Glendale Street Trail from New Jersey Road to Lakeland Highlands Road
Closed State & local contract opportunity
- Solicitation number
- 2026-ITB-111
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Tara Walls tara.walls@lakelandgov.net (863) 834-6780
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Lakeland is requesting bids on construction of the Glendale Street Trail, a 10-foot-wide shared-use path along Glendale Street from New Jersey Road to Lakeland Highlands Road, under ITB 2026-ITB-111, with bids due October 15, 2026 at 2:00 p.m., a mandatory pre-bid meeting on September 29, 2026 at 2:00 p.m., and questions due October 6, 2026 at 5:00 p.m. Contractors must be State of Florida registered and pre-qualified by the Florida Department of Transportation in workgroups (07) Drainage, (10) Flexible Paving, (28) Pavement Marking, (38) Roadway Signing, and (40) Sidewalk and Other Work Classes—a hard eligibility gate.
The scope includes clearing and grubbing, earthwork and grading, roadway reconstruction, sidewalk and driveway construction, and drainage improvements per plans prepared by the City of Lakeland Public Works Engineering Department (FPID: 453404-1-58-01, City Project No. 008202). Work shall comply with applicable codes, requirements, and regulations referenced in the project plans and specifications. The contract completion timeline is 240 calendar days with final completion within 270 calendar days; liquidated damages of $1,685 per calendar day apply for time overruns.
The project utilizes federal and state funding under a Local Agency Agreement with the Florida Department of Transportation, triggering additional compliance requirements beyond local standards. Bids are submitted on a lump-sum basis with unit pricing from the detailed bid form in the Project Manual. A bid bond equal to five percent of the bid price must accompany each submission. Successful bidders must furnish a public construction bond equal to the full contract price within ten days of award.
Required insurance includes commercial general liability ($2,000,000 single limit), business automobile liability ($1,000,000 single limit), workers' compensation, excess liability ($2,000,000), builder's risk or installation floater coverage, and contractors' pollution liability or environmental impairment liability ($1,000,000). Contractors and subcontractors performing trench excavation must certify compliance with Florida Trench Safety Act and OSHA standards (29 CFR 1926.650, Subpart P), with certifications retained for a minimum of three years following final acceptance.
Bids must be submitted electronically through the City's OpenGov e-Procurement Portal. Bid validity is 90 days from opening. The City reserves the right to waive minor informalities, reject any or all bids, accept partial bids, and award to one or more bidders based on responsiveness and responsibility. Required certifications include drug-free workplace, suspension and debarment, public entity crimes, E-Verify, conflict of interest, non-collusion, human trafficking affidavit, and notarized indemnification agreements binding the contractor and FDOT.
Opportunity text
THE SERVICES OF A STATE OF FLORIDA REGISTERED CONTRACTOR TO PROVIDE ALL REQUIRED MATERIALS, TOOLS, PERMITS, EQUIPMENT, TRAFFIC CONTROL, LABOR AND SUPERVISION FOR THE CONSTRUCTION OF THE GLENDALE STREET TRAIL FROM NEW JERSEY ROAD TO LAKELAND HIGHLANDS ROAD. THE CONTRACTOR SHALL BE PRE-QUALIFIED BY THE FLORIDA DEPARTMENT OF TRANSPORTATION IN THE FOLLOWING WORKGROUPS: (07) DRAINAGE, (10) FLEXIBLE PAVING, (28) PAVEMENT MARKING, (38) ROADWAY SIGNING, AND (40) SIDEWALK AND OTHER WORK CLASSES.
THE IMPROVEMENTS FOR THIS PROJECT ARE AS SHOWN IN THE DRAWINGS PREPARED BY THE CITY OF LAKELAND PUBLIC WORKS ENGINEERING DEPARTMENT (FPID: 453404-1-58-01 AND CITY OF LAKELAND PROJECT NO. 008202) AND GENERALLY CONSISTS OF CONSTRUCTION OF A 10-FOOT WIDE SHARED-USE PATH ALONG GLENDALE STREET FROM NEW JERSEY ROAD TO LAKELAND HIGHLANDS ROAD. THE PROJECT INCLUDES CLEARING AND GRUBBING, EARTHWORK AND GRADING, ROADWAY RECONSTRUCTION, SIDEWALK, DRIVEWAY CONSTRUCTION AND DRAINAGE IMPROVEMENTS.
THE SUBMITTALS RECEIVED AND THE CONTRACT, IF AWARDED, SHALL BE IN COMPLETE ACCORDANCE WITH THIS REQUEST FOR PROPOSAL AND THE PROJECT PLANS AND SPECIFICATIONS, AS PREPARED BY THE CITY OF LAKELAND PUBLIC WORKS ENGINEERING DEPARTMENT FOR THE CITY OF LAKELAND AND THE FLORIDA DEPARTMENT OF TRANSPORTATION, WITHOUT LIMITATION, AND ALL CODES, REQUIREMENTS, AND REGULATIONS REFERENCED THEREIN. IN ADDITION, FEDERAL AND STATE FUNDING IS BEING UTILIZED UNDER A LOCAL AGENCY AGREEMENT AND WILL BECOME PART OF THE REQUIREMENTS.