Engineering Plans.pdf
PDF 3 MB Posted
- Attached to
- ICN OSP Project # 77244807, Polk Co
- Solicitation number
- 26-032
- Issued by
- Polk County, Iowa
About this file
This Engineering Plans document outlines a fiber optic cable relocation project for the City of Des Moines, managed by the ICN in Polk County, Iowa. The project involves the installation and relocation of fiber optic infrastructure along SE 14th Street and Maury Street, including the installation of multiple handholes (HH 1F through HH 8F) and approximately 3,350 linear feet of 3-inch diameter PVC conduit. The work includes pulling back and reinstalling existing MetroNet and T&T fiber cables, installing new 96 SM MetroNet fiber, 48 SM T&T fiber, and 72 SM DSM IT fiber across various routes. The project specifications detail critical crossings where conduit installation depths range from 5 to 8 feet minimum, and the plans contain six sheets of engineering drawings with specific installation requirements, notes, and wire tabulations. Wire requirements total 3,870 linear feet of pull rope, 905 linear feet of #10 tracer rope, 3,505 linear feet of 12 SM fiber optic cable, 905 linear feet of 48 SM fiber optic cable, and 2,965 linear feet of 96 SM fiber optic cable.
The contractor is required to coordinate with the City of Des Moines Engineering Department (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work. Existing fiber must be maintained and protected until new fiber splicing is completed by others, with specific provisions for coiling slack fiber at designated handholes. The project includes interconnect traffic signals and provisions for future cabinet installations. The tabulation sheets provide detailed conduit specifications by diameter and location, footing requirements for eight handholes, and comprehensive wire specifications with adjusted lengths accounting for slack and pull rope requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-032 ITB OSP.docx | DOCX document | |
| SOW.docx | DOCX document | |
| Checklist.pdf | ||
| Typicals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
W H
U
W V
W V
W V
G V
S I G
N
G V
S I G
N
7F
SE 14TH STREET
H A
R R
IE
T
S T
R E
E T
USERNAMESYSTEMTIME DGNSPEC
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
SYSTEMDATE
ENGLISHFILE NO. 06-2022-019
ct 1
City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.11
1. EXISTING CONDUIT TO BE RING CUT PRIOR TO SPLICE NIGHT. CABLES TO
BE PULLED BACK AND RE-ROUTED INTO NEW 3" HDPE TOWARDS HH 7F.
WILL NEED CONTRACTOR TO DUCT SPLICE 3" TO 2" AFTER SPLICE.
2. EXISTING METRONET HANDHOLE/SPLICE: CUT CABLES THE NIGHT OF THE
SPLICE AND PULL BACK FOR SPLICE TAILS (36 SM MNET, 12 SM T&T).
3. INSTALL 96 SM FIBER OPTIC CABLE INTO PROPOSED TYPE 3 HANDHOLE 7F
FROM BRIDGE BARRIER RAIL. FROM BRIDGE BARRIER RAIL TO HANDHOLE 7F
INSTALL CONDUIT CONNECTION.
4. NEW FIBER (96 SM MNET) SHALL BE CONTINUOUS FROM HANDHOLE 7F TO
HANDHOLE 1F (ON SHEET N.14).NEW FIBER (48 SM T&T) SHALL BE
CONTINUOUS FROM HANDHOLE 7F TO HANDHOLE 1F (ON SHEET N.13).
NOTES
(SHEET 1 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
O
FEET
2O
(SEE NOTE 4)
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 7F TO HH 6F
PROPOSED 3" CONDUIT (930')
(SEE NOTE 3)
HH 7F
PROPOSED TYPE 3
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
FROM EX 2" HDPE CONDUIT TO HH 7F
PROPOSED 3" CONDUIT (60')
SEE NOTE 1
EX: 12 SM (T&T)
EX: 36 SM (MNET)
EXISTING 2" HDPE CONDUIT AND CABLES:
SEE NOTE 2
FOR INFORMATION ONLY
P la n F ile N o.
: 6
-4
Typical Installation Depth: 3'-4'
Approximate locations of proposed storm sewer structures.
Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
W H
U
S I G
N
W V
S I G
N
S I G
N
S I G
N
S I G
N
S B
S
BS
B
S B
S B
W H
U
S I G
N
S B
S I G
N
S B
S I G
N
S I G
N
S I G
N
S B
B B
S B
B B
S B
S B
S I G
N
S B
S B
S I G
N
S I G
N
W H
U
W H
U
6F
SE 14TH STREET
E R
A
IL
R O
A D
A V
E N
U E
E
R
A
IL
R O
A D
A
V E
N U
E
SE 1
2TH S
TREET
USERNAMESYSTEMTIME DGNSPEC
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
SYSTEMDATE
ENGLISHFILE NO. 06-2022-019
ct 2
City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.12
(SHEET 2 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
O
FEET
2O
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 6F TO HH 5F
PROPOSED 3" CONDUIT (595')
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 7F TO HH 6F
PROPOSED 3" CONDUIT (930')
HH 6F
PROPOSED TYPE 3
FOR INFORMATION ONLY
P la n F ile N o.
: 6
Install to 7' Depth Between Sta 93+00 and 94+50
Install to 5' depth under intersection.
Approximate location of proposed storm sewer structure.
Approximate locations of proposed storm sewer structures.
Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
Critical Crossing 1:
Bottom of Subdrain Pipe: ~4.0' Below Existing Ground Conduit Depth: 7.0' Minimum
305+00POB 305+00.00 305+00
306+00
307+00
W H
U
S I G
N
W H
U
W H
U
G V
W V
W H
U
W V
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
S I G
N
S B
S B
W H
U
S B
S B
S B
S I G
N
S B
W H
U
B B
S B
B B
S B
T C
B
T C
B T C
B
S B
T C
B
S B
S B
S B
S I G
N
S B
S B
S B
S B
S I G
N
S B
S I G
N
S B
S B
S
BS
B
S B
S B
S B
S B
S B
S B
W H
U
W H
U
3F
4F
SE 14TH STREET
M A
U R
Y S
T R
E E
T
5F
USERNAMESYSTEMTIME DGNSPEC
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
SYSTEMDATE
ENGLISHFILE NO. 06-2022-019
ct 3
City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.13
(SHEET 3 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
1. PULL EXISTING FIBER BACK TO HH E5. REINSTALL FIBER IN NEW 3" CONDUIT.
COIL ALL EXISTING EXTRA FIBER IN HH 3F.
2. SET NEW TYPE 4 HANDHOLE (HH 4F) OVER EXISTING CITY 3" CONDUIT.
MAINTAIN EXISTING FIBER TO EXISTING HANDHOLE E6 AND EXISTING CABINET
UNTIL NEW FIBER SPLICING IS COMPLETE.
3. NEW FIBER (72 SM DSM IT AND 12 SM T&T) SHALL BE CONTINUOUS FROM
HH 3F THROUGH HH 4F TO EXISTING HH E6 (AT SE 15TH STREET).
4. NEW FIBER (96 SM MNET) SHALL BE CONTINUOUS FROM HH 7F (ON SHEET N.11)
TO HH 1F (ON SHEET N.14). NEW FIBER (48 SM T&T) SHALL BE CONTINUOUS
FROM HH 4F THROUGH HH 3F TO HH 1F (SHEET N.14).
5. COIL 200 FEET OF SLACK OF THE 96 SM MNET IN HH 3F.
NOTES
O
FEET
2O
(SEE NOTE 4)
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 3F TO HH 2F
PROPOSED 3" CONDUIT (340')
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 6F TO HH 5F
PROPOSED 3" CONDUIT (595')
(SEE NOTE 5)
HH 3F
PROPOSED TYPE 4
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 5F TO HH 3F
100' OF 3" CONDUIT
(SEE SHEET N.16)
EX CONDUIT
(SEE NOTE 2)
HH 4F
PROPOSED TYPE 4
PROPOSED FUTURE CABINET
HH 5F
PROPOSED TYPE 3
(SEE NOTE 1)
INSTALL: 1-TR/PR
REMOVE & REINSTALL: 1-12 SM EXISTING (T&T)
REMOVE & REINSTALL: 1-48 SM EXISTING (MNET)
HH 5F TO HH 3F
205' OF 3" CONDUIT
(SEE NOTE 3)
INSTALL: 1-TR/PR
INSTALL: 1-12 SM (T&T)
INSTALL: 2-48 SM (T&T)
INSTALL: 1-72 SM (DSM IT)
HH 3F TO HH 4F
165' OF 3" CONDUIT
FOR INFORMATION ONLY
P la n F ile N o.
: 6
Contractor shall contact City of Des Moines Engineering Dept. (Brett Lewis, 515-208-4024) to request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
Typical Installation Depth: 3'-4'
Approximate locations of proposed storm sewer structures.
Typical Installation Depth: 3'-4'
Critical Crossing 2:
Bottom of Prop. Storm Pipe: ~5.2' Below Existing Ground
Conduit Depth: 7.0' Minimum
Approximate locations of proposed storm sewer structures.
Critical Crossing 3:
Bottom of Prop. Storm Pipe: ~4.0' Below Existing Ground Conduit Depth: 7.0' Minimum
Critical Crossing 4:
Bottom of Prop. Storm Pipe: ~5.5' Below Existing Ground
Conduit Depth: 8.0' Minimum
Traffic Signal Structures
Traffic Signal Structure
Traffic Signal Structures
S B
S B
S B
S B
S B S B
S B
S B
S I G
N
S B
S I G
N
B B
S B
B B
S B
S B
S B
S I G
N
1F
2F
SE 14TH STREET
SE 14TH STREET
S H
A W
S T
R E
E T
USERNAMESYSTEMTIME DGNSPEC
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
SYSTEMDATE
ENGLISHFILE NO. 06-2022-019
ct 4
City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.14
1. EXISTING METRONET MANHOLE AND SPLICE: CUT CABLES THE NIGHT OF
THE SPLICE AND PULL BACK FOR SPLICE TAILS. 66' OF EXISTING SLACK.
NOTES
(SHEET 4 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
O
FEET
2O
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 2F TO HH 1F
PROPOSED 3" CONDUIT (380')
INSTALL: 1-TR/PR
INSTALL: 1-48 SM (T&T)
INSTALL: 1-96 SM (MNET)
HH 3F TO HH 2F
PROPOSED 3" CONDUIT (340')
SET OVER EXISTING 3" HDPE
PROPOSED TYPE 3 HH 1F
HH 2F
PROPOSED TYPE 4
PROPOSED FUTURE CABINET EX: 48 SM (T&T)
EX: 48 SM (MNET)
EXISTING 3" HDPE CONDUIT AND CABLES
SEE NOTE 1
SM EXISTING (T&T)
SM EXISTING (MNET)
FOR INFORMATION ONLY
P la n F ile N o.
: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
Approximate location of proposed storm sewer structure.
Install to 5' Minimum Depth Under Proposed Intersection Pavement.
WHU
WV
GV
WV
WV
WV
WV
SIGN
SIGN
WV
SL
SIGN
SBSB
SB
SB
SB
SB
TP
TP
SB
SB
SB
SB
SB
WHU
SIGN
WHU
GV
SIGN
SIGN
SIGN
BB BB
SIGN
WHU
100+00
3F
8F
E5
E4
MAURY STREET
S E
T H
S
T R
E E
T
S E
T H
S
T R
E E
T wade.zahurones12:23:43 PM \\hrgreen.com\hrg\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N05_220519_SPS.dgn
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
10/30/2026
ENGLISHFILE NO. 06-2022-019 N.15
1. REPLACE EXISTING HANDHOLE WITH NEW TYPE 3 HANDHOLE (HH 8F).
INSTALL HH 8F OVER EXISTING CITY 3" CONDUIT.
2. REMOVE EXISTING FIBER FROM EXISTING HH E5 (AT SE 12TH STREET)
TO EXISTING HH E4 (AT SE 14TH STREET). REINSTALL EXISTING
FIBER FROM HH E5 (AT SE 12TH) THROUGH HH 8F TO HH 3F.
NOTES
(SHEET 5 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
O
FEET
2O
(SEE NOTE 2)
INSTALL: 1-TR/PR
REINSTALL: 1-12 SM EX (T&T)
REINSTALL: 1-48 SM EX (MNET)
205' OF 3" CONDUIT
(SEE NOTE 2)
PULL BACK TO HH 8F: 1-12 SM EX (T&T)
PULL BACK TO HH 8F: 1-48 SM EX (MNET)
EXISTING CONDUIT
EXISTING HANDHOLE E4
EXISTING HANDHOLE E5
(SEE NOTE 1)
PROPOSED TYPE 3 HH 8F
FOR INFORMATION ONLY
DESIGN TEAM PROJECT NUMBERCOUNTYENGLISHFILE NO. City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77P la n F ile N o.
: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
Approximate locations of proposed storm sewer structures.
Critical Crossing 2:
Bottom of Prop. Storm Pipe: ~5.2' Below Existing Ground
Conduit Depth: 7.0' Minimum
Critical Crossing 3:
Bottom of Prop. Storm Pipe: ~4.0' Below Existing Ground
Conduit Depth: 7.0' Minimum
Approximate locations of proposed storm sewer structures.
WV
SIGNEB
SIGN
SIGN
WHU
SIGN
SIGN
SIGN
SIGN
SB
EB
SB
SB
SB
SB
WHU
WHU
WV
WV
MAURY STREET
E6
S E
T
H C
O U
R T
S E
T H
S T
R E
E T wade.zahurones12:23:50 PM \\hrgreen.com\hrg\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N05_220519_SPS.dgn
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
10/30/2026
ENGLISHFILE NO. 06-2022-019 City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.16
1. NEW FIBER (72 SM DSM IT AND 12 SM T&T) INSTALLED SHALL BE
CONTINUOUS FROM HANDHOLE E6 THROUGH HH 4F TO HH 3F.
EXISTING FIBER SHALL NOT BE REMOVED UNTIL SPLICING (BY OTHERS)
AT HH E6 AND HH 3F IS COMPLETED.
2. PULL BACK EXISTING FIBER (48 SM T&T) FROM EXISTING FIBER HANDHOLE
NEAR EXISTING TRAFFIC SIGNAL CABINET (AT SE 14TH STREET TO
EXISTING HH E6 (AT SE 15TH ST). REINSTALL EXISTING FIBER (48SM T&T)
FROM HH E6 TO HH 4F (ON SHEET N.13). COIL 100 FEET OF SLACK IN
HH E6; COIL REMAINING FIBER IN HH 4F.
NOTES
(SHEET 6 OF 6)
INTERCONNECT
TRAFFIC SIGNAL
O
FEET
2O
(SEE NOTE 2)
REINSTALL: 1-48 SM (T&T)
PULL BACK: 1-48 SM (T&T)
(SEE NOTE 1)
REMOVE: 1-12 SM
REMOVE: 1-24 SM
REMOVE: 1-48 SM
INSTALL: 1-TR/PR
INSTALL: 1-12 SM (T&T)
INSTALL: 1-72 SM (DSM IT)
HH 4F TO HH E6
EXISTING CONDUIT (620')
HH E6
EXISTING TYPE 4
(SEE SHEET N.13)
TYPE 4 HH 4F
CONNECT TO PROPOSED
FOR INFORMATION ONLY
P la n F ile N o.
: 6 request survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work.
TABULATIONS
INTERCONNECT
TRAFFIC SIGNAL
CONDUIT TABULATION - FIBER OPTIC RELOCATION
SE 14th Street & Maury Street
Trenched Pushed
(Feet) (Feet)
1" Dia.2" Dia.3" Dia.4" Dia.2" Dia.3" Dia.4" Dia.
From To PVC PVC PVC PVC PVC PVC PVC
Handhole 1F Handhole 2F 380
Handhole 2F Handhole 3F 340
Handhole 3F Handhole 4F 165
Handhole 4F Handhole E6 620
Handhole 3F Handhole 5F 100
Handhole 5F Handhole 6F 595
Handhole 6F Handhole 7F 930
Handhole 7F Existing Conduit 60
Totals = 0 0 0 0 0 3190 0
Extra = 0 0 0 0 0 160 0
Grand Totals = 0 0 0 0 0 3350 0
FOOTING AND HANDHOLE TABULATION - FIBER OPTIC RELOCATION
SE 14th Street & Maury Street
Hand- Hand- Hand-
Signal Pedestal Push Button Hole Hole Hole
Pole Pole Pole Type I Type III Type IV
NUMBER Footing Footing Footing 24" Dia. Comments
Handhole 1F 1 Fiber - See Details
Handhole 2F 1 Fiber - See Details
Handhole 3F 1 Fiber - See Details
Handhole 4F 1 Fiber - See Details
Handhole 5F 1 Fiber - See Details
Handhole 6F 1 Fiber - See Details
Handhole 7F 1 Fiber - See Details
Handhole 8F 1 Fiber - See Details
Totals = 0 0 0 0 5 3
WIRE TABULATION (IN FEET) - FIBER OPTIC RELOCATION
SE 14th Street & Maury Street
Plan Adj. Pull 1c #10 12 SM Fiber 48 SM Fiber 72 SM Fiber 96 SM Fiber
From To Length Length Rope Tracer Optic Cable Optic Cable Optic Cable Optic Cable
Handhole 1F Handhole 2F 380 490 490 490 490 490
Handhole 2F Handhole 3F 340 450 450 450 450 450
Handhole 3F Handhole 4F 165 275 275 275 275 550 275
Handhole 4F Handhole E6 620 630 630 630 630 630
Handhole 3F Handhole 5F 100 210 210 210 210 210
Handhole 5F Handhole 6F 595 705 705 705 705 705
Handhole 6F Handhole 7F 930 1040 1040 1040 1040 1040
Handhole 7F Existing Conduit 60 70 70 70 60 70
Totals = 3870 3870 905 3505 905 2965
NOTES:
Plan Length: Center to Center length between objects.
Adjusted Length: Plan length with additional slack length.
wade.zahurones12:23:55 PM \\hrgreen.com\HRG\Data\2022\220519\CAD\Design\CADD_Files\Sheet_Files\SHT_N02_220519_SPS.dgn
DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY
10/30/2026
ENGLISHFILE NO. City of Des Moines \ HR Green, Inc. POLK NHSX-069-4(110)--3H-77 N.17P la n F ile N o.
: 6
-4
06-2022-019
Handhold 8F Handhold 3F 205
2,775
2,875
File details come from the government source that posted it. Updated .