Design for Nebraska St. BikePed Bridge & Airport Wash Greenway

Closed State & local contract opportunity

Solicitation number
260115
State
Arizona
Responses due

Opportunity facts

Jurisdictions
UNSPSC codes
Show all 22
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Tucson is seeking professional design, engineering, and public engagement services for a new bicycle and pedestrian bridge project over Interstate 19, specifically connecting the planned Nebraska Street Bicycle Boulevard to the Spectrum Mall and the Chuck Huckelberry Loop shared-use path system. The project, funded through the USDOT Reconnecting Communities Pilot Planning Grant, requires a multi-disciplinary consultant team to develop comprehensive design concepts, prepare preliminary and final design plans, and assist with public engagement. Key deliverables include bridge alignment determination, design plans, environmental clearance documents, and identification of utility and agency coordination tasks. The project scope encompasses designing bridge type and materials, expanding the existing path network with fully accessible sidewalks, enhanced bicycle lanes, native landscaping, and potential public art integration. A pre-submittal conference is scheduled for November 5, 2025, at 10:00 am, with statements of qualifications due on November 18, 2025, at 2:00 pm local Arizona time.

The procurement includes specific small business and disadvantaged business enterprise (DBE) requirements, with a 1% Small Business Enterprise participation goal and comprehensive provisions for minority business engagement. Contractors must submit detailed documentation demonstrating good faith efforts to include small and minority businesses, including a Subcontractors List and Proposed SBE Plan listing all SBE subcontractors with contracts valued at $5,000 or more. The project has a total budget of $1,125,000, comprising $900,000 in federal funds and $225,000 in non-federal matching funds, with individual projects not to exceed this amount without written waiver. Potential subcontracting opportunities exist in environmental clearance support, public engagement, and landscape architecture. The City of Tucson may impose penalties for non-compliance, including withholding payments, contract termination, or disqualification from future bidding. The project aligns with local equity and environmental justice goals, targeting community reconnection and improving multimodal transportation infrastructure.

Opportunity text

The City of Tucson is seeking professional design, engineering, and public engagement services for a new bicycle and pedestrian bridge over Interstate 19 (I-19), connecting the planned Nebraska Street Bicycle Boulevard to the Spectrum Mall and to the Chuck Huckelberry Loop shared-use path system along the Santa Cruz River via an extension to the future Airport Wash Greenway. The consultant team will develop a design concept, prepare preliminary and final design plans, assist with public engagement, prepare relevant environmental clearance documents in accordance with ADOT/FHWA requirements and identify utility and agency coordination tasks.

The design process will determine project elements including: bridge alignment, type and materials, expansion of existing path network, including new paved paths, fully accessible sidewalks and enhanced bicycle lanes, and native landscaping and public art. Design funding for this project is through the USDOT Reconnecting Communities Pilot Planning Grant.

Files

Show all 22

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors