Gas Main Replacement Project 25
Closed State & local contract opportunity
- Solicitation number
- IFB194217
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- Point of contact
-
- Ann Marie Romero annmarie.romero@paloalto.gov (650) 329-2460
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Palo Alto is seeking bids for the Gas Main Replacement Project 25 (IFB #194217), a comprehensive infrastructure improvement initiative in Santa Clara County, California. The project involves replacing approximately 25,600 linear feet of gas main pipelines with 2-inch, 4-inch, and 6-inch diameter pipes, including installation under Matadero Creek and Barron Creek along Ross Road. Contractors must use Polyethylene (PE), PVC, and BWP materials for natural gas service pipelines and reconnect existing service lines. The project requires a Class A - General Engineering Contractor license, with a mandatory pre-bid meeting scheduled for July 2, 2025, at 10:00 am and bids due on July 24, 2025, before 3:00 pm. Evaluation criteria will focus on the bidder's ability, experience, equipment, resources, and past performance, with a lowest responsible bidder selection process. The project is anticipated to commence on January 20, 2026, with a completion time of 386 working days, and has been awarded a federal grant from the Department of Transportation for Natural Gas Distribution Infrastructure Safety and Modernization.
The procurement has specific requirements for contractor qualifications, including registration with the California Department of Industrial Relations (DIR) and compliance with prevailing wage regulations. Bidders must submit a bid security of 10% of the total bid amount and provide performance and payment bonds for 100% of the contract sum. The project includes stringent compliance requirements, such as adherence to the Build America, Buy America (BABA) Act, mandating domestically sourced materials, and a comprehensive COVID-19 Health & Safety Plan. Liquidated damages are set at $4,600 per day for unexcused delays. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the project requires detailed documentation for materials, including domestic content certifications and mill test reports. Insurance requirements are comprehensive, with minimum coverage limits for workers' compensation, general liability, automobile liability, and pollution liability. The project does not specify a precise budget range, but the extensive documentation and federal grant funding suggest a significant infrastructure investment for modernizing natural gas distribution infrastructure.
Opportunity text
The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of natural gas service pipelines. This project was selected and awarded with a federal grant by the Department of Transporation for Natural Gas Distribution Infrastructure Safety and Modernization.