FRCC OSA-AFB-2024-091M23 Upgrade/Replce Lighting Ctrl Sys WC
Closed State & local contract opportunity Posted
- Solicitation number
- IFB1 : 2024000153
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
Updated .
About this opportunity
The state and local contracting opportunity is for the Front Range Community College (FRCC), a state-funded higher education institution in Colorado, to upgrade and replace the existing lighting control system at their Westminster Campus. The scope of work includes replacing all existing relay-based lighting control panels with new relay panels, adding a new lighting control panel on the "A" Level, replacing existing override switches and photocell for daylight zones, and adding new control locations. The project is a Controlled Maintenance Project for the State of Colorado and is located within the jurisdictions of Adams County and the City of Westminster. The procurement is a Design/Bid/Build project, and sealed bids are due on March 27, 2024, by 2:00 PM MST. Bidders must have experience with similar projects and working on a Colorado state higher education campus, and provide evidence of general/electrical contracting services for at least two projects over $500,000 in the last three years. The contract will be awarded to the lowest responsible bidder, with preference given to Colorado resident bidders and for Colorado labor as required by state law.
The procurement has a 5% bid bond or proposal guaranty requirement for projects valued at $50,000 or greater. The estimated construction cost for this project is $200,000. The procurement documents do not indicate any set-aside designations or restrictions on the types of organizations that can respond, nor do they list any incumbent vendors or current contractors. The project will require integration with the existing infrastructure and technology at the FRCC Westminster Campus, but the details of the current environment are not provided.
Opportunity text
FRCC-AFB-24-02-W Front Range Community College has received a Controlled Maintenance Project from the State of Colorado to replace the existing Lighting Control System at the Westminster Campus. The current system is obsolete. The scope includes the replacement of all existing relay-based lighting control panels with new relay panels. Adding a new lighting control panel on "A' Level. Replace existing override switches, photocell for daylight zones. Added new control locations.
Files
Show all 15
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity