Griffin Golf Course Bridge Replacements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-72650-NONST-2024-000000004
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
- 72141107 Bridge construction and repair service
- 72141205 Drainage system construction service
- 72141206 Dredging service
- 95121601 Steel bridge
- 95121627 Footbridge
- 95121626 Railway bridge
- 95121638 Pedestrian overpass
- 95121639 Pipeline carrying bridge
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Griffin, Georgia is procuring the Griffin Golf Course Bridge Replacements project, Bid #24-007. The project involves the demolition of two existing single-span concrete bridges and the replacement with Contech aluminum bottomless box culverts, including related concrete work, asphalt replacement, and storm drainage improvements. Key deliverables include new box culvert foundations, aluminum wingwalls, concrete slab and barrier walls, as well as site preparation, earthwork, and erosion control measures. The project has a substantial completion timeline of 154 days and a final completion timeline of 184 days. A mandatory pre-bid meeting is scheduled for February 27, 2024, and bids are due on March 14, 2024. The bid requires a 5% bid bond, and the contract will be awarded to the lowest responsive and responsible bidder.
The procurement is subject to Title VI of the Civil Rights Act of 1964, ensuring no discrimination in the bidding process or contract award. The Notice of Intent to Award indicates that North Georgia Concrete, Inc. of Dahlonega, Georgia was selected as the successful bidder with an award amount of $813,355.81. No other set-aside designations or incumbent vendors are specified in the bid documents. The total project budget or any funding sources are not directly stated.
Opportunity text
The project consists of the demolition of two single span concrete bridges (Bridge A and Bridge B) and replacing them with Contech aluminum bottomless box culverts. The box culverts will require concrete foundations and will have aluminum wingwalls provided in the Contech package. One bridge will require a new storm box and related 18¿ storm pipe. The project will require concrete work related to the bridge slab and barrier walls. A portion of the existing drives and parking lot will require asphalt demolition and replacement
Files
| File | Type | Posted |
|---|---|---|
| Addendum _1.pdf | ||
| Addendum _2.pdf | ||
| Addendum _4.pdf | ||
| Advertisement for Bidders_.pdf | ||
| Addendum _3.pdf | ||
| NOIA (Notice of Intent to Award)_ 24_007 Golf.docx | DOCX document | |
| Pre_BID Meeting_Sign in Sheet_2_27_2024.pdf |