ER OR42 MP18. 9 Culvert Repair Project
Solicitation number
S-73000-00014939
Issued by
Coos County, Oregon

About this file

The document is a bid tabulation sheet for the ER OR42 MP18.9 Culvert Repair Project issued by the Oregon Department of Transportation (ODOT), detailing bids from eight construction companies for a culvert repair project along the Coos Bay - Roseburg Highway. The project involves removing an existing 18" culvert pipe and installing a new 30" culvert pipe through the eastbound travel lanes, with bid closing on October 7, 2025, at 2:00 PM. The scope includes temporary traffic protection, water management, erosion control, subgrade stabilization, culvert pipe installation, slope end sections, resurfacing, pavement removal, and asphalt concrete placement, with substantial completion required by November 20, 2025, and final completion by November 27, 2025.

The bid tabulation reveals total bid prices ranging from $1,570,568.00 to $3,413,356.90, with bids submitted by JRT Construction, Johnson Rock Products, Moore Excavation, Rogue Line, LaDuke Construction, LTM/Knife River Materials, Granite Construction, and Farline Bridge. The project will be funded through state funds and reimbursed by the Federal Highway Administration Emergency Relief Program. Contractors must comply with specific requirements, including employing apprentices for 12% of work hours, being BOLI Registered Training Agents for contracts over $750,000, and meeting diversity and equity workforce composition goals. The project involves complex technical specifications, utility coordination, and adherence to federal and state regulations, including prevailing wage rates and Buy America provisions.

View the file

Other files

File Type Posted
ADD 1 ATT A Special Provisions and Specifications R1.pdf PDF
ADD 1 ATT C Bid Pricing Form R1.xlsx XLSX spreadsheet
00014939 Invitation to Bid.docx DOCX document
COBID Notice_NVC~1.pdf PDF
Attachment H Apprenticeship Requirements~1.docx DOCX document
ATT A Special Provisions and Specifications~37.pdf PDF
ATT B Plans~30.pdf PDF
Copy of ATT C Bid Pricing Form 00014939.xlsx XLSX spreadsheet
ATT G Project Wage Rates~3.pdf PDF
ATT I FHWA Form 1273~4.pdf PDF
00014939 Addendum 1.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:10/7/25
ITB No.S-73000-00014939BIDDER
NAME:JRT Construction, LLCJohnson Rock Products, Inc.Moore Excavation Inc.Rogue Line LLCLaDuke Construction, LLCLTM, Incorporated dba Knife River MaterialsGranite Construciton Co.Farline Bridge, Inc
Bid Closing:10/7/2025 @ 2:00 PMCITY/STATE:Oakland, ORCoos Bay, ORFairview, ORMyrtle Point, ORCentral Point, ORCoos Bay, ORHermiston, ORStayton, OR
Description:ER OR42 MP18.9 Culvert Repair ProjectCCB#20516134185283971713999750256603101195194787
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$156,000.00$156,000.00$95,300.00$95,300.00$170,000.00$170,000.00$60,000.00$60,000.00$188,000.00$188,000.00$168,085.00$168,085.00$180,000.00$180,000.00$341,000.00$341,000.00
2Temporary Protection and Direction of Traffic1LS$26,000.00$26,000.00$53,100.00$53,100.00$30,000.00$30,000.00$57,000.00$57,000.00$28,000.00$28,000.00$66,420.00$66,420.00$50,000.00$50,000.00$100,000.00$100,000.00
3Temporary Signs180SQFT$40.00$7,200.00$41.60$7,488.00$32.00$5,760.00$40.00$7,200.00$36.00$6,480.00$30.00$5,400.00$25.00$4,500.00$30.00$5,400.00
4Sequential Arrow Signs3EA$2,500.00$7,500.00$1,900.00$5,700.00$1,800.00$5,400.00$1,550.00$4,650.00$2,000.00$6,000.00$1,135.00$3,405.00$2,000.00$6,000.00$1,350.00$4,050.00
5Portable Changeable Message Signs2EA$5,000.00$10,000.00$3,425.00$6,850.00$6,000.00$12,000.00$4,500.00$9,000.00$4,500.00$9,000.00$1,135.00$2,270.00$4,000.00$8,000.00$1,350.00$2,700.00
6Temporary Barricades, Type III5EA$175.00$875.00$345.00$1,725.00$275.00$1,375.00$195.00$975.00$180.00$900.00$200.00$1,000.00$200.00$1,000.00$175.00$875.00
7Temporary Plastic Drums88EA$50.00$4,400.00$49.50$4,356.00$75.00$6,600.00$52.00$4,576.00$80.00$7,040.00$57.00$5,016.00$70.00$6,160.00$50.00$4,400.00
8Temporary Non-Reflective Tape4950FT$5.00$24,750.00$10.50$51,975.00$4.25$21,037.50$3.00$14,850.00$10.25$50,737.50$4.00$19,800.00$8.25$40,837.50$4.00$19,800.00
9Temporary Barrier850FT$27.50$23,375.00$34.90$29,665.00$30.00$25,500.00$42.00$35,700.00$40.00$34,000.00$27.65$23,502.50$35.00$29,750.00$18.00$15,300.00
10Temporary Impact Attenuator, Narrow Site System2EA$4,500.00$9,000.00$5,710.00$11,420.00$5,000.00$10,000.00$5,000.00$10,000.00$4,000.00$8,000.00$4,525.00$9,050.00$5,000.00$10,000.00$3,500.00$7,000.00
11Temporary Impact Attenuator, Truck Mounted1EA$10,000.00$10,000.00$6,600.00$6,600.00$12,000.00$12,000.00$16,000.00$16,000.00$14,000.00$14,000.00$4,260.00$4,260.00$15,000.00$15,000.00$10,000.00$10,000.00
12Repair Temporary Impact Attenuator, Narrow Site System4EA$500.00$2,000.00$630.00$2,520.00$1,000.00$4,000.00$1,200.00$4,800.00$300.00$1,200.00$500.00$2,000.00$2,500.00$10,000.00$10.00$40.00
13Repair Temporary Impact Attenuator, Truck Mounted2EA$150.00$300.00$1,900.00$3,800.00$1,000.00$2,000.00$26,000.00$52,000.00$1,100.00$2,200.00$850.00$1,700.00$5,000.00$10,000.00$10.00$20.00
14Temporary Water Management Facility1LS$5,500.00$5,500.00$4,300.00$4,300.00$9,000.00$9,000.00$4,500.00$4,500.00$32,000.00$32,000.00$8,250.00$8,250.00$50,000.00$50,000.00$35,000.00$35,000.00
15Erosion Control1LS$3,000.00$3,000.00$3,150.00$3,150.00$4,000.00$4,000.00$3,000.00$3,000.00$9,400.00$9,400.00$1,135.00$1,135.00$30,000.00$30,000.00$15,000.00$15,000.00
16Plastic Sheeting500SQYD$5.00$2,500.00$0.70$350.00$2.75$1,375.00$0.60$300.00$5.00$2,500.00$1.50$750.00$4.00$2,000.00$9.00$4,500.00
17Construction Entrance, Type 11EA$2,500.00$2,500.00$2,550.00$2,550.00$4,500.00$4,500.00$2,500.00$2,500.00$3,400.00$3,400.00$3,900.00$3,900.00$15,000.00$15,000.00$3,500.00$3,500.00
18Sediment Fence500FT$3.00$1,500.00$0.60$300.00$5.00$2,500.00$5.00$2,500.00$6.00$3,000.00$4.00$2,000.00$10.00$5,000.00$6.00$3,000.00
19Straw Bale30EA$60.00$1,800.00$13.00$390.00$45.00$1,350.00$20.00$600.00$23.00$690.00$77.00$2,310.00$100.00$3,000.00$50.00$1,500.00
20Pollution Control Plan1LS$500.00$500.00$400.00$400.00$1,500.00$1,500.00$600.00$600.00$1,200.00$1,200.00$115.00$115.00$2,500.00$2,500.00$3,500.00$3,500.00
21Construction Survey Work1LS$12,500.00$12,500.00$2,550.00$2,550.00$24,000.00$24,000.00$11,000.00$11,000.00$26,500.00$26,500.00$8,850.00$8,850.00$15,000.00$15,000.00$16,800.00$16,800.00
22Removal of Pipes172FT$7.00$1,204.00$135.00$23,220.00$10.00$1,720.00$50.00$8,600.00$20.00$3,440.00$6.00$1,032.00$150.00$25,800.00$87.20$14,998.40
23Removal of Structures and Obstructions1LS$15,000.00$15,000.00$19,850.00$19,850.00$15,000.00$15,000.00$2,200.00$2,200.00$14,000.00$14,000.00$395.00$395.00$15,000.00$15,000.00$55,000.00$55,000.00
24Asphalt Pavement Saw Cutting (10 Inch Depth)400FT$5.00$2,000.00$9.65$3,860.00$9.00$3,600.00$24.00$9,600.00$8.00$3,200.00$11.00$4,400.00$6.00$2,400.00$4.25$1,700.00
25Clearing and Grubbing1LS$15,000.00$15,000.00$7,350.00$7,350.00$32,000.00$32,000.00$19,000.00$19,000.00$46,000.00$46,000.00$9,700.00$9,700.00$10,000.00$10,000.00$50,000.00$50,000.00
26General Excavation13025CUYD$16.00$208,400.00$12.10$157,602.50$27.00$351,675.00$23.00$299,575.00$18.20$237,055.00$20.20$263,105.00$50.00$651,250.00$33.90$441,547.50
27Stone Embankment21210TONS$30.00$636,300.00$36.60$776,286.00$28.00$593,880.00$33.00$699,930.00$39.65$840,976.50$36.05$764,620.50$60.00$1,272,600.00$36.10$765,681.00
2818 Inch Subgrade Stabilization25SQYD$50.00$1,250.00$81.00$2,025.00$65.00$1,625.00$90.00$2,250.00$43.00$1,075.00$225.00$5,625.00$140.00$3,500.00$130.00$3,250.00
29Riprap Geotextile, Type 23500SQYD$3.00$10,500.00$2.60$9,100.00$2.40$8,400.00$4.00$14,000.00$3.00$10,500.00$1.62$5,670.00$10.00$35,000.00$5.00$17,500.00
30Subgrade Geotextile700SQYD$2.25$1,575.00$1.75$1,225.00$1.75$1,225.00$4.00$2,800.00$2.30$1,610.00$1.03$721.00$10.00$7,000.00$3.00$2,100.00
31Riprap Basins1EA$2,250.00$2,250.00$1,600.00$1,600.00$2,000.00$2,000.00$1,675.00$1,675.00$1,600.00$1,600.00$1,500.00$1,500.00$3,000.00$3,000.00$5,000.00$5,000.00
32Mainline Video Inspection172FT$17.00$2,924.00$35.00$6,020.00$20.00$3,440.00$25.00$4,300.00$30.00$5,160.00$17.50$3,010.00$5.00$860.00$30.00$5,160.00
3330 Inch Culvert Pipe, Over 20 FT Depth172FT$330.00$56,760.00$212.00$36,464.00$400.00$68,800.00$1,150.00$197,800.00$550.00$94,600.00$2,193.00$377,196.00$500.00$86,000.00$6,250.00$1,075,000.00
34Sloped End Sections, 30 Inch2EA$500.00$1,000.00$1,950.00$3,900.00$1,200.00$2,400.00$650.00$1,300.00$450.00$900.00$2,810.00$5,620.00$2,000.00$4,000.00$5,500.00$11,000.00
35Safety End Sectins, 30 Inch2EA$4,250.00$8,500.00$2,125.00$4,250.00$9,000.00$18,000.00$1,600.00$3,200.00$1,000.00$2,000.00$3,077.00$6,154.00$7,500.00$15,000.00$3,500.00$7,000.00
36Trench Resurfacing40SQYD$230.00$9,200.00$190.00$7,600.00$120.00$4,800.00$380.00$15,200.00$90.00$3,600.00$380.00$15,200.00$600.00$24,000.00$150.00$6,000.00
37Cold Plan Pavement Removal, 3 Inches Deep250SQYD$30.00$7,500.00$44.92$11,230.00$72.00$18,000.00$34.00$8,500.00$29.00$7,250.00$42.24$10,560.00$50.00$12,500.00$18.00$4,500.00
38Aggregate Base and Shoulders1310TON$32.00$41,920.00$56.00$73,360.00$42.00$55,020.00$65.00$85,150.00$29.00$37,990.00$50.00$65,500.00$75.00$98,250.00$130.00$170,300.00
39Level 3, 1/2 Inch ACP Mixture (64-22 oil)800TON$245.00$196,000.00$195.00$156,000.00$185.00$148,000.00$200.00$160,000.00$165.00$132,000.00$144.00$115,200.00$200.00$160,000.00$202.60$162,080.00
40Delineators, Type 12EA$125.00$250.00$160.00$320.00$150.00$300.00$240.00$480.00$120.00$240.00$126.00$252.00$250.00$500.00$500.00$1,000.00
41Culvert Drainage Markers, Type 12EA$85.00$170.00$110.00$220.00$150.00$300.00$240.00$480.00$120.00$240.00$86.00$172.00$85.00$170.00$85.00$170.00
42Bi-Directional Yellow Type IAR Markers20EA$12.00$240.00$15.00$300.00$13.00$260.00$70.00$1,400.00$45.00$900.00$12.00$240.00$12.00$240.00$12.00$240.00
43Thermoplastic, Sprayed, Surface, Non-Profiled900FT$3.85$3,465.00$5.00$4,500.00$5.00$4,500.00$6.00$5,400.00$4.00$3,600.00$4.00$3,600.00$3.85$3,465.00$3.85$3,465.00
44Permanent Seeding0.5ACRE$12,000.00$6,000.00$15,230.00$7,615.00$7,500.00$3,750.00$10,500.00$5,250.00$14,000.00$7,000.00$12,000.00$6,000.00$12,000.00$6,000.00$12,000.00$6,000.00
45Topsoil470CUYD$68.00$31,960.00$86.30$40,561.00$52.00$24,440.00$102.00$47,940.00$78.00$36,660.00$69.00$32,430.00$68.00$31,960.00$24.00$11,280.00
TOTAL$ 1,570,568.00$ 1,648,947.50$1,717,032.50$ 1,897,781.00$ 1,925,844.00$2,037,121.00$2,962,242.50$3,413,356.90