ER OR42 MP18. 9 Culvert Repair Project

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00014939
State
Oregon
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is seeking bids for the ER OR42 MP18.9 Culvert Repair Project located in Coos County, Oregon. The project involves emergency relief work along the Coos Bay - Roseburg Highway (OR42) at Milepost 18.9, with specific objectives including removing an existing 18" culvert pipe and installing a new 30" culvert pipe through the eastbound travel lanes, reconstructing the roadway, and constructing a rock buttress. Key deliverables include temporary traffic protection, water management, erosion control, subgrade stabilization, culvert pipe installation, slope end sections, resurfacing, pavement removal, and asphalt concrete placement. The project is scheduled to begin upon Notice to Proceed, with Substantial Completion required by November 20, 2025, and Final Completion by November 27, 2025. Bids must be submitted electronically through the OregonBuys system by October 7, 2025. Bidders must comply with federal and state requirements, including prevailing wage rates, Buy America provisions, and Davis-Bacon Act regulations, and demonstrate capabilities in highway infrastructure construction and emergency relief project implementation.

The contract includes specific set-aside requirements and workforce considerations, particularly for apprenticeship programs. Contractors with contracts valued at $750,000 or more must employ apprentices for 12 percent of work hours in apprenticeable occupations and must be BOLI Registered Training Agents. The project emphasizes diversity, equity, and inclusion goals, with aspirational targets for workforce composition. While no specific incumbent vendors are mentioned, the project is funded through state funds and will be reimbursed by the Federal Highway Administration (FHWA) Emergency Relief Program. Bidders are required to provide a performance and payment bond of 100% of the contract price, though the exact project budget is not explicitly stated. Contractors must navigate complex compliance requirements, including utility coordination with multiple providers such as Pacific Power, Ziply Fiber, Douglas Fast Net, and AT&T, and adhere to strict environmental and technical specifications for construction methods, materials, testing, and protection measures.

Opportunity text

Remove an existing 18" culvert pipe and install 30" culvert pipe extending through the east bound travel lanes, re-construct the roadway and construct a rock buttress.

Files

File Type Posted
Copy of ATT C Bid Pricing Form 00014939.xlsx XLSX spreadsheet
ADD 1 ATT C Bid Pricing Form R1.xlsx XLSX spreadsheet
ATT I FHWA Form 1273~4.pdf PDF
00014939 Addendum 1.docx DOCX document
ADD 1 ATT A Special Provisions and Specifications R1.pdf PDF
00014939 Invitation to Bid.docx DOCX document
ATT B Plans~30.pdf PDF
Attachment H Apprenticeship Requirements~1.docx DOCX document
COBID Notice_NVC~1.pdf PDF
ATT A Special Provisions and Specifications~37.pdf PDF
ATT G Project Wage Rates~3.pdf PDF
00014939 Bid Results.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors