installation requirements, notes, and wire tabulations. Wire requirements total 3,870 linear feet of pull rope, 905 linear feet of #10 tracer rope, 3,505 linear feet of 12 SM fiber optic cable, 905 linear feet of 48 SM fiber optic cable, and 2,965 linear feet of 96 SM fiber optic cable.

The contractor is required to coordinate with the City of Des Moines Engineering Department (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work. Existing fiber must be maintained and protected until new fiber splicing is completed by others, with specific provisions for coiling slack fiber at designated handholes. The project includes interconnect traffic signals and provisions for future cabinet installations. The tabulation sheets provide detailed conduit specifications by diameter and location, footing requirements for eight handholes, and comprehensive wire specifications with adjusted lengths accounting for slack and pull rope requirements.

View the file

Other files

File Type Posted
26-032 ITB OSP.docx DOCX document
SOW.docx DOCX document
Checklist.pdf PDF
Typicals.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

W H

U

W V

W V

W V

G V

S I G

N

G V

S I G

N

7F

SE 14TH STREET

H A

R R

IE

T

S T

R E

E T

USERNAMESYSTEMTIME DGNSPEC

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

SYSTEMDATE

ENGLISHFILE NO. 06-2022-019

ct 1

City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.11

1. EXISTING CONDUIT TO BE RING CUT PRIOR TO SPLICE NIGHT. CABLES TO

BE PULLED BACK AND RE-ROUTED INTO NEW 3" HDPE TOWARDS HH 7F.

WILL NEED CONTRACTOR TO DUCT SPLICE 3" TO 2" AFTER SPLICE.

2. EXISTING METRONET HANDHOLE/SPLICE: CUT CABLES THE NIGHT OF THE

SPLICE AND PULL BACK FOR SPLICE TAILS (36 SM MNET, 12 SM T&T).

3. INSTALL 96 SM FIBER OPTIC CABLE INTO PROPOSED TYPE 3 HANDHOLE 7F

FROM BRIDGE BARRIER RAIL. FROM BRIDGE BARRIER RAIL TO HANDHOLE 7F

INSTALL CONDUIT CONNECTION.

4. NEW FIBER (96 SM MNET) SHALL BE CONTINUOUS FROM HANDHOLE 7F TO

HANDHOLE 1F (ON SHEET N.14).NEW FIBER (48 SM T&T) SHALL BE

CONTINUOUS FROM HANDHOLE 7F TO HANDHOLE 1F (ON SHEET N.13).

NOTES

(SHEET 1 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

O

FEET

2O

(SEE NOTE 4)

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 7F TO HH 6F

PROPOSED 3" CONDUIT (930')

(SEE NOTE 3)

HH 7F

PROPOSED TYPE 3

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

FROM EX 2" HDPE CONDUIT TO HH 7F

PROPOSED 3" CONDUIT (60')

SEE NOTE 1

EX: 12 SM (T&T)

EX: 36 SM (MNET)

EXISTING 2" HDPE CONDUIT AND CABLES:

SEE NOTE 2

FOR INFORMATION ONLY

P la n F ile N o.

: 6

-4

Typical Installation Depth: 3'-4'

Approximate locations of proposed storm sewer structures.

Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

W H

U

S I G

N

W V

S I G

N

S I G

N

S I G

N

S I G

N

S B

S

BS

B

S B

S B

W H

U

S I G

N

S B

S I G

N

S B

S I G

N

S I G

N

S I G

N

S B

B B

S B

B B

S B

S B

S I G

N

S B

S B

S I G

N

S I G

N

W H

U

W H

U

6F

SE 14TH STREET

E R

A

IL

R O

A D

A V

E N

U E

E

R

A

IL

R O

A D

A

V E

N U

E

SE 1

2TH S

TREET

USERNAMESYSTEMTIME DGNSPEC

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

SYSTEMDATE

ENGLISHFILE NO. 06-2022-019

ct 2

City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.12

(SHEET 2 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

O

FEET

2O

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 6F TO HH 5F

PROPOSED 3" CONDUIT (595')

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 7F TO HH 6F

PROPOSED 3" CONDUIT (930')

HH 6F

PROPOSED TYPE 3

FOR INFORMATION ONLY

P la n F ile N o.

: 6

Install to 7' Depth Between Sta 93+00 and 94+50

Install to 5' depth under intersection.

Approximate location of proposed storm sewer structure.

Approximate locations of proposed storm sewer structures.

Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

Critical Crossing 1:

Bottom of Subdrain Pipe: ~4.0' Below Existing Ground Conduit Depth: 7.0' Minimum

305+00POB 305+00.00 305+00

306+00

307+00

W H

U

S I G

N

W H

U

W H

U

G V

W V

W H

U

W V

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

S I G

N

S B

S B

W H

U

S B

S B

S B

S I G

N

S B

W H

U

B B

S B

B B

S B

T C

B

T C

B T C

B

S B

T C

B

S B

S B

S B

S I G

N

S B

S B

S B

S B

S I G

N

S B

S I G

N

S B

S B

S

BS

B

S B

S B

S B

S B

S B

S B

W H

U

W H

U

3F

4F

SE 14TH STREET

M A

U R

Y S

T R

E E

T

5F

USERNAMESYSTEMTIME DGNSPEC

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

SYSTEMDATE

ENGLISHFILE NO. 06-2022-019

ct 3

City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.13

(SHEET 3 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

1. PULL EXISTING FIBER BACK TO HH E5. REINSTALL FIBER IN NEW 3" CONDUIT.

COIL ALL EXISTING EXTRA FIBER IN HH 3F.

2. SET NEW TYPE 4 HANDHOLE (HH 4F) OVER EXISTING CITY 3" CONDUIT.

MAINTAIN EXISTING FIBER TO EXISTING HANDHOLE E6 AND EXISTING CABINET

UNTIL NEW FIBER SPLICING IS COMPLETE.

3. NEW FIBER (72 SM DSM IT AND 12 SM T&T) SHALL BE CONTINUOUS FROM

HH 3F THROUGH HH 4F TO EXISTING HH E6 (AT SE 15TH STREET).

4. NEW FIBER (96 SM MNET) SHALL BE CONTINUOUS FROM HH 7F (ON SHEET N.11)

TO HH 1F (ON SHEET N.14). NEW FIBER (48 SM T&T) SHALL BE CONTINUOUS

FROM HH 4F THROUGH HH 3F TO HH 1F (SHEET N.14).

5. COIL 200 FEET OF SLACK OF THE 96 SM MNET IN HH 3F.

NOTES

O

FEET

2O

(SEE NOTE 4)

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 3F TO HH 2F

PROPOSED 3" CONDUIT (340')

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 6F TO HH 5F

PROPOSED 3" CONDUIT (595')

(SEE NOTE 5)

HH 3F

PROPOSED TYPE 4

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 5F TO HH 3F

100' OF 3" CONDUIT

(SEE SHEET N.16)

EX CONDUIT

(SEE NOTE 2)

HH 4F

PROPOSED TYPE 4

PROPOSED FUTURE CABINET

HH 5F

PROPOSED TYPE 3

(SEE NOTE 1)

INSTALL: 1-TR/PR

REMOVE & REINSTALL: 1-12 SM EXISTING (T&T)

REMOVE & REINSTALL: 1-48 SM EXISTING (MNET)

HH 5F TO HH 3F

205' OF 3" CONDUIT

(SEE NOTE 3)

INSTALL: 1-TR/PR

INSTALL: 1-12 SM (T&T)

INSTALL: 2-48 SM (T&T)

INSTALL: 1-72 SM (DSM IT)

HH 3F TO HH 4F

165' OF 3" CONDUIT

FOR INFORMATION ONLY

P la n F ile N o.

: 6

Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

Typical Installation Depth: 3'-4'

Approximate locations of proposed storm sewer structures.

Typical Installation Depth: 3'-4'

Critical Crossing 2:

Bottom of Prop. Storm Pipe: ~5.2' Below Existing Ground

Conduit Depth: 7.0' Minimum

Approximate locations of proposed storm sewer structures.

Critical Crossing 3:

Bottom of Prop. Storm Pipe: ~4.0' Below Existing Ground Conduit Depth: 7.0' Minimum

Critical Crossing 4:

Bottom of Prop. Storm Pipe: ~5.5' Below Existing Ground

Conduit Depth: 8.0' Minimum

Traffic Signal Structures

Traffic Signal Structure

Traffic Signal Structures

S B

S B

S B

S B

S B S B

S B

S B

S I G

N

S B

S I G

N

B B

S B

B B

S B

S B

S B

S I G

N

1F

2F

SE 14TH STREET

SE 14TH STREET

S H

A W

S T

R E

E T

USERNAMESYSTEMTIME DGNSPEC

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

SYSTEMDATE

ENGLISHFILE NO. 06-2022-019

ct 4

City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.14

1. EXISTING METRONET MANHOLE AND SPLICE: CUT CABLES THE NIGHT OF

THE SPLICE AND PULL BACK FOR SPLICE TAILS. 66' OF EXISTING SLACK.

NOTES

(SHEET 4 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

O

FEET

2O

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 2F TO HH 1F

PROPOSED 3" CONDUIT (380')

INSTALL: 1-TR/PR

INSTALL: 1-48 SM (T&T)

INSTALL: 1-96 SM (MNET)

HH 3F TO HH 2F

PROPOSED 3" CONDUIT (340')

SET OVER EXISTING 3" HDPE

PROPOSED TYPE 3 HH 1F

HH 2F

PROPOSED TYPE 4

PROPOSED FUTURE CABINET EX: 48 SM (T&T)

EX: 48 SM (MNET)

EXISTING 3" HDPE CONDUIT AND CABLES

SEE NOTE 1

SM EXISTING (T&T)

SM EXISTING (MNET)

FOR INFORMATION ONLY

P la n F ile N o.

: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

Approximate location of proposed storm sewer structure.

Install to 5' Minimum Depth Under Proposed Intersection Pavement.

WHU

WV

GV

WV

WV

WV

WV

SIGN

SIGN

WV

SL

SIGN

SBSB

SB

SB

SB

SB

TP

TP

SB

SB

SB

SB

SB

WHU

SIGN

WHU

GV

SIGN

SIGN

SIGN

BB BB

SIGN

WHU

100+00

3F

8F

E5

E4

MAURY STREET

S E

T H

S

T R

E E

T

S E

T H

S

T R

E E

T wade.zahurones12:23:43 PM \\hrgreen.com\hrg\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N05_220519_SPS.dgn

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

10/30/2026

ENGLISHFILE NO. 06-2022-019 N.15

1. REPLACE EXISTING HANDHOLE WITH NEW TYPE 3 HANDHOLE (HH 8F).

INSTALL HH 8F OVER EXISTING CITY 3" CONDUIT.

2. REMOVE EXISTING FIBER FROM EXISTING HH E5 (AT SE 12TH STREET)

TO EXISTING HH E4 (AT SE 14TH STREET). REINSTALL EXISTING

FIBER FROM HH E5 (AT SE 12TH) THROUGH HH 8F TO HH 3F.

NOTES

(SHEET 5 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

O

FEET

2O

(SEE NOTE 2)

INSTALL: 1-TR/PR

REINSTALL: 1-12 SM EX (T&T)

REINSTALL: 1-48 SM EX (MNET)

205' OF 3" CONDUIT

(SEE NOTE 2)

PULL BACK TO HH 8F: 1-12 SM EX (T&T)

PULL BACK TO HH 8F: 1-48 SM EX (MNET)

EXISTING CONDUIT

EXISTING HANDHOLE E4

EXISTING HANDHOLE E5

(SEE NOTE 1)

PROPOSED TYPE 3 HH 8F

FOR INFORMATION ONLY

DESIGN TEAM PROJECT NUMBERCOUNTYENGLISHFILE NO. City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77P la n F ile N o.

: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

Approximate locations of proposed storm sewer structures.

Critical Crossing 2:

Bottom of Prop. Storm Pipe: ~5.2' Below Existing Ground

Conduit Depth: 7.0' Minimum

Critical Crossing 3:

Bottom of Prop. Storm Pipe: ~4.0' Below Existing Ground

Conduit Depth: 7.0' Minimum

Approximate locations of proposed storm sewer structures.

WV

SIGNEB

SIGN

SIGN

WHU

SIGN

SIGN

SIGN

SIGN

SB

EB

SB

SB

SB

SB

WHU

WHU

WV

WV

MAURY STREET

E6

S E

T

H C

O U

R T

S E

T H

S T

R E

E T wade.zahurones12:23:50 PM \\hrgreen.com\hrg\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N05_220519_SPS.dgn

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

10/30/2026

ENGLISHFILE NO. 06-2022-019 City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.16

1. NEW FIBER (72 SM DSM IT AND 12 SM T&T) INSTALLED SHALL BE

CONTINUOUS FROM HANDHOLE E6 THROUGH HH 4F TO HH 3F.

EXISTING FIBER SHALL NOT BE REMOVED UNTIL SPLICING (BY OTHERS)

AT HH E6 AND HH 3F IS COMPLETED.

2. PULL BACK EXISTING FIBER (48 SM T&T) FROM EXISTING FIBER HANDHOLE

NEAR EXISTING TRAFFIC SIGNAL CABINET (AT SE 14TH STREET TO

EXISTING HH E6 (AT SE 15TH ST). REINSTALL EXISTING FIBER (48SM T&T)

FROM HH E6 TO HH 4F (ON SHEET N.13). COIL 100 FEET OF SLACK IN

HH E6; COIL REMAINING FIBER IN HH 4F.

NOTES

(SHEET 6 OF 6)

INTERCONNECT

TRAFFIC SIGNAL

O

FEET

2O

(SEE NOTE 2)

REINSTALL: 1-48 SM (T&T)

PULL BACK: 1-48 SM (T&T)

(SEE NOTE 1)

REMOVE: 1-12 SM

REMOVE: 1-24 SM

REMOVE: 1-48 SM

INSTALL: 1-TR/PR

INSTALL: 1-12 SM (T&T)

INSTALL: 1-72 SM (DSM IT)

HH 4F TO HH E6

EXISTING CONDUIT (620')

HH E6

EXISTING TYPE 4

(SEE SHEET N.13)

TYPE 4 HH 4F

CONNECT TO PROPOSED

FOR INFORMATION ONLY

P la n F ile N o.

: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.

TABULATIONS

INTERCONNECT

TRAFFIC SIGNAL

CONDUIT TABULATION - FIBER OPTIC RELOCATION

SE 14th Street & Maury Street

Trenched Pushed

(Feet) (Feet)

1" Dia.2" Dia.3" Dia.4" Dia.2" Dia.3" Dia.4" Dia.

From To PVC PVC PVC PVC PVC PVC PVC

Handhole 1F Handhole 2F 380

Handhole 2F Handhole 3F 340

Handhole 3F Handhole 4F 165

Handhole 4F Handhole E6 620

Handhole 3F Handhole 5F 100

Handhole 5F Handhole 6F 595

Handhole 6F Handhole 7F 930

Handhole 7F Existing Conduit 60

Totals = 0 0 0 0 0 3190 0

Extra = 0 0 0 0 0 160 0

Grand Totals = 0 0 0 0 0 3350 0

FOOTING AND HANDHOLE TABULATION - FIBER OPTIC RELOCATION

SE 14th Street & Maury Street

Hand- Hand- Hand-

Signal Pedestal Push Button Hole Hole Hole

Pole Pole Pole Type I Type III Type IV

NUMBER Footing Footing Footing 24" Dia. Comments

Handhole 1F 1 Fiber - See Details

Handhole 2F 1 Fiber - See Details

Handhole 3F 1 Fiber - See Details

Handhole 4F 1 Fiber - See Details

Handhole 5F 1 Fiber - See Details

Handhole 6F 1 Fiber - See Details

Handhole 7F 1 Fiber - See Details

Handhole 8F 1 Fiber - See Details

Totals = 0 0 0 0 5 3

WIRE TABULATION (IN FEET) - FIBER OPTIC RELOCATION

SE 14th Street & Maury Street

Plan Adj. Pull 1c #10 12 SM Fiber 48 SM Fiber 72 SM Fiber 96 SM Fiber

From To Length Length Rope Tracer Optic Cable Optic Cable Optic Cable Optic Cable

Handhole 1F Handhole 2F 380 490 490 490 490 490

Handhole 2F Handhole 3F 340 450 450 450 450 450

Handhole 3F Handhole 4F 165 275 275 275 275 550 275

Handhole 4F Handhole E6 620 630 630 630 630 630

Handhole 3F Handhole 5F 100 210 210 210 210 210

Handhole 5F Handhole 6F 595 705 705 705 705 705

Handhole 6F Handhole 7F 930 1040 1040 1040 1040 1040

Handhole 7F Existing Conduit 60 70 70 70 60 70

Totals = 3870 3870 905 3505 905 2965

NOTES:

Plan Length: Center to Center length between objects.

Adjusted Length: Plan length with additional slack length.

wade.zahurones12:23:55 PM \\hrgreen.com\HRG\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N02_220519_SPS.dgn

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY

10/30/2026

ENGLISHFILE NO. City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.17P la n F ile N o.

: 6

-4

06-2022-019

Handhold 8F Handhold 3F 205

2,775

2,875

File details come from the government source that posted it. Updated .