2-3-CS27004-26353310-Approved Specs.pdf
PDF 2 MB Posted
- Solicitation number
- CS27004
- Issued by
- Box Elder County, Utah
About this file
Summary of Contract Documents
This is a specifications and approved drawings document prepared by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Brigham Regional Center Exterior Disconnects and Electrical Upgrades project (Project #26353310), reviewed for code compliance on May 11, 2026. The project involves the redesigned installation of a new exterior disconnect and meter at the Brigham Regional Center facility. The work encompasses electrical infrastructure upgrades including low-voltage and control-voltage electrical power conductors and cables, raceways and boxes for electrical systems, grounding and bonding systems, hangers and supports, vibration and seismic controls, identification systems, selective demolition of existing components, and miscellaneous cast-in-place concrete work. The contract requires full compliance with ACI 301 standards for concrete, NFPA 70 (National Electrical Code) requirements, and various ASTM and UL standards for electrical materials and installation. Work must accommodate full owner occupancy during construction, maintain weathertight conditions, coordinate operations to minimize disruption, and comply with nonsmoking policies and controlled substance restrictions. The construction cost estimate is $122,000.00, and this is an invitational bid limited to five specifically named electrical contractors: BML, Electric Works, Kendrick Electrical, Luminary Electric, and Paragon Electric.
The specifications require comprehensive submittal procedures including shop drawings, product data, samples, and closeout documentation submitted for architect approval prior to installation. All electrical conductors must be copper with THHN-2/THWN-2 insulation for feeders and branch circuits, and connections must comply with UL 486A-486B torque specifications. The contractor must maintain complete record documents throughout construction, provide operation and maintenance manuals organized by system, and conduct training for owner personnel on equipment operation and maintenance. Waste management must comply with ASTM E 1609 standards with documented recycling and disposal procedures. Final completion requires demonstration of all systems, submittal of record drawings as corrected digital files, and warranty documentation organized according to the project manual table of contents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-4-CS27004-26353310-HazMat Survey.pdf | ||
| 4-1-CS27004-26353310-Solicitation.pdf | ||
| 3-2-CS27004-26353310-Approved Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
05/11/2026
| 000101 fl - project title page |
| 000000 toc |
| 000115 fl - list of drawing sheets |
| 1.1 LIST OF DRAWINGS |
| A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled BRIGHAM REGIONAL CENTER—EXTERIOR DISCONNECTS & ELECTRICAL UPGRADES, dated 4/17/2026, as modified by subsequent Addenda and Contract modifications. |
| B. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated: |
| 011000 fl - summary |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| B. Related Requirements: |
| 1.3 PROJECT INFORMATION |
| A. Project Identification: Brigham Regional Center—Exterior Disconnects and Electrical Upgrades. |
| B. Owner: State of Utah, DFCM. |
| C. Project Engineers: |
| D. Project Engineer’s Consultants: N/A |
| 1.4 WORK COVERED BY CONTRACT DOCUMENTS |
| A. The Work of Project is defined by the Contract Documents and consists of the following: |
| B. Type of Contract: |
| 1.5 ACCESS TO SITE |
| A. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. |
| B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. |
| 1.6 COORDINATION WITH OCCUPANTS |
| A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. |
| 1.7 WORK RESTRICTIONS |
| A. Work Restrictions, General: Comply with restrictions on construction operations. |
| B. Existing Service Interruptions: Do not interrupt services serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: |
| C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner. |
| D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes. |
| E. Controlled Substances: Use of tobacco products and other controlled substances within the existing building is not permitted. |
| F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times. |
| G. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site. |
| 1.8 SPECIFICATION AND DRAWING CONVENTIONS |
| A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: |
| B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications. |
| C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products: |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |
| 013300 sf - submittal procedures |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. |
| B. Related Requirements: |
| 1.2 DEFINITIONS |
| A. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action. |
| B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's responsive action. Submittals may be rejected for not complying with requirements. |
| 1.3 SUBMITTAL ADMINISTRATIVE REQUIREMENTS |
| A. Architect's Digital Data Files: Electronic copies of digital data files of the Contract Drawings will be provided by Architect for Contractor's use in preparing submittals. |
| B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. |
| C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. |
| D. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows: |
| E. Options: Identify options requiring selection by Architect. |
| F. Deviations: Identify deviations from the Contract Documents on submittals. |
| G. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. |
| H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. |
| I. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp. |
| PART 2 - PRODUCTS |
| 2.1 SUBMITTAL PROCEDURES |
| A. General Submittal Procedure Requirements: |
| B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. |
| C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. |
| D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed. |
| E. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: |
| F. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Section 017700 "Closeout Procedures." |
| G. Maintenance Data: Comply with requirements specified in Section 017823 "Operation and Maintenance Data." |
| H. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified. |
| I. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project. |
| J. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required. |
| K. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents. |
| L. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents. |
| M. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. |
| PART 3 - EXECUTION |
| 3.1 CONTRACTOR'S REVIEW |
| A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect. |
| B. Project Closeout and Maintenance Material Submittals: See requirements in Section 017700 "Closeout Procedures." |
| C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. |
| 3.2 ARCHITECT'S ACTION |
| A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action. |
| B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or revisions required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action. |
| C. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party. |
| D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review. |
| E. Submittals not required by the Contract Documents may not be reviewed and may be discarded. |
| 016000 fl - product requirements |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products. |
| 1.3 DEFINITIONS |
| A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. |
| 1.4 QUALITY ASSURANCE |
| A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options. |
| 1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING |
| A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions. |
| B. Delivery and Handling: |
| C. Storage: |
| 1.6 PRODUCT WARRANTIES |
| A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. |
| B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. |
| C. Submittal Time: Comply with requirements in Section 017700 "Closeout Procedures." |
| PART 2 - PRODUCTS |
| 2.1 PRODUCT SELECTION PROCEDURES |
| A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation. |
| B. Product Selection Procedures: |
| C. Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items. |
| 2.2 COMPARABLE PRODUCTS |
| A. Conditions for Consideration: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect may return requests without action, except to record noncompliance with these requirements: |
PART 3 - EXECUTION (Not Used)
| 017300 fl - execution |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: |
| 1.3 DEFINITIONS |
| A. Cutting: Removal of in-place construction necessary to permit installation or performance of other work. |
| B. Patching: Fitting and repair work required to restore construction to original conditions after installation of other work. |
| 1.4 QUALITY ASSURANCE |
| A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements. |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. General: Comply with requirements specified in other Sections. |
| B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work. |
| B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations. |
| C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. |
| 3.2 PREPARATION |
| A. Existing Utility Information: Furnish information to Owner that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction. |
| B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. |
| C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings. |
| D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Architect according to requirements in Section 013100 "Project Management and Coordination." |
| 3.3 CONSTRUCTION LAYOUT |
| A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly. |
| B. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations. |
| 3.4 INSTALLATION |
| A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. |
| B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated. |
| C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion. |
| D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy. |
| E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations. |
| F. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels. |
| G. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements. |
| H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions. |
| I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints. |
| 3.5 CUTTING AND PATCHING |
| A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay. |
| B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties. |
| C. Temporary Support: Provide temporary support of work to be cut. |
| D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations. |
| E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching according to requirements in Section 011000 "Summary." |
| F. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas. |
| G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. |
| H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable. |
| I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces. |
| 3.6 OWNER-INSTALLED PRODUCTS |
| A. Site Access: Provide access to Project site for Owner's construction personnel. |
| B. Coordination: Coordinate construction and operations of the Work with work performed by Owner's construction personnel. |
| 3.7 PROGRESS CLEANING |
| A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully. |
| B. Site: Maintain Project site free of waste materials and debris. |
| C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work. |
| D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces. |
| E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. |
| F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. |
| G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Section 017419 "Construction Waste Management and Disposal." |
| H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion. |
| I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects. |
| J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. |
| 3.8 STARTING AND ADJUSTING |
| A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest. |
| B. Adjust equipment for proper operation. Adjust operating components for proper operation without binding. |
| C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. |
| 3.9 PROTECTION OF INSTALLED CONSTRUCTION |
| A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion. |
| B. Comply with manufacturer's written instructions for temperature and relative humidity. |
| 017419 sf - construction waste management and disposal |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes administrative and procedural requirements for the following: |
| B. Related Requirements: |
| 1.2 DEFINITIONS |
| A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging. |
| B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations. |
| C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction. |
| D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse. |
| E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility. |
| F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work. |
| 1.3 WASTE MANAGEMENT PLAN |
| A. General: Develop a waste management plan according to ASTM E 1609 and requirements in this Section. Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION |
| 3.1 PLAN IMPLEMENTATION |
| A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract. |
| B. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. |
| 3.2 SALVAGING DEMOLITION WASTE |
| A. Salvaged Items for Reuse in the Work: |
| B. Salvaged Items for Owner's Use: |
| 3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL |
| A. General: Recycle paper and beverage containers used by on-site workers. |
| B. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan. |
| 3.4 RECYCLING DEMOLITION WASTE |
| A. Metals: Separate metals by type. |
| B. Conduit: Reduce conduit to straight lengths and store by type and size. |
| 3.5 RECYCLING CONSTRUCTION WASTE |
| A. Packaging: |
| 3.6 DISPOSAL OF WASTE |
| A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction. |
| B. Burning: Do not burn waste materials. |
| C. Disposal: Remove waste materials from Owner's property and legally dispose of them. |
| 017700 fl - closeout procedures |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: |
| 1.3 CLOSEOUT SUBMITTALS |
| A. Certificates of Release: From authorities having jurisdiction. |
| 1.4 SUBSTANTIAL COMPLETION PROCEDURES |
| A. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. |
| B. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. |
| C. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued. |
| 1.5 FINAL COMPLETION PROCEDURES |
| A. Submittals Prior to Final Completion: Before requesting final inspection for determining final completion, complete the following: |
| 1.6 SUBMITTAL OF PROJECT WARRANTIES |
| A. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual. |
| B. Provide additional copies of each warranty to include in operation and maintenance manuals. |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. |
| PART 3 - EXECUTION |
| 3.1 FINAL CLEANING |
| A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. |
| B. Construction Waste Disposal: Comply with waste disposal requirements in Section 017419 "Construction Waste Management and Disposal." |
| 3.2 REPAIR OF THE WORK |
| A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion. |
| B. Repair or remove and replace defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired. Restore damaged construction and permanent facilities used during construction to specified condition. |
| 017823 fl - operation and maintenance data |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following: |
| B. Related Requirements: |
| 1.3 DEFINITIONS |
| A. System: An organized collection of parts, equipment, or subsystems united by regular interaction. |
| B. Subsystem: A portion of a system with characteristics similar to a system. |
| 1.4 CLOSEOUT SUBMITTALS |
| A. Manual Content: Operations and maintenance manual content is specified in individual Specification Sections to be reviewed at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section. |
| B. Format: Submit operations and maintenance manuals in the following format: |
| C. Initial Manual Submittal: Submit draft copy of each manual at least 30 days before commencing demonstration and training. Architect will comment on whether general scope and content of manual are acceptable. |
| D. Final Manual Submittal: Submit each manual in final form prior to requesting inspection for Substantial Completion and at least 15 days before commencing demonstration and training. Architect will return copy with comments. |
| PART 2 - PRODUCTS |
| 2.1 REQUIREMENTS FOR EMERGENCY, OPERATION, AND MAINTENANCE MANUALS |
| A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed: |
| B. Title Page: Include the following information: |
| C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual. |
| D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder. |
| E. Manuals, Electronic Files: Submit manuals in the form of a multiple file composite electronic PDF file for each manual type required. |
| F. Manuals, Paper Copy: Submit manuals in the form of hard copy, bound and labeled volumes. |
| 2.2 OPERATION MANUALS |
| A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information: |
| B. Descriptions: Include the following: |
| C. Operating Procedures: Include the following, as applicable: |
| D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed. |
| E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification. |
| 2.3 PRODUCT MAINTENANCE MANUALS |
| A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below. |
| B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable. |
| C. Product Information: Include the following, as applicable: |
| D. Maintenance Procedures: Include manufacturer's written recommendations and the following: |
| E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services. |
| F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. |
| 2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS |
| A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below. |
| B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable. |
| C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the following information for each component part or piece of equipment: |
| D. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures: |
| E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment. |
| F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services. |
| G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent. |
| H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. |
| PART 3 - EXECUTION |
| 3.1 MANUAL PREPARATION |
| A. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system. |
| B. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable. |
| C. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in record Drawings to ensure correct illustration of completed installation. |
| D. Comply with Section 017700 "Closeout Procedures" for schedule for submitting operation and maintenance documentation. |
| 017839 fl - project record documents |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes administrative and procedural requirements for project record documents, including the following: |
| 1.3 CLOSEOUT SUBMITTALS |
| A. Record Drawings: Comply with the following: |
| B. Record Product Data: Submit one paper copy and annotated PDF electronic files and directories of each submittal. |
| C. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous record-keeping requirements and submittals in connection with various construction activities. Submit one paper copy and annotated PDF electronic files and directories of each submittal. |
| PART 2 - PRODUCTS |
| 2.1 RECORD DRAWINGS |
| A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. |
| B. Record Digital Data Files: Immediately before inspection for Certificate of Substantial Completion, review marked-up record prints with Architect. When authorized, prepare a full set of corrected digital data files of the Contract Drawings, as follows: |
| C. Newly Prepared Record Drawings: Prepare new Drawings instead of preparing record Drawings where Architect determines that neither the original Contract Drawings nor Shop Drawings are suitable to show actual installation. |
| D. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. |
| 2.2 RECORD PRODUCT DATA |
| A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. |
| B. Format: Submit record Product Data as scanned or annotated PDF electronic file(s) of marked-up paper copy of Product Data. |
| 2.3 MISCELLANEOUS RECORD SUBMITTALS |
| A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. |
| B. Format: Submit miscellaneous record submittals as PDF electronic file or scanned PDF electronic file(s) of marked-up miscellaneous record submittals. |
| PART 3 - EXECUTION |
| 3.1 RECORDING AND MAINTENANCE |
| A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project. |
| B. Maintenance of Record Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's reference during normal working hours. |
| 017900 fl - demonstration and training |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes administrative and procedural requirements for instructing Owner's personnel, including the following: |
| 1.3 QUALITY ASSURANCE |
| A. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Section 014000 "Quality Requirements," experienced in operation and maintenance procedures and training. |
| 1.4 COORDINATION |
| A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to minimize disrupting Owner's operations and to ensure availability of Owner's personnel. |
| B. Coordinate instructors, including providing notification of dates, times, length of instruction time, and course content. |
| PART 2 - PRODUCTS |
| 2.1 INSTRUCTION PROGRAM |
| A. Program Structure: Develop an instruction program that includes individual training modules for each system and for equipment not part of a system, as required by individual Specification Sections. |
| B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: |
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a training manual organized in coordination with requirements in Section 017823 "Operation and Maintenance Data." |
| B. Set up instructional equipment at instruction location. |
| 3.2 INSTRUCTION |
| A. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. |
| B. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. |
| C. Training Location and Reference Material: Conduct training on-site in the completed and fully operational facility using the actual equipment in-place. Conduct training using final operation and maintenance data submittals. |
| D. Cleanup: Collect used and leftover educational materials and remove from Project site. Remove instructional equipment. Restore systems and equipment to condition existing before initial training use. |
| 024119 fl - selective demolition |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| B. Related Requirements: |
| 1.3 DEFINITIONS |
| A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled. |
| B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse. |
| C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. |
| D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled. |
| 1.4 MATERIALS OWNERSHIP |
| A. Unless otherwise indicated, demolition waste becomes property of Contractor. |
| B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner. |
| 1.5 FIELD CONDITIONS |
| A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted. |
| B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. |
| C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. |
| D. Storage or sale of removed items or materials on-site is not permitted. |
| E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. |
| PART 2 - PRODUCTS |
| 2.1 PEFORMANCE REQUIREMENTS |
| A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. |
| B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Verify that utilities have been disconnected and capped before starting selective demolition operations. |
| B. Review record documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in record documents. |
| C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required. |
| D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect. |
| 3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS |
| A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage. |
| B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished. |
| 3.3 PREPARATION |
| A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. |
| B. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished. |
| 3.4 SELECTIVE DEMOLITION, GENERAL |
| A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: |
| B. Removed and Salvaged Items: |
| C. Removed and Reinstalled Items: |
| D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete. |
| 3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS |
| A. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, then remove concrete between saw cuts. |
| B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, then remove masonry between saw cuts. |
| C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove. |
| 3.6 DISPOSAL OF DEMOLISHED MATERIALS |
| A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill. |
| B. Burning: Do not burn demolished materials. |
| C. Disposal: Transport demolished materials off Owner's property and legally dispose of them. |
| 3.7 CLEANING |
| A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began. |
| 033053 fl - miscellaneous cast-in-place concrete |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. |
| 1.3 QUALITY ASSURANCE |
| A. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment. |
| B. Comply with the following sections of ACI 301 (ACI 301M), unless modified by requirements in the Contract Documents: |
| C. Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials." |
| PART 2 - PRODUCTS |
| 2.1 FORMWORK |
| A. Furnish formwork and formwork accessories according to ACI 301 (ACI 301M). |
| 2.2 STEEL REINFORCEMENT |
| A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed. |
| 2.3 CONCRETE MATERIALS |
| A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout Project: |
| B. Normal-Weight Aggregate: ASTM C 33, graded, 1-1/2-inch (38-mm) nominal maximum aggregate size. |
| C. Water: ASTM C 94/C 94M. |
| 2.4 CONCRETE MIXTURES |
| A. Comply with ACI 301 (ACI 301M) requirements for concrete mixtures. |
| B. Normal-Weight Concrete: Prepare design mixes, proportioned according to ACI 301 (ACI 301M), as follows: |
| 2.5 CONCRETE MIXING |
| A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M, and furnish batch ticket information. |
| B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer. |
| PART 3 - EXECUTION |
| 3.1 FORMWORK |
| A. Design, construct, erect, brace, and maintain formwork according to ACI 301 (ACI 301M). |
| 3.2 EMBEDDED ITEMS |
| A. Place and secure anchorage devices and other embedded items required for adjoining work attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. |
| 3.3 STEEL REINFORCEMENT |
| A. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement. |
| 3.4 JOINTS |
| A. General: Construct joints true to line with faces perpendicular to surface plane of concrete. |
| B. Construction Joints: Locate and install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect. |
| C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness, as follows: |