This document is the Bid Alternates Form from the State of Colorado Office of the State Architect for a project at Front Range Community College to upgrade and replace the existing lighting control system at the Westminster campus. The project involves the replacement of all existing relay-based lighting control panels with new relay panels, adding a new lighting control panel on the "A" Level, and replacing existing override switches and photocells for daylight zones. The project has additive and deductive alternates that would modify the base bid if accepted, including connecting existing restroom lighting to the new system, replacing existing exterior lighting photocells and time clocks, and reusing existing CAT5 cable for network connections.
The contract opportunity is a Controlled Maintenance Project for the State of Colorado, involving the jurisdictions of Adams County and the City of Westminster. Pricing details, funding sources, and other contract terms are not provided in this document.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP –6.131
Issued 8/2023
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES FORM
Institution/Agency: Front Range Community College Project No./Name: 2024-091M23 Upgrade Replace Lighting Control System WC Ph 1 of 1
Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
Additive Alternates (If Applicable) If the add alternates are accepted, the base bid would be modified by the amount entered by the bidder.
A.A. No. 1 Connect existing rest room lighting to new lighting control system.
Add $
A.A. No. 2 Replace existing exterior lighting photocells with new and connection to lighting control system.
Add $
A.A. No. 3 Replace existing exterior lighting time clock with connection to lighting control system.
Add $
Deductive Alternates (If Applicable)
If the deductive alternates are accepted, the base bid would be modified by the amount entered by the bidder.
D.A. No. 1 Reuse existing CAT5 cable for network connections between panels and existing low voltage switch locations.
Deduct $
THE BIDDER:
Company Name
Signature Date
| STATE OF COLORADO |
| OFFICE OF THE STATE ARCHITECT |
| BID ALTERNATES FORM |
| Front Range Community College |
| 2024-091M23 Upgrade Replace Lighting Control System WC Ph 1 of 1 |