DFCM Construction - Invitational - Division of Facilities Construction and Management - BRC Exterior Disconnects and Electrical Upgrades - Project #26353310

Closed State & local contract opportunity Posted

Solicitation number
CS27004
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for exterior electrical disconnects and meter installation at Brigham Regional Center under an invitational procurement limited to five pre-selected contractors, with bids due August 11, 2026 and a mandatory pre-bid meeting on July 28, 2026 at 11:00 a.m. in Brigham City.

Only the following five contractors are invited to bid: BML (Rich Ulrich), Electric Works (Kade Archibald), Kendrick Electrical (Bryan Kendrick), Luminary Electric (Alex Rogers), and Paragon Electric (Richie Benson). Attendance at the mandatory pre-bid meeting is required for all prime contractors wishing to bid.

The scope encompasses redesigned installation of new exterior disconnect and meter, an 800-ampere main service disconnect at Bridgerland Tech College, a 600-ampere main service disconnect at Beauty College, new CT enclosures and CT meters, trenching and asphalt replacement, new secondary conductors and panel feeders, relocation of distribution panels, refeeding of existing panels, and conversion of switchboard rooms. Work must comply with the 2020 National Electrical Code, ACI 301 concrete standards, and applicable ASTM and UL standards. All electrical conductors must be copper with THHN-2/THWN-2 insulation. The contractor must maintain full owner occupancy during construction, coordinate all utility shutdowns with the building owner for non-business-hours performance, and complete field verification of panel clearances, testing, and commissioning prior to project completion. A limited hazardous-materials survey identified lead-based paint exceeding OSHA thresholds on the upstairs electrical room door and possible mercury-containing thermostats and fluorescent ballasts; contractors must comply with OSHA Lead in Construction Standard 1926.62 if disturbance occurs.

The construction cost estimate is $122,000.00 with a substantial completion date of February 28, 2027. A bid bond equal to 5% of bid amount on AIA Document A310-2010 form must accompany all submissions. Liquidated damages are assessed at $100.00 per day. Questions are due July 30, 2026; addendum deadline is August 3, 2026; subcontractor lists are due August 12, 2026. Contact DFCM Project Manager Carl Francis at jcfrancis@utah.gov or 435-230-2086.

Opportunity text

**INVITATIONAL** Only invited contractors listed below are allowed to attend the mandatory meeting. **Contractor Name: BML - Rich Ulrich** **Contractor Name: Electric Works - Kade Archibald** **Contractor Name: Kendrick Electrical - Bryan Kendrick** **Contractor Name: Luminary Electric - Alex Rogers** **Contractor Name: Paragon Electric - Richie Benson** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project: **Project Description: Re-designed installation of a new exterior disconnect, and meter at Brigham Regional Center** **Construction Cost Estimate: $122,000.00**